This is an HTML version of an attachment to the Official Information request 'Bendigo Station'.

Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released 


Item 5
Act 
Sec 9(2)(a)
Sec 9(2)(a)
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
Sec 9(2)(a)
Sec 9(2)(a)
under 
Sec 9(2)(a)
Released 
 
 

 
 
Act 
 
 
 
 
 
Information 
 
 
 
Official 
 
the 
 
 
under 
 
 
 
 
Released 
 
 

 
 
Act 
 
 
 
 
Information 
 
 
Official 
 
the 
 
 
under 
 
 
 
Released 
 
 


Act 
Information 
Official 
the 
under 
Released 
 
 


Act 
Information 
Official 
the 
under 
Released 
 
 



Item 6
Ref: DOC-7264800 
17 February 2023 
Act 
Sec 9(2)(a)
 
Bendigo Station 
RD3 
CROMWELL 
Tēnā koe Sec 9(2)(a)   
LETTER OF AUTHORITY:  APPROVAL FOR FURTHER MINERAL EXPLORATION 
WITHIN BENDIGO CONSERVATION COVENANT  
Approval is granted to you, subject to the conditions outlined in Appendix A of this letter, under 
Information 
Section 77 of the Reserves Act 1977, to authorise Matakanui Gold Limited to undertake the following 
mineral exploration activities: 
1)
Drilling  at  a  further  50  sites  and  to  construct  associated  temporary  drill  pads,  within  the
target area identified in the application as Rise and Shine (RAS).
The above activities were considered as described in the application received on 11 January 2023. 
Official 
This  approval  is  specific  to  the  application  that  is  described  above.  It  is  not  indicative  of  any 
associated concession or other statutory approval which may be required from the Department in 
respect to future exploration or mining in the Bendigo Conservation Covenant.  
the 
Any change to the application will require that it be resubmitted to me for approval. 
Please note that a copy of this letter will also be sent to Matakanui Gold Ltd for their signature of 
acceptance of the conditions. 
Thank you for having regard to the interests of the Department of Conservation (Department).  
under 
Ngā mihi, 
Nicola J Holmes 
Pou Matarautaki Operations Manager, Central Otago District 
Released 
Pursuant to delegated authority 
Department of Conservation Te Papa Atawhai 
Central Otago District Office 
PO Box 176, Alexandra 9320 
www.doc.govt.nz       

Action Required 
 
A representative from  Matakanui Gold Limited is to sign this letter, return it to the 
Department  prior  to  the  commencement  of  the  drilling  works,  and  keep  a  copy  to 
confirm the conditions.  
 
 
 
Representative from Matakanui Gold Limited 
 
Act 
Name  
 
 
 
Signed 
 
 
 
Date 
 
Sec 9(2)(a)
Sec 9(2)(a)
_
______ 
______ 
_____________ 
 
Position 

 Sec 9(2)(a)
_ 
 
 
 
 
 
Information 
Official 
the 
under 
Released 
Department of Conservation Te Papa Atawhai 
 
Central Otago District Office 
PO Box 176, Alexandra 9320 
www.doc.govt.nz        
 

Appendix A – Special Conditions  
General  
1. 
All  necessary  resource  consents/council  approvals  associated  with  the  construction  of 
temporary drill pads, must be obtained and conditions adhered to. 
2. 
All  conditions  and  recommendations  outlined  in  the  9  September  2021  archaeological 
assessment report and June 2021 ecological and botanical report, commissioned by Matakanui 
Gold Ltd, must be adhered to. 
Act 
3. 
All machinery, tools and equipment must be steam cleaned so that it is free of weed seeds, 
plant fragments and mud prior to entering the land. 
4. 
All machinery, tools and equipment must be re-cleaned after is has operated in previous 
sections of the land where weed infestations are present. 
5. 
Machinery and equipment used on site must be maintained at all times to prevent leakage of 
oil and other contaminants on to the land. 
6. 
Any vegetation removal and soil disturbance must be kept to a minimum.  No native vegetation 
is to be disturbed. 
7. 
Prior to construction of temporary drill pads a suitably qualified and experienced botanical 
specialist must identify, and brief contractors, where avoidance of native vegetation is 
Information 
required.  
8. 
Any rocky outcrops found to be present within the affected areas must not be disturbed. 
9. 
Other than required temporary drill pads, no access tracks, campsites or other soil disturbance 
must be undertaken during the works. 
10.  Appropriate drill hole warning signs are to be erected and all open drill holes are to be taped 
off using high visibility tape when unattended. 
Official 
11. 
All  temporary  drill  pads  and  drill  holes  must  be  fully  rehabilitated,  including  revegetated, 
within three years from the commencement date of construction.  
the 
12.  Immediately upon the completion of works, Matakanui Gold Ltd. must reinstate the land to 
the same or better condition it was before works commenced. 
13.  Revegetation planting of disturbed areas must be conducted under the advice of a suitably 
qualified and experienced botanical specialist (agreed with the Department) and in alignment 
with the objectives of the covenant.  
14.
under 
 
The Department, including any designated representative of the Department, may undertake 
on- site monitoring to confirm compliance with the conditions contained herein.  Matakanui 
Gold Ltd. shall meet the associated costs of such monitoring undertaken by the Department. 
Heritage 
15.  No  historic  sites  identified  in  the  Mamakau  (Nichol  &  Wright)  Consultancy  2006 
archaeological survey report, the ‘Rich Fields of Bendigo’ by Jill Hamel 1993 (subsequently 
identified  on  the  orthophotos  provided  with  the  Matakanui  Gold  Ltd  Drilling  Programme, 
received 15 October 2017), the NZ Archaeological Association Site Recording Scheme and the 
NZ Heritage Properties archaeological assessment dated the 13 August 2021, will be affected 
when undertaking the work. 
Released 
16.  At any time during the drilling and construction of associated drill pads, in the event of any 
‘accidental  discovery”  of  suspected  archaeological  material,  including  human  remains,  The 
Accidental Discovery Protocol must be followed and adhered to. 
 
Department of Conservation Te Papa Atawhai 
 
Central Otago District Office 
PO Box 176, Alexandra 9320 
www.doc.govt.nz        
 

17.  Prior  to  commencement  of  drilling,  and  construction  of  associated  drill  pads,  within  areas 
having  previously  undergone  an  archaeological  survey  by  NZ  Heritage  Properties  Limited 
(attached as Appendix B): 
•  Consultation  must  be  undertaken  with  a  suitably  qualified  and  experienced 
archaeologist and resulting recommendations and advice adhered to. 
•  Provide the resulting archaeological written advice to the Departments Central Otago 
District Office ([email address]). 
18.
Act 
 
Prior  to  commencement  of  drilling,  and  construction  of  associated  drill  pads,  within  areas 
identified as not having previously undergone an archaeological survey (attached as Appendix 
B), a suitably qualified and experienced archaeologist must: 
•  Undertake an on the ground survey of the proposed drill hole and drill pad sites to 
ensure no heritage features are affected. 
•  Suitably mark (i.e.: clearly visible tape or marker pegs) any heritage features found to 
be present in the vicinity of the works, to ensure no accidental damage occurs.  
•  Provide an updated archaeological assessment report to the Department’s Central 
Otago District Office ([email address]) within one month of completion of the 
archaeological ground survey. 
Information 
Reporting 
19.  A detailed annual report must be submitted to the Department’s Central Otago District Office 
([email address]) by 31 December of each year.  The annual report must include, but 
is not limited to, the following: 
•  Topographic location map of rehabilitated drill holes and drill pads. 
•  Topographic location map of active - yet to be rehabilitated - drill holes and drill pads. 
Official 
•  Photographic record (before construction/post rehabilitation) of rehabilitated drill 
holes and drill pads, cross referenced to the corresponding topographic location map. 
the 
•  Construction commencement dates of all active – yet to be rehabilitated - drill holes 
and drill pads, cross referenced to the corresponding topographic location map.  
•  Details of plant species planted at each revegetated site. 
 
 
under 
Released 
Department of Conservation Te Papa Atawhai 
 
Central Otago District Office 
PO Box 176, Alexandra 9320 
www.doc.govt.nz        
 


Act 
Information 
Official 
the 
under 
Released 


Appendix C – Drilling location area 2023 (sourced from application) 
under the Official Information Act 
Released 
Department of Conservation Te Papa Atawhai 
Central Otago District Office 
PO Box 176, Alexandra 9320 
www.doc.govt.nz       

Item 7
Form 28 
Covenant variation instrument to vary land covenant 
(Section 116(3) Land Transfer Act 2017) 
Land registration district 
Act 
BARCODE 
  Otago 
Covenantor 
Surname must be underlined
 Bendigo Station Limited 
Covenantee 
Surname must be underlined
 Minister of Conservation 
Information 
Variation of covenant 
The terms, covenants, or conditions contained in the covenant(s) set out in Schedule 
are hereby affected or modified as set out in Schedule B. 
Official 
the 
under 
Released 
KOW-156988-13-68-V1 


Act 
Information 
Official 
the 
under 
Released 


Act 
Information 
Official 
the 
under 
Released