This is an HTML version of an attachment to the Official Information request 'Cost of Fairy Falls upgrade'.

 
 
 
      08 November 2024 
Official information request 8140014699 
 (Please quote this in any correspondence) 
 
 
t Austen 
By email: [FYI request #28751 email] 
 
 
Tēnā koe 
 
Local Government Official Information and Meetings Act 1987 
Re: Cost of Fairy Fal s upgrade 
 
 
Thank you for your email dated 14 October 2024, in which you requested information costs 
relating to Fairy Falls track. The specific details of your request and our response are below. 
  1.  How much did the new board-walks, steps, bridge and associated structures 
on the Fairy Falls track cost? 
 
Project costs for the upgrade of Fairy Falls track totalled $1,468,001.58. The site’s steep 
terrain required materials to be transported via helicopter, adding to the complexity of the 
project. Additionally, the numerous steps, stairs, and amount of physical structure needed to 
ensure the track's longevity are key factors contributing to the overall cost. 
 
Please refer to the below table for the breakdown of the costs relating to the construction of 

the Fairy Falls track. 
 
Construction Monitoring / Contract Management / 
Building & Resource Consent Compliance 
$96,451.00 
Supply of aggregate material for track surface 
$51,
 
842.31 
Physical works  
$1,294,852.27 
AC Time charge costs 
$24,856.00 
TOTAL 
$1,468,001.58* 
 
*Please note costs do not include design. 

 
2.  What was the cost of upgrading the rest of the track including the new track 
from Tawari Road? 
 
Renewal of the rest of the track was conducted by Park Rangers and contracted labour 

funded by the central government “Jobs for Nature” programme.  
 
Private Bag 92300, Auckland 1142  |  aucklandcouncil.govt.nz  |  Ph 09 301 0101 


We are unable to provide material and wage costs provided through Jobs for Nature as the 
employees moved between multiple sites over time and compiling the costs would require 
extensive manual collation and review of numerous claim files. 
 
The only additional material cost (to what has already been provided above) for completion 

of that section is for a gravel delivery. The final cost is stil  to be confirmed but is 
approximately $2600.00. Some adhoc materials were used from our workshop stores (e.g. 
culvert pipe, timber) however these are bulk purchased, and we do not record the volumes 
used per track.  
 
Decisions relating to the information that is being released to you were made by Taryn Crewe, 
General Manager - Parks and Community Facilities. 
 
You have the right to complain to the Ombudsman if you believe we have not responded 
appropriately to your request. Information about how to make a complaint is available at 
www.ombudsman.parliament.nz or freephone 0800 802 602. 
 
If you have any further queries, please contact me on 09 301 0101 quoting official information 
request number 8140014699. 
 
Ngā mihi  
 
Amanda Pil ay 
Privacy and Official Information Business Partner 
Customer Experience and Digital Services 