Schedule
Standard equipment list – Type 2 Appliance
(FL3-1 SCb)
The requirement to carry optional items is determined by District management.
E.g. Class B foam is determined by district management
To prevent overloading do not exceed maximum locker weight.
ACT 1982
Related information
Schedule
Equipment deployment schedule (E1-4)
Policy
Appliance equipment requirements policy (FL3-1 POP)
Extinguishers
INFORMATION
DP 9 kg or 2 x 4.5
1
CO² 3 kg
1
Foam
Class A Foam concentrate in 60 litres in internal tank
(older appliances may have 3 x 25 litre containers)
3
Ladders (older appliances may have a wooden rescue ladder and an access ladder)
Short extension ladder 3.6 metre or multipurpose ladder
1
AS Rescue ladder
1
First aid/rescue
First aid kit
1
Manual resuscitator
1
Gloves - barrier (box)
1
Defibril ator (optional)
1
Oxygen therapy
1
Safety
IGC radios
4
Lightweight helmets (optional)
4
Dust masks P2 box
1
RELEASED UNDER THE OFFICIAL
Cordon tape roll
1
Nominal rol tal y
1
Earplugs box
1
8 July 2022
1
Schedule - Standard equipment list – Type 2 Appliance (FL3-1 SCb)
Jerkins
9
Torches
4
Gloves - heat resist (pair)
1
Incident command board (optional)
1
Goggles
4
Water bottle (750ml)
8
Road cones may be ridged or col apsible
8
Small gear
Sledgehammer
1
ACT 1982
Bolt cutter
1
Wrecking bar/hooligan tool
1
Axe large
1
Axe smal
1
Spade/shovel
1
Toolbox containing smal tools
1
Claw hammer/nails
1
Lines
INFORMATION
Lowering line (roof kit)
1
G P lines (20-30m)
2
Bucket line
1
Line rescue pack (optional)
1
Portable equipment
Portable generator (optional)
1
Lighting accessories (optional)
1
Portable water pump (optional)
1
PPV fan (optional)
1
Fuel cans 9 litre as required
1 or more
Waterway
Nozzles control ed
3
Foam nozzle/attachment
1
Suction strainer
1
Suction basket strainer
1
Suction spanners
2
Standpipes – screw down (second optional)
1
RELEASED UNDER THE OFFICIAL
Key and bar
1
Ground monitor (optional)
1
Col ecting breeching
1
Dividing breeching
1
8 July 2022
2
Schedule - Standard equipment list – Type 2 Appliance (FL3-1 SCb)
Female/female adaptor
1
Male/male adaptor
1
Hose ramps (90 mm)
2
Hose reel spanners
2
Ejector pump type B (optional)
1
Water dragon (optional)
1
Breathing apparatus
Complete sets
4
Spare cylinders
4
ACT 1982
Main guideline
1
Stage 1 control board
1
ECO jerkin
1
Stage 2 control board (optional)
1
Salvage
Ceiling hook
1
Salvage sheets
4
Mop
1
INFORMATION
Bucket
1
Broom
1
Squeegee
1
Hazardous substances
Information board
1
Splash suit
4
HazMat spil kit
1
Disposal packs - 2 bags with labels and ties
4
Emergency decontamination kit (1-pump station appliances carry 4 kits; 2-pump station
2 or 4
appliances carry 2 kits)
Forestry
Forestry pack
1
Forestry nozzle
1
Dividing breeching
1
Hose
Delivery hose sets (3 x 70mm, 1 x 45mm)
2
70mm flaked feeders
6
70mm coiled
4
RELEASED UNDER THE OFFICIAL
45mm coiled
2
100mm suction hose
4
Portable cutting equipment
8 July 2022
3
Schedule - Standard equipment list – Type 2 Appliance (FL3-1 SCb)
Chainsaw and accessories (optional)
1
Disc cutter saw and accessories (optional)
1
Reciprocating saw (optional)
1
Skil saw (optional)
1
Rescue equipment (if designated PRT)
Motorised hydraulic power unit
1
Hydraulic hoses 3 pairs
3
Secondary power unit (optional)
1
Cutters
1
ACT 1982
Spreaders
1
Extension rams
3
Airbags
2
Airbag control valves
2
Engineers toolkit
1
Portable winch
1
Sil plate
1
Step chocks
4
INFORMATION
Cribbing varies
Tool stage sheet (2m x 2m)
1
Glass bag and kit
1
Soft and hard patient protection
4
Safety glasses (ful wrap)
4
Large crowbars
1
Assorted strops and chains
4
Pedal cutter (optional)
1
Basket stretcher
1
Entrenching tools
2
25T Bottle jacks (optional)
1
RELEASED UNDER THE OFFICIAL
8 July 2022
4
Schedule - Standard equipment list – Type 2 Appliance (FL3-1 SCb)
Document information
Move Document information to the bottom of the page (or top of page 2, if only one page).
Owner
Fleet
Steward
Don McErlich
Last reviewed
8 July 2022
Review period
Every second year
Record of amendments
Date
Brief description of amendment
ACT 1982
July 2022
Reviewed. B class foam and foam making equipment are not standard stowage items and
wil be al ocated to appliances by District Managers. Template update.
April 2014
Screw down standpipes al ocation changed from 2 to 1, with second optional.
April 2014
Added "Jerkins" to the list .
July 2014
Changed "Rope rescue" to "Line rescue"
July 2014
Added "IGC radios" and "HazMat spil kit" to the list.
Aug 2014
"Optional" added after "Stage 2 control board".
Aug 2014
"3 x 70mm, 1 x 45mm flaked deliveries" changed to " Delivery hose sets (3 x 70mm, 1 x
45mm)".
INFORMATION
Number of 70mm flaked feeders increased to 6.
Nov 2017
Changes to Waterways section:
• Number of Nozzles controlled changed from 4 to 3
• Foam nozzles changed to Foam nozzle/attachment
• Branch straight 25 mm nozzle removed from list.
RELEASED UNDER THE OFFICIAL
8 July 2022
5
Document Outline