![](./foiextract20240605-820-1hzcagd-1_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-2_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-3_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-4_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-5_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-6_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-7_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-8_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-9_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-10_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-11_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-12_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-13_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-14_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-15_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-16_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-17_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-18_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-19_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-20_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-21_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-22_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-23_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-24_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-25_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-26_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-27_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-28_1.jpg)
Item 5
Act
Sec 9(2)(a)
Sec 9(2)(a)
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-29_1.jpg)
Act
Information
Official
the
Sec 9(2)(a)
Sec 9(2)(a)
under
Sec 9(2)(a)
Released
Act
Information
Official
the
under
Released
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-32_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-33_1.jpg)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-34_2.png)
Item 6
Ref: DOC-7264800
17 February 2023
Act
Sec 9(2)(a)
Bendigo Station
RD3
CROMWELL
Tēnā koe Sec 9(2)(a)
LETTER OF AUTHORITY: APPROVAL FOR FURTHER MINERAL EXPLORATION
WITHIN BENDIGO CONSERVATION COVENANT
Approval is granted to you, subject to the conditions outlined in Appendix A of this letter, under
Information
Section 77 of the Reserves Act 1977, to authorise Matakanui Gold Limited to undertake the following
mineral exploration activities:
1)
Drilling at a further 50 sites and to construct associated temporary drill pads, within the
target area identified in the application as Rise and Shine (RAS).
The above activities were considered as described in the application received on 11 January 2023.
Official
This approval is specific to the application that is described above. It is not indicative of any
associated concession or other statutory approval which may be required from the Department in
respect to future exploration or mining in the Bendigo Conservation Covenant.
the
Any change to the application will require that it be resubmitted to me for approval.
Please note that a copy of this letter will also be sent to Matakanui Gold Ltd for their signature of
acceptance of the conditions.
Thank you for having regard to the interests of the Department of Conservation (Department).
under
Ngā mihi,
Nicola J Holmes
Pou Matarautaki Operations Manager, Central Otago District
Released
Pursuant to delegated authority
Department of Conservation Te Papa Atawhai
Central Otago District Office
PO Box 176, Alexandra 9320
www.doc.govt.nz
Action Required A representative from Matakanui Gold Limited is to sign this letter, return it to the
Department prior to the commencement of the drilling works, and keep a copy to
confirm the conditions.
Representative from Matakanui Gold Limited
Act
Name
Signed
Date
Sec 9(2)(a)
Sec 9(2)(a)
_
______
______
_____________
Position
Sec 9(2)(a)
_
Information
Official
the
under
Released
Department of Conservation Te Papa Atawhai
Central Otago District Office
PO Box 176, Alexandra 9320
www.doc.govt.nz
Appendix A – Special Conditions
General
1.
All necessary resource consents/council approvals associated with the construction of
temporary drill pads, must be obtained and conditions adhered to.
2.
All conditions and recommendations outlined in the 9 September 2021 archaeological
assessment report and June 2021 ecological and botanical report, commissioned by Matakanui
Gold Ltd, must be adhered to.
Act
3.
All machinery, tools and equipment must be steam cleaned so that it is free of weed seeds,
plant fragments and mud prior to entering the land.
4.
All machinery, tools and equipment must be re-cleaned after is has operated in previous
sections of the land where weed infestations are present.
5.
Machinery and equipment used on site must be maintained at all times to prevent leakage of
oil and other contaminants on to the land.
6.
Any vegetation removal and soil disturbance must be kept to a minimum. No native vegetation
is to be disturbed.
7.
Prior to construction of temporary drill pads a suitably qualified and experienced botanical
specialist must identify, and brief contractors, where avoidance of native vegetation is
Information
required.
8.
Any rocky outcrops found to be present within the affected areas must not be disturbed.
9.
Other than required temporary drill pads, no access tracks, campsites or other soil disturbance
must be undertaken during the works.
10. Appropriate drill hole warning signs are to be erected and all open drill holes are to be taped
off using high visibility tape when unattended.
Official
11.
All temporary drill pads and drill holes must be fully rehabilitated, including revegetated,
within three years from the commencement date of construction.
the
12. Immediately upon the completion of works, Matakanui Gold Ltd. must reinstate the land to
the same or better condition it was before works commenced.
13. Revegetation planting of disturbed areas must be conducted under the advice of a suitably
qualified and experienced botanical specialist (agreed with the Department) and in alignment
with the objectives of the covenant.
14.
under
The Department, including any designated representative of the Department, may undertake
on- site monitoring to confirm compliance with the conditions contained herein. Matakanui
Gold Ltd. shall meet the associated costs of such monitoring undertaken by the Department.
Heritage
15. No historic sites identified in the Mamakau (Nichol & Wright) Consultancy 2006
archaeological survey report, the ‘Rich Fields of Bendigo’ by Jill Hamel 1993 (subsequently
identified on the orthophotos provided with the Matakanui Gold Ltd Drilling Programme,
received 15 October 2017), the NZ Archaeological Association Site Recording Scheme and the
NZ Heritage Properties archaeological assessment dated the 13 August 2021, will be affected
when undertaking the work.
Released
16. At any time during the drilling and construction of associated drill pads, in the event of any
‘accidental discovery” of suspected archaeological material, including human remains, The
Accidental Discovery Protocol must be followed and adhered to.
Department of Conservation Te Papa Atawhai
Central Otago District Office
PO Box 176, Alexandra 9320
www.doc.govt.nz
17. Prior to commencement of drilling, and construction of associated drill pads, within areas
having previously undergone an archaeological survey by NZ Heritage Properties Limited
(attached as Appendix B):
• Consultation must be undertaken with a suitably qualified and experienced
archaeologist and resulting recommendations and advice adhered to.
• Provide the resulting archaeological written advice to the Departments Central Otago
District Office ([email address]).
18.
Act
Prior to commencement of drilling, and construction of associated drill pads, within areas
identified as
not having previously undergone an archaeological survey (attached as Appendix
B), a suitably qualified and experienced archaeologist must:
• Undertake an on the ground survey of the proposed drill hole and drill pad sites to
ensure no heritage features are affected.
• Suitably mark (i.e.: clearly visible tape or marker pegs) any heritage features found to
be present in the vicinity of the works, to ensure no accidental damage occurs.
• Provide an updated archaeological assessment report to the Department’s Central
Otago District Office ([email address]) within one month of completion of the
archaeological ground survey.
Information
Reporting
19. A detailed annual report must be submitted to the Department’s Central Otago District Office
([email address]) by 31 December of each year. The annual report must include, but
is not limited to, the following:
• Topographic location map of rehabilitated drill holes and drill pads.
• Topographic location map of active - yet to be rehabilitated - drill holes and drill pads.
Official
• Photographic record (before construction/post rehabilitation) of rehabilitated drill
holes and drill pads, cross referenced to the corresponding topographic location map.
the
• Construction commencement dates of all active – yet to be rehabilitated - drill holes
and drill pads, cross referenced to the corresponding topographic location map.
• Details of plant species planted at each revegetated site.
under
Released
Department of Conservation Te Papa Atawhai
Central Otago District Office
PO Box 176, Alexandra 9320
www.doc.govt.nz
![](./foiextract20240605-820-1hzcagd-38_1.png)
Act
Information
Official
the
under
Released
Appendix C – Drilling location area 2023 (sourced from application)
under the Official Information Act
Released
Department of Conservation Te Papa Atawhai
Central Otago District Office
PO Box 176, Alexandra 9320
www.doc.govt.nz
Item 7
Form 28
Covenant variation instrument to vary land covenant
(Section 116(3) Land Transfer Act 2017)
Land registration district
Act
BARCODE
Otago
Covenantor
Surname must be underlined.
Bendigo Station Limited
Covenantee
Surname must be underlined.
Minister of Conservation
Information
Variation of covenant
The terms, covenants, or conditions contained in the covenant(s) set out in Schedule
A
are hereby affected or modified as set out in Schedule B.
Official
the
under
Released
KOW-156988-13-68-V1
![](./foiextract20240605-820-1hzcagd-41_1.png)
Act
Information
Official
the
under
Released
![](./foiextract20240605-820-1hzcagd-42_1.png)
Act
Information
Official
the
under
Released