Payment Claims - WR 643245
1982
Trade Summary
Quote - Schedule 6 
Builder P&G
$24,800.00
H&S and Contractor Induction 
$3,500.00
Site Fencing and Establishment
$5,800.00
Act 
Deconstuction 
$20,115.00
Capentry and Plastering
$108,756.00
Remove mowing strip
$3,650.00
Concrete works 
$18,965.00
Hardware
$6,250.00
Aluminium Joinery 
$23,760.00
Painting 
$63,245.21
Electrical and Data 
$35,761.00
Fire call speakers and pilots
$6,500.00
Locker joinery supervision and tid up
$1,200.00
Information 
Flooring 
$7,700.00
Cleaning & hand over
$5,000.00
Window curtains and blinds 
$5,500.00
Contractor margin 10%
$34,050.22
Subtotal 
$374,552.43
PS- Fire Protection - stage 1 only 
$18,714.55
PS- Drainage and soak Pit 
$51,372.73
Official 
Contractor margin 10%
$7,008.73
Total  trade
$451,648.44
Variations and adjustments 
WI001 - Isolation of Construction Zone
$
3,
  627.62
the 
WI002 - Portaloo Hire
$
3,
  881.82
WI003- Asbestoes Removal - WR 713231
$
50,
  799.38
WI004- Extended Bedroom End Walls to Roof 
$
5,
  066.00
WI005 - Remove and Replace Hallway Wall 
$
6,
  419.15
WI006 Bedroom ceiling structure 
$
7,
  797.84
WI007 - New Hallway Ceiling, Spouting & Downpipes
$
5,
  785.13
under 
Contractor margin 10%
$
8,
  337.69
Total Adjustments 
$91,714.63
Total Claim for work completed
$543,363.07