Auckland Metro proposed Ontime
Renewals by Line Section
Auckland Metro Network Map
s
Map
ork
w
et
N
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
RNGIM Delivery Team
Fastenings
Delkor eggs in Britomart tunnel
Ontime
BOL
+ Contractors + BAU
Overhead
Line
Replacement of damaged section insulators
Ontime
BOL
BAU + Contractors
Equipment
Britomart
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
RNGIM Delivery Team
on
Level Crossing
Level Crossing upgrade at Metcalfe Road
Ontime
BOL
+ Contractors + BAU
RNGIM Delivery Team
Formation
Level Crossing upgrade at Metcalfe Road
Ontime
BOL
+ Contractors + BAU
RNGIM Delivery Team
Swans
Drainage
Level Crossing upgrade at Metcalfe Road
Ontime
BOL
+ Contractors + BAU
to
RNGIM Delivery Team
Ballast
Level Crossing upgrade at Metcalfe Road
Ontime
BOL
+ Contractors + BAU
n
RNGIM Delivery Team
so
Retaining Wall
Retaining Wall upgrade at NAL 24+269
Overdue
BOL
+ Contractors + BAU
nder
He
W
NAL
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
Points
Associated works with Newmarket Diamond
ynn
Ontime
BOL
BAU + Contractors
Equipment
upgrade
L
Earth grid upgrade for access and isolation
w
Earthing
Ontime
BOL
BAU + Contractors
requirements
Ne
Interlocking
Battery replacement due to age and
Ontime
BOL
BAU + Contractors
Systems
deterioration
to
Active Level
t
Pedestrian Level Crossing and mechanisms
Crossing
Ontime
BOL
BAU + Contractors
upgrade
Equipment
ke
wmar
Ne
W
NAL
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
RNGIM Delivery Team
Sleepers
Poor condition sleeper on Bridge 5
Ontime
BOL
+ Contractors + BAU
Poor condition sleeper on Bridge 10
RNGIM Delivery Team
Sleepers
Ontime
BOL
+ Contractors + BAU
Earth grid upgrade for access and isolation
Earthing
Ontime
BOL
BAU + Contractors
requirements
S
Line Side
Network switch replacement due to age
Ontime
BOL
BAU + Contractors
L
Equipment
Culvert replacement between Penrose and
RNGIM Delivery Team
Culverts
Overdue
BOL
NA
Newmarket
+ Contractors + BAU
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
Fastenings
Delkor eggs in Newmarket Triangle
Ontime
BOL
BAU + Contractors
Poor condition sleeper on Bridge 8 above
RNGIM Delivery Team
Sleepers
Ontime
BOL
Line
Ronayne St, Parnell
+ Contractors + BAU
Installation of water pump, AC unit and
Substations
emergency generator for resilience in the
Ontime
BOL
BAU + Contractors
nch
NWMKT TCS
Points
Associated works with Newmarket Diamond
RNGIM Delivery Team
Overdue
BOL
Bra
Equipment
upgrade
+ Contractors + BAU
t
Tunnel lining upgrade for Parnell Tunnel 1
RNGIM Delivery Team
Tunnel
Overdue
BOL
NWMKT for structural integrity
+ Contractors + BAU
rke
Strengthening NWMKT Bridge 6 for structural
RNGIM Delivery Team
Bridge
Overdue
BOL
integrity
+ Contractors + BAU
ma
New
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
T E
RNGIM Delivery Team
Turnout
Destress associated with turnout replacement
Ontime
BOL
+ Contractors + BAU
IM
Poor condition sleeper on Bridge 387 along
RNGIM Delivery Team
Sleepers
Ontime
BOL
Tamaki Dr before the Parnell pool
+ Contractors + BAU
ia N
Installation of water pump, and arc flash
Substations
Ontime
BOL
BAU + Contractors
v
monitoring for resilience in the Westfield TCS
Poor condition sleeper on Bridge 387 along
RNGIM Delivery Team
Sleepers
Overdue
BOL
Tamaki Dr before the Parnell pool
+ Contractors + BAU
RNGIM Delivery Team
Slopes
Unmitigated slope at NIMT embankment 678
Overdue
BOL
+ Contractors + BAU
Tunnel lining upgrade for Purewa Tunnel 19
RNGIM Delivery Team
Tunnel
Overdue
BOL
NIMT for structural integrity
+ Contractors + BAU
to Britomart
d
fiel
est
W
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
RNGIM Delivery Team
Sleepers
Takanini resleepering associated with formation
Ontime
SLR
+ Contractors + BAU
Installation of water pump, fencing and
ri
Substations
Ontime
BOL
BAU + Contractors
monitoring for resilience in the Wiri TCS
Wi
RNGIM Delivery Team
Sleepers
Poor condition sleeper on Bridge 338
Ontime
BOL
+ Contractors + BAU
to
Turnout 2253B replacement at NIMT 646+616
RNGIM Delivery Team
Turnout
Overdue
BOL
due to condition
+ Contractors + BAU
Points
Associated works with Turnout 2253B
RNGIM Delivery Team
Overdue
BOL
Equipment
replacement
+ Contractors + BAU
Associated works with Turnout 2253B
RNGIM Delivery Team
Formation
Overdue
BOL
replacement
+ Contractors + BAU
Associated works with Turnout 2253B
RNGIM Delivery Team
Papakura
Drainage
Overdue
BOL
replacement
+ Contractors + BAU
Formation replacement between 646.653 and
RNGIM Delivery Team
Formation
Overdue
BOL
657.514
+ Contractors + BAU
Subsurface drainage renewals between 652.108
RNGIM Delivery Team
Drainage
Overdue
BOL
and 652.884
+ Contractors + BAU
Auckland Metro FY25
Renewals
Renewal
Access
Work
Reason/Comments
Resources
Category
Requirements
Overhead Line
Realignment of wire across the bridges/footpaths
Ontime
BOL
BAU + Contractors
Equipment
and level crossing within the area
Safety initiatives for rail storage and personnel –
Facilities
Ontime
SLR
BAU + Contractors
restriction of public
ield
RNGIM Delivery Team
f
Formation
Associated works with Turnout 1557 replacement
Overdue
BOL
t
+ Contractors + BAU
RNGIM Delivery Team
es
Drainage
Associated works with Turnout 1557 replacement
Overdue
BOL
+ Contractors + BAU
W
RNGIM Delivery Team
Ballast
Associated works with Turnout 1557 replacement
Overdue
BOL
+ Contractors + BAU
o t
RNGIM Delivery Team
Ballast
Associated works with Turnout 1663A replacement
Overdue
BOL
ri
+ Contractors + BAU
Backlog resleepering at 664.39, 664.464 and
RNGIM Delivery Team
Wi
Sleepers
Overdue
BOL
664.507
+ Contractors + BAU
Formation replacement between 665.234 and
RNGIM Delivery Team
Formation
Overdue
BOL
666.034
+ Contractors + BAU
Subsurface drainage renewals between 664.510
RNGIM Delivery Team
Drainage
Overdue
BOL
and 664.986
+ Contractors + BAU
Wellington Metro BAU + Backlog
Renewals by Line
Wellington Metro FY25 Renewals
Work
Reason/Comments
Renewal
Access
Category
Requirements
Resources
Porirua Seawall
Repairs have remained unfunded for multiple years resulting in TSRs
BAU + Contractors + KR
and recent timetable impacts to the NIMT
Overdue
Weekend/Long Weekend
BOLs
RMA + KR Eng
ne
Bridge 3 NIMT
Resleeper, painting, walkway and ducting renewals required
Overdue
Christmas BOL
BAU + Contractors + KR
Procurement + LNI Str
Li
Slope stabilization
Design of critical NIMT slope works between Pukerua Bay and
+ Retaining wall
Paekakariki & Paraparaumu
Overdue
Nil
Consultants + KR Eng + KR
RMA
Bridge spot
painting & minor
Bridge 4, painting, rerail/realignment, Br 9, Br 11, 20
Overdue
Weekend/Long Weekend
Consultants + Contractors +
renewals
BOLs
KR Procurement
Trunk
Platform renewals
Paremata and Linden platforms renewal and platform civil design
Overdue + Ontime
Long Weekend BOLs
Consultants + Contractors
Culvert upgrades
Design and temporary works of 27km & 28km culvert upgrades – risk
ain
of washout of the rail corridor
Overdue
Long Weekend BOLs
BAU + Contractors+ KR Eng
KR Eng + KR RMA
M
Tunnel Lining
Replacement of lining in Tunnel 1 & 2 NIMT to protect traction/track
assets from water egress
Overdue + Ontime
Nights + BOLs
BAU + Contractors + KR
Eng
McLellan St Ped
LX Upgrade
Public safety critical upgrades
Overdue
Weekend/Long Weekend
BOLs
BAU + Contractors
Signals power
BAU + Contractors + KR
supply upgrade
Signals power supply design and upgrade needed at North Junction
Overdue
Long Weekend BOL +
Under live traffic where safe
Eng + KR Procurement
Island
Traction Minor
h
Renewals
Substation/Switching/Facility Upgrade/Bonding/Spark gaps
Overdue
Weekend BOLs + Under live
traffic where safe
BAU
Christmas + Long
ort
NIMT Track
renewals
23 renewals, majority are rerails (80%), some resleepers, and relays.
Overdue + Ontime
Weekend/Weekend BOLs +
BAU + Contractors + LNI
Early nights BOLs
N
Porirua 3x Turnout
Turnouts with NDT faults and life expired
Overdue
Christmas + Matariki BOLs
BAU + Contractors + LNI
Wellington Metro FY25 Renewals
Work
Reason/Comments
Renewal
Access
Category
Requirements
Resource
ne
Track relays
3 jobs in total within Hutt Valley Line
Overdue
Weekend/Long Weekend
BOLs
BAU + Contractors
Li
Melling relay (800m)
Asset is life expired, failure would result in service
frequency changes, or Melling line closure
Overdue
Multiple Weekend BOLs or
during Riverlink closure
BAU + Contractors
pa
B11A/B crossover
Renewal required due to shunting safety requirements
replacement
at Masterton yard
Overdue
Weekend BOL
BAU + Contractors
ra
Upper Hutt stabling
Yard assets are life expired and require renewal, 2
yard renewal
roads are currently closed leading to operational
Overdue
Various access options
BAU + Contractors
impacts/TSRs
aira
Woburn Turnouts
Asset is life expired. Failure wil result in closure of rail
W
1488B & 1481B
access to the Gracefield siding and Hutt Workshops
Overdue
Weekend BOL
BAU + Contractors
Weekend/Long Weekend
Traction Renewals
Wooden feeder pole removal and upgrade of DC
BOLs
cabling
Overdue
+ Under live traffic where
Contractors + BAU
safe
Traction Minor
Substation/Switching/Facility Upgrade/Bonding/Spark
Renewals
gaps
Ontime
Weekend BOLs + Under live
traffic where safe
BAU
t Valey &
BAU + Contractors +
Br 19 Ava Bridge
Life expired sleepers and rail, currently under TSR, and
repainting + Walkway lease agreement and HCC
Overdue
Easter – ANZAC
HCC + KR
ut
relay/walkway/paint
contribution
Procurement + LNI
Str
H
Platform renewals
Taita and Pomare platforms renewal and platform civil
design
Ontime
Long Weekend BOLs
Consultants +
Contractors
Wellington Metro FY25 Renewals
Work
Reason/Comments
Renewal Category
Access
Requirements
Resource
Khandallah 3a/b
Crossover is life expired. New design
BAU + Consultants
crossover and
requires embankment upgrades for
Overdue
Design Access (2
weeks)
+ Contractors + KR
ne
embankment + Relays
compliance to current standard
Eng
Turnout 88
Wel ington Station
Life expired
Overdue
Long Weekend BOLs
BAU + Contractors
Ngaio 3A/B & 7A/B
ile Li
crossover &
Pedestrian Subway
Design of underpass and crossover -
design and
turnouts in poor condition
Overdue + Ontime
None required
Consultants + KR
Eng
onv
procurement
Traction structure
Last remaining wooden structures on the
renewals (WMUP II)
JVL replaced (7 masts, multiple switch
Overdue
Christmas or Easter
relocations)
BOL + Labor Weekend
BAU + Contractors
Johns
Design Access (2
Track renewals
Relay and multiple rerails
Overdue + Ontime
weeks) + Christmas
BAU + Contractors
BOLs
+ LNI
Slope stabilization &
Multiple slope locations (TBC) requiring
monitoring
stabilizing work/monitoring
Overdue
Long/Weekend BOLs
Contractors
Telecommunications
repeater upgrade
To address dead spots on the JVL & NIMT
Overdue + Ontime
None required
BAU + Contractors
Tunnel Lining
Tunnel 7 Crack remediation work
investigation
Ontime
Weekend BOLs
BAU + Consultants
+ KR Eng
Wellington Metro FY25 Renewals
Work
Reason/Comments
Renewal Category
Access
Requirements
Resource
Design of yard for compliance to current
West Car Yard Upgrade
standard + procurement of turnouts only,
Overdue
Nill
KR Eng +
its
delivery plan for FY26
Consultants
Double Slip 64A/63B
Asset is life expired. Critical location in
design & procurement
the station throat, multiple recent failures
Overdue
None required
KR Eng +
have caused service impact
Consultants
Double Slip 60B/63A
Asset is life expiring. Critical location in
KR Eng +
design & procurement
the station throat
Ontime
None required
Consultants
ation Lim
Design only WLG Station
KR Eng +
78A, 82A/B, 85B, DIA
Life expired turnouts with multiple failures
Overdue + Ontime
None required
Consultants
75/43
Design & tamping Distant
KR Eng +
junction 27A/B, 9A/B,
Multiple EM80 gauge faults and faulty
Consultants
5A/B, 3A/B
components
Overdue + Ontime
None required
elington St
W