Table 1 – School buildings in High seismic zone confirmed below 34% NBS.
(Building Act remediation timeframe – 7.5 years)
1982
School Name
Building
Building Typology
% NBS Rating / status
Number
Act
Block V (I Block)
Two storey classroom block
15 (to be demolished 2024)
Burnside High School
Block JX (J
Two storey classroom block
15 (to be demolished 2024)
Block)
Kirkwood Intermediate
Block 1 (Hall)
Single-storey, timber-framed
15 (Construction planned to commence end of 2024)
Napier Boys’ High
Block G (Gym)
Single-storey, timber-framed
30 (Design underway)
School
Onslow College
A (Technical)
Single-storey, timber-framed
30 (Planning underway)
Information
C (Cafeteria)
Single-storey, timber-framed
30 (Planning underway)
Palmerston North
D (Stephens)
Two storey classroom block
<34 (Construction commenced November 2021 with the final
Girls’ High School
stage to commence October 2024)
1 (C Rm Admin)
Single-storey, timber-framed
15 (Construction commenced early 2024 and expected to be
Official completed end of 2024)
Porirua East
3 (5 C Rm
Single-storey, timber-framed
15 (Construction commenced mid-2024 and expected to
the
Junior)
completed early 2025)
Rongotai College
EC (Recreation)
Single-storey, timber-framed
26 (Not in use - proposed to be demolished in 2025)
A (Main Block)
Two storey classroom block
15 (Proposed to be demolished in 2025)
Taihape Area School
under
A (Gym)
Single-storey building with part basement
15 (Construction planned to commence 2026)
Taita College
R (New Gym)
Single-storey building
<34 (Planned to start in 2026/7 as part of the schools 10-year
property plan)
Wairarapa College
Sutherland
Two storey admin and teaching block
20 (In Construction)
Block
1
16 August 2024
Released
School Name
Building
Building Typology
% NBS Rating / status
Number
Wellington Girls’
K (Pipitea Block) Four storey teaching and admin block
<34 (Design complete)
1982
College
G Brook Block
Four storey teaching and admin block
15 (Planning underway)
Act
Wellington High
A Block +
Five storey teaching block
25 (Planning underway)
School and
Services Tower
Community Education
Centre
Information
Official
the
under
Released
Table 2 – School buildings in Medium seismic zone confirmed below 34% NBS.
(Building Act timeframe – 12.5 years)
1982
School Name
Building
Building Typology
% NBS Rating
Number
Act
H (Hepburn)
Three storey teaching block with part
<34 (Strengthening design expected to commence end of 2024)
Hamilton Girls’ High
basement
School
G (Gym)
Single storey building with part
20 (Proposed to be demolished, replacement gym in design
basement
stage)
Tauranga Girls’
J1 (Block J1
Four storey teaching block
15 (In construction and expected to be complete end of 2024)
College
Faculty of
Science)
Whanganui City
B (Tower
Six storey teaching block
25 (Project planning to commence by the end of 2024)
Information
College
Block)
Official
the
under
Released
Table 3 – School buildings in Low seismic zone confirmed below 34% NBS.
(Building Act remediation timeframe – 35 years)
1982
School Name
Building
Building Name
% NBS Rating
Number
Act
4 (Whainga)
Two-storey teaching block
21 (Design commenced)
5 (Kaitataki)
Two-storey teaching block
21 (Design commenced)
101073/76/77 Two-storey admin and teaching block
25 (Design commenced)
Spine Block
(Admin,
Technology,
Performing
Alfriston College
Arts, Music &
Information
Library)
101078
Two-storey teaching block
21 (Design commenced)
(Kaitoro)
101078
Two-storey teaching block
21 (Construction to commence end of 2024)
(Tirohanga)
Official
Whanau
Two-storey teaching block
21 (Design commenced)
(Auaha)
the
Mt Roskill Grammar
HL (Hall)
Single-storey building
22 (Work to be undertaken over 2024 Christmas break)
School
Otago Boys’ High
F (Shand)
Two-storey teaching block
<34 (In construction)
School
under
Rangitoto College
L2 (L Block
Three-storey teaching block
26 (Proposed to be demolished)
Soft Tech)
Released