Operational Review 
w 91 
Tangoio & Tikokino 
Level 2 Vegetation fire 
F2919712 & F2938699 
Hawkes Bay 
ACT 1982
INFORMATION 
RELEASED UNDER THE OFFICIAL 

 
Contents 
 
Executive Summary ............................................................................................................................. 3 
Findings ................................................................................................................................................. 3 
Recommendations ............................................................................................................................... 5 
1982
Purpose of Review ............................................................................................................................... 7 
Environment Descriptions ................................................................................................................... 9 
The Event .............................................................................................................................................. 9 
ACT 
Tangoio ............................................................................................................................................... 9 
Tikokino ............................................................................................................................................. 14 
Review ................................................................................................................................................... 15 
Inter-agency and Stakeholder Relationships ................................................................................ 15 
Fire Cause and Determination ...................................................................................................... 16 
Fire Season Promotion .................................................................................................................. 16 
Operational Skills Maintenance (OSM) compliance ..................................................................... 16 
INFORMATION 
Pre-incident Planning and Intelligence ......................................................................................... 17 
Water Supplies .............................................................................................................................. 17 
Initial Mobilisation and Assistance Requests ................................................................................ 18 
Size-up, Strategy and Tactics ........................................................................................................ 19 
Firefighting Mediums .................................................................................................................... 20 
OFFICIAL 
Incident Management Team Structure (IMT) ............................................................................... 20 
Incident Ground Facilities and Cordons ........................................................................................ 21 
Incident Ground Communications ................................................................................................ 21 
THE 
Contractor Management .............................................................................................................. 22 
Safety, Health and Wellbeing ........................................................................................................ 22 
Task Force ..................................................................................................................................... 23 
Personal Protective Equipment (PPE) ........................................................................................... 24 
UNDER 
Incident Debrief ............................................................................................................................ 24 
Conclusion ........................................................................................................................................... 24 
Review Authorisation ......................................................................................................................... 26 
 
 
 
RELEASED 

 

 
Executive Summary 
At 11:43hours, January 6th, 2020, the Central Communications Centre (ComCen)received a 111 
call from a forest management member who  reported  a fire in the Tangoio forest, Hawkes  Bay. 
Subsequently, while still involved in the mop-up of this fire,  on February 3rd ComCen received a 
111 call  to a vegetation fire in Tikokino, Hawke Bay. This fire escalated to a 4th alarm incident. As 
1982
the resources for this fire were also involved in Tangoio, this report covers the operational review 
for both incidents. 
ACT 
Hawke’s Bay District had already been very busy with various incidents at the time of these fires, 
and personnel were becoming fatigued. The deployment of a task force to Hawkes Bay when the 
Tikokino fire broke out was timely and well-appreciated by local brigades. 
Due  to  the  Covid-19  lockdown,  the  Principle  Rural  Fire  Officer  (PRFO)  could  not  facilitate  the 
debriefs  for  these  incidents  until  late  July  2020.  The  second  Covid-19  lockdown  hampered  the 
review  further.  Although  there  was  a  significant  delay  in  completing  the  review,  there  are 
worthwhile  lessons  for  Fire  and  Emergency  New  Zealand  to  consider  in  long-duration  future 
incidents. 
INFORMATION 
Findings 
Tangoio 
•  The  working  relationship  between  the  forestry  companies  and  Fire  and  Emergency  was 
OFFICIAL 
strained during the incident. The forestry company expressed frustration that they wished to 
commence  operations  at  first  light,  whereas  Fire  and  Emergency  New  Zealand  teams  were 
not ready before 8:00 am. THE 
•  The Fire and Emergency New Zealand Command Units technology is unsuitable for some of 
the  tools  used  during  wildfire  incidents.  They  don't  have  any  wildfire  facilities  such  as  fire 
mapper or Microsoft TEAMS.  
UNDER 
•  The Command Units (ICP) initial location was sited to establish a suitable communications link; 
however, there was the need to evacuate hastily due to  the fire's potential for the site to be 
impacted by the fire. Furthermore, repeater locations weren't identified to enhance fireground 
communications. The forestry company could have assisted with this.  
•  Forestry workers requested the initial arriving appliances to protect some vulnerable machinery 
at risk of being caught in the  fire. This was done  but they neglected to think of the possible 
RELEASED 
escalation as they focussed on protecting the machinery. Subsequent arriving officers did and 
started implementing an IMT. 

 

 
•  On  the  third  day  of  the  fire,  poor  incident  ground  communication  and  the  lack  of  a  well-
structured  Incident  Action  Plan  (IAP)    and  Incident  management  Team  (IMT)  led  to  fire 
retardant  being  dropped  by  a  helicopter  onto  a  contractor  and  his  vehicle.  The review  team 
identified  that  there  was  a  general  lack  of  control  of  access  to  the  fireground.  This  allowed 
some  contractor  crews  to  freelance  rather  than  be  tasked  through  operations  therefore 
negatively impacting fireground accountability .  
1982
•  The review team found that many of the contractors' that were called in to assist the forestry 
workers  Personal  Protective  Equipment  (PPE)  was  non-compliant  to  Fire  and  Emergency 
ACT 
standards.  There  was  also  no  system  in  place  to  ascertain  whether  these  contractors  had 
sufficient knowledge, skills or qualifications to be on the fireground.  Again, the free access to 
the  incident  meant there  were  no  controls  on  who  was fighting  the  fire  and  what  equipment 
they  were  using.  Fire  and  Emergency  standards  require  equipment  to  be  tested  and 
maintained but this had not been ascertained. Initially, forestry management was concerned 
about their crews being deployed into a dangerous situation.  
•  The Fire and Emergency New Zealand and forestry company radios were incompatible and unable 
to talk to each other, so communication initially was difficult.   
INFORMATION 
 
•  There were difficulties with staffing the incident ground, IMT and RCC due to the fire occurring in 
the festive season. 
 
•  The  Incident  Management  Team  (IMT)  was  established  in  Hastings,  at  the  Civil  Defence 
Emergency  Operations  Centre  (EOC),  approximately  50  kilometres  or  one  hour's  drive  from  the 
OFFICIAL 
incident. This made visits to the fireground difficult and delayed the crews' firefighting activities due 
to the morning briefings held there before travelling to the fireground. 
 
THE 
•  Hawkes Bay Civil Defence initially handled the Public Information Management (PIM) function in 
the IMT. The community were desperate for accurate information. However, Fire and Emergency 
New Zealand didn't appoint their own PIM in a timely fashion to coordinate with the Hawkes Bay 
Civil Defence PIM to provide updated information from the incident.  
UNDER 
The above findings should be considered to develop lessons learned to improve future operations at 
similar incidents, and when the incident involves several agencies. 
 
Tikokino 
•  This fire was reported early, and resources were dispatched quickly. This included a helicopter 
RELEASED 
that  tracked  the  path  of  the  fire  as  it  jumped  the  road.  This  assisted  the  ability  of  crews  to 
minimise the potential spread of the fire and being able to control and contain the fire as quickly 
as possible. A task force was deployed from Wellington by the Region Manager. The task force 

 

 
was not deployed to the fire but was tasked to relieve local fire brigades who were desperate 
for a break. The task force initiative was well received by brigades and crews who were feeling 
the  effects  of  fatigue.  This  action  gave  well-earned  rest  and  recovering  for  both  paid  and 
volunteer crews who had been involved in a number of incidents over several weeks. 
•  The review team could not be provided with  a region process to trigger a task force response. 
Furthermore,  there  did  not  appear  to  be  a  system  to  notify  the  task  force  of  new  incidents 
1982
occurring,  so  these  were  directed  to  an  Assistant  Area  Managers  (AAM's)  pager  who  then 
managed a response.  
ACT 
•  As mentioned above, the PIM function handled by Hawkes Bay Civil Defence was not deployed 
promptly,  leaving  some  residents  and  landowners  frustrated  and  desperate  for  accurate 
information about the fire and the potential need to evacuate. 
•  Hawkes  Bay has  limited  air attack supervisors available to manage aerial resources safely, 
and the one utilised was not  on the preferred contractors register which is a perquisite with 
the rural fire standards at the time. 
These  findings  should  also  be  considered  when  developing  lessons  learned  as  mentioned 
INFORMATION 
previously.  The  early  response  of  resources  and  deployment  of  the  task  force  are  very  positive 
lessons for Fire and Emergency. 
Recommendations 
The review team is very aware that the implementation of Tranche 2, due in September 2021, will 
OFFICIAL 
address several findings identified within this document; therefore, the team has only made six key 
recommendations. 
THE 
1.  We  recommend    Fire  and  Emergency  New  Zealand  and  the  Hawkes  Bay  forestry  industry  
agreeing  how  they  will  facilitate  more  timely  intervention  at  future  forestry  fires.  This  would 
ensure  crews  from  the  forestry  industry  and  Fire  and  Emergency  are  ready  to  commence 
operations together., We recommend that Fire and Emergency work with the forestry industry 
UNDER 
to  identify any fireground communication issues that can be  addressed within future fire plans.  
2.  We recommend a Region 3 Task Force Policy and Plan be developed for future deployments. 
These must identify and include deployment triggers for all types of responses and task force 
make-up.  
3.  We recommend Fire and Emergency Command Units obtain appropriate wildfire technology 
and  applications  available,  such  as  Fire  mapper  and  MS  TEAMS  forms  that  will  enable 
RELEASED 
information  sharing.  Command  Unit  operators  will  also  need  training  in  how  to  utilise  the 
additional technology.  

 

 
4.  We recommend Fire and Emergency ensure a PIM is allocated to any significant events where 
Fire and Emergency are the lead agency and  appoint at the earliest possible time to support 
the Incident Controller (IC).  
5.  We recommend  Fire  and  Emergency  ensure they  monitor  predicted  weather conditions  and 
prepare in advance of “fire seasons”, especially in the historically high-risk areas of the country. 
1982
ACT 
INFORMATION 
OFFICIAL 
THE 
UNDER 
RELEASED 

 

 
Operational Efficiency and Readiness 
The purpose of Operational Efficiency and Readiness (OER) is to  provide operational assurance 
advice  to  the  Chief  Executive  and  Executive  Leadership  Team  to  ensure  they  achieve  their 
responsibilities  for  the  operational  efficiency  and  operational  readiness  of  Fire  and  Emergency 
New Zealand. 
1982
OER  is  independent,  objective  and  provides  quality  operational  assurance  advice  to  support 
continuous improvement regarding the operational efficiency and readiness of Fire and Emergency 
New  Zealand.  OER  is  required  to  report  quarterly  to  the  Fire  and  Emergency  Audit  and  Risk 
ACT 
Committee and is a function of the Office of the Chief Executive. 
Purpose of Review 
An  Operational  Review  examines  how  Fire  and  Emergency  New  Zealand  responded  to  large, 
significant  orunusual  incidents  to  provide  continuous  improvement.  While  it  considers  the 
application of policies, procedures and operational instructions (as they applied to the incident), its 
primary  focus  is  to  assist  Officers  and  firefighters  in  learning  by  sharing  knowledge  and 
INFORMATION 
experiences gained through reflecting on incidents.  
A review focuses on the facts and does not provide conjecture or alternative opinions. The review 
identifies  key  findings to  inform  Senior  Managers to  develop  corrective  actions. It  also  identifies 
general  findings  related  to  equipment,  tactics,  and  actions  that  worked  well  to  support 
organisational learning.  
OFFICIAL 
In this instance, the review also considers aspects of this incident that should have included a level 
2  accident  investigation.  This  is  related  to  the  near  miss  recorded  in  the  Fire  and  Emergency 
THE 
Safe@Work system regarding the dropping of retardant on a forestry worker and his vehicle.  
Once  completed  and  approved  by  the  sponsor,  all  reports  are  published  on  the  Operational 
Efficiency webpage for all to read, learn and share. 
UNDER 
Methodology 
The review team use the Incident Cause Analysis Method (ICAM) as a guide to conduct operational 
reviews. This is the same methodology used by Level 2 accident investigators. 
The review team interviewed a number  of personnel who played key roles during the incident and 
had two members of the OER team attend the debriefs and take notes. They also used the ICAD 
RELEASED 
reports, initial 111 call logs, media reports and notes and observations from attending personnel.  

 

 
The content contained within this report is a true and accurate reflection of the information provided 
to the team through debriefs, interviews and data collected by Fire and Emergency New Zealand 
reporting systems. 
Note, a Fire and Emergency New Zealand login will be required to access the Fire and Emergency links within 
this document.
 
Review requested by 
1982
Fire and Emergency Operational Efficiency and Readiness 
ACT 
Review Team 
Review Lead: 
ANC Trevor Brown, National Manager OER 
Review Team: 
AC Darryl Papesch, Manager OER 
Review Team: 
SSO Doug Bennett, SSO Whanganui 
Review Team: 
Darrin Woods, Specialist Fire Investigator, NHQ 
INFORMATION 
Links 
ICAD Report 
F2919712 (Tangoio)          F2938699 (Tikokino) 
Media Articles 
Stuff (Tangoio)                  Stuff (Tikokino) 
OFFICIAL 
THE 
UNDER 
RELEASED 

 

 
Environment Descriptions  
Tangoio 
Tangoio is a coastal farming locality and popular beach location 23 kilometres north of Napier and 
seven kilometres north of Whirinaki in the Hawkes Bay region. It has extensive forestry in the hills 
1982
above the coast managed by three forestry companies. There is also farming, and a small coastal 
community, Waipatiki, nearby. 
ACT 
Hawkes Bay regularly becomes very dry during the summer, so the fire risk typically also becomes 
very high. At the time this fire started, a restricted fire season was in place. Over several da ys of 
hot  dry  weather  Hawkes  Bay  had  experienced  several  fires.  The  PRFO  released  fire  danger 
warnings on the 4th and 5th of January. Based on the warnings, the forestry company at Tongoio 
had decided that on the day in question, they were going to stop operations at mid-day due to the 
predicted high temperatures. 
When the fire at Tongoio started, there was a 30km/hr wind gusting to 60km/hr. The temperature 
was 22°C and increased to 34°C later in the day. Relative humidity was low, and fire fuels were 
extremely dry. The fire fuels comprised un-grazed dry grass, harvesting slash, young pine trees 
INFORMATION 
and mature forest. 
Tikokino 
Tikokino  is  a  small  town  in  Central  Hawkes  Bay  District  located  55  kilomtetres  southwest  of 
Hastings and located on state highway 50. It was established in 1860 and began as the sawmilling 
OFFICIAL 
centre for local forests then becoming a service town for the farms that took their place. 
Today it is predominantly easy farming terrain and horticulture but is surrounded by forests in the 
hills. Though a small town it also has eight buildings registered by Heritage New Zealand. 
THE 
When the fire started conditions were the same as described above for Tikokino and it experiences 
the same hot dry weather in summer. 
 
UNDER 
The Event 
Tangoio 
Weather  conditions  in  Hawkes  Bay  were  extremely  dry  over  the  Christmas/New  Year  period, 
leading  to  2020  and  creating  an  extreme  fire  danger.  On  January  4th,  the  Principal  Rural  Fire 
Officer (PRFO) published a public weather warning urging people not to light fires in the open. He 
RELEASED 
repeated the warning on the 5th and 6th of January. January 6th was the first day back at work for 
many  after  the  Xmas/New  Year  holiday  break.  Although  it  was  the  first  day  back,  the  forest 
manager  intended  to  cease  operations  midday  due  to  the  hot  temperatures  and  extreme  fire 

 

 
danger.  Several  emergency  incidents  in  Hawkes  Bay  and  the  lower  North  Island  in  December, 
leading into January, kept the ComCen very busy over the holiday period.  
At 11:43 on January 6th, 2020, the Central ComCen received a 111 call from a member of a forest 
management team. They reported a fire in the Tangoio forest, Hawkes Bay, and while speaking to 
the operator, they mentioned it had grown quickly, doubling in size while on the phone. Tangoio is 
approximately 27 km north of Napier, but at the time of the call, both appliances from Napier fire 
1982
station  were  involved  in  another  incident.  ComCen  dispatched  appliances  from  Hastings 
(HAST561),  Bayview  (BAYV541),  and  a  water  tanker  also  from  Bayview.  At  11:48,  the  Senior 
ACT 
Station Officer (SSO) from Hastings attached an additional tanker to the response due to the dry 
weather conditions. A message was passed from ComCen indicating the caller would really like a 
helicopter due to the 'fine fuel measure' being very high at Christmas. At about the time of the third 
alarm being transmitted, the PRFO, who had been alerted to the fire, responded two helicopters 
with an Air Attack Supervisor (AAS) and two Deputy Principle Rural Fire Officers (DPRFOs). The 
availability of aircraft was limited due to the  high winds preventing some helicopters  from taking 
off. At 11:48, the first DPRFO (RFOHAWKES2) contacted responded. 
On arrival at about midday, BAYV541 could see vast amounts of smoke and requested helicopters 
INFORMATION 
to be placed on standby, and at 12:06, it transmitted a 3rd alarm. HAST561 arrived at 12:08, was 
briefed and assumed command on request of the OIC. 
The forestry crew leader identified himself and requested the Officer of HAST561, located close to 
where the fire started, to protect a large machine (Feller  Buncher) critical to their ongoing work. 
The Officer set up on the skid site and began a fire attack using a tanker for water supply. The fire 
OFFICIAL 
was in cutover pine that was well cured and a strong wind was driving the fire toward standing pine. 
At  12:14,  a  SitRep  from  BAYV541  indicated  the  total  area  of  the  fire  was  now  more  than  4  ha, 
mainly  in  cutover  material  extending  into  standing  forest.  They  were  using  an  high  pressure 
THE 
delivery  (HPD)  to  protect  forestry  assets.  At  12:18,  crews  were  informed  that  the  helicopter's 
estimated time of arrival (ETA) was about one hour. A safe arrival point (SAP) was communicated 
at 12:20 hours. 
At 12:20, the National Rural Support Team was paged. 
UNDER 
When the first DPRFO arrived at 12:26 he waited at the gate for a contractor whom he knew was 
responding  to  this  incident  and  had  an  intimate  knowledge  of  the  forest.  Two  appliances  were 
visible, and he could see the fire becoming very intense. He couldn't tell where the head of the fire 
was; however, he identified "spotting" 100m in front of what could be seen. He had a conversation 
with the Officer of HAST561, noting that urban crews were working along the base and flanks  of 
the fire  and made an initial plan to try hold the fire at the road. He then drove around the fire to 
RELEASED 
Settlement Road to gauge the situation's full extent. 
10 
 

 
Napier 512 (NAPI512) arrived at 12:32 and waited at the SAP.  After being briefed, the NAPI512 
crew was tasked to perform a cut-off at the road with assistance from a  forestry tanker and crew. 
The  OIC  used  the  tablet  from  NAPI512  to  view  the fire  index  software.  There  were  discussions 
about the conditions and speed of fire  development and it was decided to focus urban resources 
on structures and  property. A DPRFO began to organise the response of heavy machinery and, 
on the arrival of the helicopters, intended to conduct an aerial survey of the fire. 
1982
Hastings  562  (HAST562)  arrived  at  12:42.  The  SSO  did  not  consider  there  was  a  suitable 
command structure in place and could not see the fire behaviour due to heavy smoke. Following 
ACT 
a  discussion  with  the  officer  from  HAST561,  he  met  with  the  DPRFO  and  was  appointed 
Operations Commander (Ops). He was unable to gain any situational awareness of the terrain and 
scale of the fire from his position, due to the large amount of smoke encompassing the area. He 
didn't  have  a  suitable  vehicle to  survey the  extent  of the  fire,  and  he  was  also  unaware  of  what 
appliances were responding because Rural Fire used a different process to resource their incidents. 
He  therefore  sectorised  the  base  of  the  fire  area  using  the  built  environment  geographical 
sectorisation with a station officer (SO) in charge of each sector.  
Therefore,  at  this  early  stage  of  the  incident,  the  HAST562  Officer  was  Ops,  the  first  arriving 
INFORMATION 
DPRFO and the AAS took control of the aircraft sector and the Officer of HAST561 was in charge 
of Sector Alpha (fire ignition location). Sector Alpha was also established as the Forward Control 
Point (FCP) when the Incident Command Unit (ICU) arrived.  
Communications were difficult in the undulating terrain; handheld radios didn't work well and there 
was  no  cell  phone  coverage.  However,  the  Land  Mobile  Radio  (LMR)  did  allow  for  some 
OFFICIAL 
communication.  Ops  eventually  went  for  a  drive  with  the  first  arriving  DPRFO  to  gain  first-hand 
knowledge of the fire.  
THE 
The on-call Senior Officer (HAWKSBAY2) was notified on the second alarm and responded when 
the third alarm was transmitted. On arrival, he saw appliances at the SAP, the start of a long track 
leading up to the fire. No SitRep had been transmitted, so he went forward to Napier 514 (NAPI514) 
crew for more information. To help with  communication difficulties, rural personnel requested that 
the ICU be positioned to the base of the fire. He recognised this would be a long-duration incident, 
UNDER 
so he arranged for the Salvation Army catering facility. The DPRFO, the contractor and the AAS 
briefed the Senior Officer. It was the Senior Officer's understood that the DPRFO would become 
Ops due to his technical knowledge  of wildfires and the senior officer  would assume the role as 
Incident Controller.  
To prevent congestion, Operational Support cordoned the narrow forestry roads.  
RELEASED 
The FCP was established on an upwind skid site at the base area. A rapid withdrawal was required 
as  a  wind  change  and  a  lack  of  resource  to  contain  the  subsequent  fire  spread  resulted  in 
11 
 

 
appliances and the ICU being compromised. Some Fire and Emergency New Zealand firefighting 
equipment was left on the ground where it was being used as there was no time to retrieve it. 
Although on leave, the Area Manager who lived nearby drove to the incident as he could see this 
was  a  significant  fire  and  seemed  to  be  advancing  toward  the  nearby  beach  community.  He 
contacted  the  PRFO  to  give  him  some  situaltional  awareness  of  the  fire  from  a  another  forest 
entrance.  He  suggested  the ICU relocate from  its  present  position  near the  pump  appliances to 
1982
this new location. He felt the new location would provide better radio communications and line of 
sight to the fire. After withdrawing from the site at the base of the fire, the FCP was established  in 
ACT 
the  location  suggested  by  the  Area  Manager.  But  despite  efforts    incident  ground  radio 
communications (IGC)  were an issue throughout the fire, even following attempts *to locate radio 
repeaters on high ground. 
The first aircraft arrived around 12:15 and by 13:00 there were five helicopters and two fixed -wing 
aircraft on site, with the extent of burn area estimated at 10 hectares.  
An initial Incident Management Team (IMT) was in place by 13:45, and a request was passed to 
activate the National Incident Management Team (NIMT). The IMT was initially set up at Hastings 
Fire  Station  as the  PRFO’s  office  was  located  there,  but  soon  relocated to  the  Hastings  District 
INFORMATION 
Council Emergency Management Centre (CDEM) to provide more space and better facilities. The 
PRFO then assumed the role of Incident Controller (IC). As it transpired the IC's team were the 
national  NIMT  duty  team,  and  members  were  contacted  and  asked  to  respond  to  the  Hastings 
CDEM facility. A full IMT was established by 21:30 and it worked until 23:00 to prepare the IAP for 
the next day. This facility served the IMT well throughout the incident, but its distance from the fire 
OFFICIAL 
(approximately 50km away) delayed teams getting to the incident after their briefings. It was also 
a long drive for roles within the IMT who may have needed to attend the actual fireground. 
THE 
High winds and an already extreme fire danger in Hawkes Bay ensured the fire was moving swiftly 
into the standing pine forest. Beyond the pine forest was open farmland where the IC believe the 
fire could be more easily contained. So, initial tactics were to protect the fire's flanks then contain 
and extinguish it once it burnt through the forest. The young pines and long grass  within the fire 
ground created very dense smoke conditions that hampered the effectiveness of the heli-buckets 
UNDER 
to drop water effectively as they had difficulty getting line of sight of where to drop their water. 
A forestry manager told the DPRFO of a house downwind that could  be threatened by fire. After 
evacuating the initial base area, the OIC HAST512 was tasked to protect the house on Settlement 
Rd and ensure the occupants were evacuated. Using HAST562 (CAF appliance) and a tanker as 
firefighting resource if required they monitored the advancement of the fire with a thermal imaging 
camera (TIC) from Settlement Rd. Helicopter pilots believed the fire was tracking away from the 
RELEASED 
house but as a precaution it was pre-treated with class A foam.  
12 
 


 
A plan was developed for forestry personnel to cut down some trees to facilitate a firebreak and 
the house was pre-treated with foam. The fire got within 80m of the dwelling. A retardant line was 
established between the house and the fire on day three. While laying this retardant line, forestry 
contractors working in the area were drenched with the product resulting from a lack of incident 
ground communications.  
As more resources arrived, efforts were made to create more water sources to support firefighting 
1982
operations,  achieved  by  using  water  tankers.  The  third  alarm  and  subsequent  mobilisation  of 
additional rural resources meant that Fire and Emergency  had five urban appliances, ten tankers, 
ACT 
five smoke-chaser units, ten rural appliances, Operational Support, and a Command Unit on scene 
to fight the fire. There were also seven excavators, two bulldozers, ten contract tankers, several 
forestry crews, seven helicopters and two fixed-wing aircraft. 
INFORMATION 
OFFICIAL 
THE 
UNDER 
 
Figure 1, Tangoio Fire Map 
There was only one source for heli-bucket dipping through a forestry dam, and some pilots resorted 
to dipping in the sea that was close  by.  However, the lead  pilot identified that there would  have 
been  even  bigger  challenges  controlling  the  fire  without  the  dam.  Portable  dams  and  a  mobile 
RELEASED 
dipping truck were also used later on to  establish more water supplies.  Aircraft operations were 
completed  before  dusk,  and  Fire  and  Emergency  New  Zealand  crews  were  stood  down  for  the 
13 
 

 
evening. A small forestry team remained on standby overnight. The forestry crews who remained 
vigilant on this dwelling throughout the night to ensure it wasn’t threatened by the fire. 
The fire was contained along Settlement Road with crews positioned on the ridge able to contain 
and douse any fire which crossed the road before any significant fire spread. 
Dampening  down  and  containing  flare-ups  continued  for  12  days,  with  the  incident  closed  on 
1982
January 18th at 14:57.  
Tikokino 
ACT 
 On February 3rd at 16:55, the Tikokino fire was reported  burning  alongside  SH50. Crews were 
already involved in containing another fire close by at Wakarara. The DPRFO immediately diverted 
a helicopter fighting that fire and it arrived at Tikokino within 16 minutes.  
Hastings 562 (HAST562) and Hastings 563 (HAST563) responded at 17:02 and were advised by 
the  ComCen  that  this  was  a  grass  fire  spreading  into  forestry.  The  fuel  consisted  of  second-
generation  pine  trees,  broom,  and  tree  stumps  from  previous  cuts.  Heretaunga  (HERE5071) 
responded at 17:19. 
INFORMATION 
A request to the ComCen from HAST563 for a second tanker was made, and a short time later 
another two helicopters were dispatched due to the fire now being in pine trees ,  having jumped 
SH50. 
Shortly  after  this  the  DPRFO  detached  themselves  from  the  Wakaraka  fire  and  responded  to 
OFFICIAL 
Tikokino. 
When the  Hastings  appliances  arrived  they  reported  a  5  Ha  fire  in  a  pine  plantation,  which  had 
THE 
spotted across SH50 and was burning into grassland. A 3rd alarm was then transmitted. Conditions 
were very dry and windy. The SSO discussed with  the aircraft pilot  concerns about the threat the 
fire was posing to property so this was a feature of the initial strategy. 
The Police were requested to close SH50. The ICU was diverted from another incident and arrived 
UNDER 
to establish the ICP and a SFP communicated a short time later.  
A SitRep indicated that four helicopters were in use using heli-buckets and the fire appliances were 
using hose deliveries and there were about 10 ha of forestry plantation on fire. At about this time, 
incident control was passed to a DPRFO. 
The Salvation Army was requested to attend to provide food for 50 personnel.  
RELEASED 
Once the fire burned through the forestry plantation and reached pasture it was quickly contained 
with structure protection put in place, and crews focused on dampening down. On the morning of 
February 4th, the PRFO took over the role of IC  with three helicopters using heli-buckets and 20 
14 
 

 
ground  crew  using  fire  deliveries  and  hand  tools.  Late  in  the  evening  a  significant  flare-up  was 
reported  and  shortly  after  this  the  fire  crossed  SH50  so  structure  protection  was  put  in  place  to 
protect at risk properties. 
In the early hours the following morning e crossed SH50 again, but was quickly  contained again, 
with structure protection remaining in place. 
1982
The IC, supported by the Senior Officer, requested a Task force from the Region HQ to support  
crews  who  had  been  working  long  hours  throughout  January  and  were  exhausted.  A task  force 
comprising  urban  and  rural  crews  and  with  urban  and  rural  fire  management  expertise  was 
ACT 
deployed. Their role was to relieve exhausted firefighters and officers, and as and when requested 
give crews a chance to fully stand down and re-charge their batteries. As mentioned, this was well 
received  and  the  task  force  members  were  also  appreciative  of  how  welcomed  they  were  an d 
looked after. 
Dampening down would continue for eight more days, and the incident was closed on the morning 
of February 12th.  
Review 
INFORMATION 
This  section  outlines  the  findings  from  the  operational  review  investigation  based  on  the 
investigation's  terms  of  reference  and  expectations  have  been  structured  to  reflect  the  ToR. 
Generally,  the  findings  are  grouped  chronologically  under  the  "4Rs"  headings  Reduction, 
Readiness, Response and Recovery.  OFFICIAL 
The Operational Review team will measure compliance against Fire and Emergency Operational 
Instructions and Policy. 
THE 
 
Inter-agency and Stakeholder Relationships 
Our expectations 
UNDER 
That Fire and Emergency engaged with key stakeholders (building owners, landowners, territorial 
authorities, forestry companies, and contractors) and key partners and stakeholders that support 
or are engaged with Fire and Emergency New Zealand to discuss and support reduction activities. 
This includes public education notifications to ensure the public is informed and aware of the  fire 
risk in their communities. 
RELEASED 
Our findings 
Local  management  had  a  good  relationship  with  the  forestry  companies  and  had  been  very 
proactive in promulgating fire warnings.  
15 
 
 

 
Several public notices had been published to warn the public about the danger of fire  on the days 
leading to the ignitions of both fires. The PRFO and his team had an extensive work history with 
the  previous  rural  fire  authority  and  were  very  well  connected  with  key  agencies  in  and  around 
Napier and Hastings District Council boundaries. 
Fire Cause and Determination 
Our expectations 
1982
That  a  qualified  investigator  was  assigned  to  investigate  the  cause  of the fire.  Furt hermore, the 
investigator completed the report within the expected timeframes.  
ACT 
Our findings 
A Senior Specialist Investigator and a local Specialist Investigator  examined the cause and origin 
of the fire and concluded it was accidental. The point of origin was at the forestry skid site where 
the first crews responded. The fire report wasn't completed or available for sighting at the time of 
this review. 
Fire Season Promotion 
INFORMATION 
Our expectations 
Public  signs  were  maintained  and  kept current  during  the  fire  season,  informing  the  community  and 
members of the public passing through to be aware of the fire danger. Also, the Fire and Emergency 
New Zealand website "Check It's Alright" provided current information about the fire season conditions 
and permitting information.  
OFFICIAL 
 
THE 
Our findings 
On the days the fires started, various indices indicated it would be an extremely dangerous period 
for fire. The  PRFO had widely  published  the fire season  danger status through  print, social and 
radio media outlets. The Fire and Emergency New Zealand website "Check it's Alright" was also 
UNDER 
regularly updated and current. 
Operational Skills Maintenance (OSM) compliance 
Our expectations 
All personnel complied with the requirements of the Operational Skills Maintenance (OSM) procedures, 
or an equivalent system (e.g. spreadsheet, D4H etc.) and also had the appropriate qualifications for the 
RELEASED 
role they performed.  
Our findings 
16 
 

 
The team found that the district's "urban" brigades were all OSM-compliant in their critical skills. The 
district's "rural" brigades use a different system to track the individual's training called D4H. The D4H 
database showed all the rural firefighters had received the appropriate training at some time however, 
the database does not capture evidence of maintenance training, nor does it record the currency of the 
skills that have been attained.  
Pre-incident Planning and Intelligence 
1982
Our expectations 
Personnel had applied the  operational planning process to identify sites where significant fire or 
ACT 
other risks  may  indicate  the  need  for  a  site report  or  tactical  plan.  Furthermore,  if  in  the  natural 
environment, the Fire Plan is current.  
We expected to see that Operational Planning contributed to the successful outcome of the fires 
through: 
•  a fire management plan that had been reviewed and updated prior to the fire season and any 
pre-planning undertaken regarding the fire season had been included, 
•  the fire plan had been widely promulgated and communicated to forestry and landowners, 
INFORMATION 
•  provision for multi-agency interoperability had been discussed and agreed with other 
agencies, including local territorial authority, civil defence and forest owners, 
•  both training and exercises had been conducted leading up to the fire season, 
•  resources and equipment had been regularly checked and maintained in preparation for the 
fire season. 
OFFICIAL 
Our findings 
THE 
The  PRFO  had  developed  a  comprehensive  Interim  rural  fire  plan  for  Hawkes  Bay  when  Fire  and 
Emergency was first formed in 2017, but it was focused on the changes and the impacts of the then-
new legislation (Fire and Emergency New Zealand Act 2017). The plan was distributed internally within 
the Hawkes Bay, but not widely to external agencies such as local Civil Defence. 
UNDER 
The review team found no evidence of training or exercises taking place leading up to the fire season, 
however,  Regions  do  run  an  IMT  SIMEX  annually.  Resources  and  equipment  were  being  regularly 
checked and well maintained to ensure they were operationally ready. 
Water Supplies 
Our expectations 
RELEASED 
That crews had knowledge of, or access to electronic data or water maps documenting the location of 
water supplies either reticulated or static for the use of firefighting or decontamination as prescribed in 
the Schedule of Operational Readiness Standards. 
17 
 

 
Note,  OER  does  consider  the  National  Notice  034/2015,  "Suspension  of  non-emergency  work  on 
roadways", which has halted hydrant testing. 
Our findings 
The area involved on fire was close to the coast as well as the forest having a large dam where tankers 
could refill from. Knowing this area had a limited water supply, tankers responded on the initial alarm 
1982
with eventually a total of 20 being involved from both Fire and Emergency New Zealand and Contracting 
companies. There were numerous dams throughout the forest; however, only one was within the area 
close to operations and suitable for dipping a helicopter bucket. This dam was used, but with seven 
ACT 
helicopters involved they opted to dip from the ocean to reduce wait times and congestion. The fixed-
wing aircraft operated out of the Napier airport. 
Initial Mobilisation and Assistance Requests 
Our expectations 
The Fire and Emergency ComCen and responding appliances meet the performance expectations 
stated in the Service Delivery Guidelines. Furthermore, all requests were processed promptly , as 
procedures state. 
INFORMATION 
Our findings 
Comcen processed the calls and responded to appliances promptly as and when requested, with all 
notifications  actioned  appropriately.  As  with  most  large  vegetation  fires  the  fire  plan  was  enacted, 
resulting in deployment and resource movements being organised by the IMT. Although Comcen  did 
respond  some  resources,  this  was  mainly  at  the  request  of  IMT  logistics  .Response  driving  and 
OFFICIAL 
appliance positioning 
Our expectations 
THE 
Officers  and  drivers  adhered  to  the  principles  of  driving  policy  when  responding  to  the  incident. 
Furthermore, when positioning the appliance, firefighter safety is taken into consideration by ensuring 
they are parked away from exposure to fire, including consideration of fire development and possible 
UNDER 
direction  of  fire  growth,  building  collapse,  power  lines,  trees  or  other  possible  hazards.  Also,  as  the 
incident progressed, vehicle positioning was re-evaluated.   
Our findings 
There were no recorded issues relating to driving to and from the incidents. The response times for the 
initial appliances met performance expectations.  
RELEASED 
For  Tangoio  the  command  unit  was  initially  located  close  to  the  original  skid  site  where  the  fire 
originated,  however,  this  wasn't  ideal  as  communication  links  were  not  good.  Furthermore,  it  was 
established  before  full  situational  awareness  had  been  attained,  with  the  Officer  not  having  time  to 
18 
 

 
identify a more suitable location. A Senior Officer who arrived later via a different route suggested it be 
in a better position than he'd passed while responding. This new location had better radio and cellphone 
coverage plus the benefit of a more visual outlook of the incident unfolding in front of them.  
There were no issues identified for the command unit location at Tikokino. 
 
1982
Size-up, Strategy and Tactics 
ACT 
Our expectations 
The first arriving Officer undertook an initial size-up and risk assessment of the incident site in line 
with  the  principles  outlined  in  the  Command-and-Control  Policy.  The  size-up  would  result  in 
comprehensive  situational  awareness,  including  hazard  identification  and  the  potential  for 
escalation.  Furthermore,  the  information  contributed  to  the  formation  of  an  action  plan,  sound 
strategy and supporting tactics.  
Our findings 
Tangoio 
INFORMATION 
The first arriving crews focused on the fire near the skid site as the operator was concerned about 
the  loss  of  machinery  and  equipment.  This  led  to  a  lack  of  situational  awareness  of the  greater 
scene where the fire was rapidly escalating. As more resources and  senior managers arrived, a 
more suitable structure was implemented, and a simple plan was devised focusing on containment 
and extinguishment. Cut-off lines, such as roadways, were identified. 
OFFICIAL 
Once the IMT was established, the overall strategy didn't change. However, the tactics to support 
it  did.  This  included  air  operations,  laying  retardant  lines,  and  introducing  more  ground  crews, 
including contractors. Forestry companies also provided resources.  
THE 
Although  the  plan  was  sound,  its  implementation  was slow to  be  implemented,  causing  forestry 
company frustration. This was due to the IMT established at the Civil Defence EOC in Hastings. 
This is approximately 50km away resulting in delays and time wasted in getting firefighting activities 
underway.  Briefings  and  taskings  were  being  done  at  the  EOC  location  before  departing  to  the 
UNDER 
fireground. It is understood that firefighting activities need to start at first light when temperatures 
are cooler and winds are generally of less strength therefore, fire spread is at a minimum.   
These delays resulted in forestry workers and contractors making their own way to the scene early 
and  commencing  firefighting  activities  they  thought  needed  to  occur  long  before  Fire  and 
Emergency crews arrived and commenced operations.   
The  forestry  company  stated  that  in  their  opinion  this  daily  in  Fire  and  Emergency  deployment  
RELEASED 
caused more loss of plantation assets than they thought was necessary  
Tikokino 
 
19 
 

 
Like Tangoio, the location of the incident was approximately 50 km away; however, it was in the 
opposite direction. The very early re-deployment of a helicopter from one incident to Tikokino was 
an  excellent tactic  and  provided  a  very  early  fire  attack capability.  SH50  was  deemed  to  be  the 
cut-off  boundary  for  the  fire;  however,  the  fire  did  cross  it  a  couple  of  times  due  to  a  lack  of 
resources  onsite.  Fortunately,  there  was  a  change  in  the  direction  of  the  wind,  which  caused  a 
backburn, greatly assisting with extinguishment.  
1982
Firefighting Mediums 
Our expectations 
ACT 
That a high level of operational competence was demonstrated in the selection of firefighting medium 
to  achieve  the  initial  strategy  and  tactics  deployed;  also,  those  choices  are  based  on  a  worst-case 
scenario  or  the  recognition  of  fire  behaviours.  Once  a  comprehensive  size  up  and  assessment  of 
potential hazards had been completed, further assessment was made of firefighting mediums (water, 
foam etc) and methods of application (handlines, monitors, aircraft etc). 
Our findings 
A  high  level  of  operational  competence  was  demonstrated  across  the  firefighting  operations  and 
INFORMATION 
Incident Control functions for both incidents. The Tangoio fire comprised of volatile fuels and access 
difficulties  because of the terrain and rapid-fire spread, therefore the initial tactics were handlines  to 
protect machinery assets while further assessments were completed. This was difficult as heavy smoke 
blanketed the forest and made size up very difficult and protracted.   
Aircraft were requested early in the event, which allowed for early intervention in the rapid-fire spread. 
OFFICIAL 
As time passed the use of heavy machinery was introduced to produce fire breaks, particularly as a 
defence  tactic  for  structures  that  were  in  the  line  of  fire  spread.  As  well  as  bulldozer  lines,  property 
protection  was  achieved  by  means  of ground  crews  with  pumping  appliances,  tankers  and  BA,  plus 
THE 
assistance from air attack dropping water and laying a retardant line between the fire and the property. 
The Tikokino fire was easier to manage as the terrain was flat and there was good access due to its 
location next to SH50. The weather conditions were similar to Tangoio and fire behaviour was intense 
because of this, but the early intervention of aircraft supported crews ability to contain the fire. 
UNDER 
Incident Management Team Structure (IMT) 
Our expectations 
We expected to find that as the incident escalated, an incident management team is established 
for an incident of this magnitude. It is also expected that the structure implemented would provide 
clear lines of communication and would be a major contributor to the event's successful conclusion .  
RELEASED 
Our findings 
20 
 

 
There was a lot of confusion  from early arriving crews about who  was in Control of the Tangoio 
incident.  The  review  team  found  much  conflicting  information  about  the  roles  people  performed 
and,  at  one  stage,  identified  two  people  who  thought  they  were  Operations  Commanders. 
Furthermore, when crews arrived, they couldn't locate the IC as he was either in  a helicopter or 
roaming  the  site  in  his  vehicle.  This  led  to  some  freelancing,  where  crews  performed  what they 
thought needed to be done until some direction was provided. 
1982
Once  the  size  and  scale  of  the  incident  was  realised,  the  PRFO  formed  an  IMT  located  at  the 
Hastings Emergency Management Centre where they have operated for the duration of the fire. 
ACT 
Many in attendance felt this was located too far from the incidents (approximately  50 km to both 
Tangoio & and Tikokino) and that they didn't have good situational awareness. Feedback  to the 
review team suggested the IMT needed to be located closer to the events to reduce the timeframe 
between  briefings  and  finally  getting  to the  ground.  The  earlier  operations  can  commence  soon 
after daylight the more can be gained before temperatures rise, fire conditions change and making 
the most of all available daylight.  
When the IMT stood up, the Command Unit then r the Forward Control Point at Tangoio. 
As the IMT was still operating at Tangoio they were also able to provide  support for the Tikokino 
INFORMATION 
fire. This also had the command unit set up as the FCP. 
Incident Ground Facilities and Cordons 
Our expectations 
OFFICIAL 
That  appropriate  incident  ground  facilities,  including  cordons,  were  in  place  to  suit  the  size  and 
complexity  of  the  event  as  prescribed  in  the  Command-and-Control  Technical  Manual  and/or  the 
Coordinated Incident Management System (CIMS) manual. 
THE 
Our findings 
The initial location of the command unit has already been discussed.  Roads surrounding the fire were 
set as the outer cordons, with all fire operations occurring within these boundaries.  
UNDER 
Due to SH50 being a main highway it was necessary to  request Police to close the road around the 
vicinity of the fire. This provided safe zones for all operations. 
Incident Ground Communications 
Our expectations 
That  the  IC  or  his/her  delegate  implemented  an  effective  communications  plan  as  prescribed  in  the 
RELEASED 
Command-and-Control  Technical  Manual  and  or  Coordinated  Incident  Management  System  (CIMS) 
manual. The plan reflects the reporting lines of the IMT and contributed to the incident's overall safety 
and effective management. 
21 
 

 
Our findings  
During the initial phases of the response and initial firefighting operations, communication was via both 
VHF and UHF IGC radios, i.e., urban areas used UHF radios for initial taskings and rural  used VHF. 
Once a communication structure was implemented, VHF became the predominant channel. Due to the 
mountainous  terrain  and  tall  tree  standings,  communication  between  the  operational  zone  and  the 
original  location  of  the  ICP  was  not consistent.  This  improved  when  the  ICP  was  moved  to  a  better 
1982
position, and all communications, including cellphone coverage, was enhanced considerably. 
Communications  between  the  FCP  and  ICP  in  Hastings  were  mainly  done  via  cellphones  and  other 
ACT 
technologies within the Command Unit.  
A lack of compatibility with forestry radios made communications between Fire and Emergency New 
Zealand and the Forestry contractors challenging, particularly at the onset of the incident. 
The  review  team  didn't  identify  a  form  communication  plan.  The  standard  channels  were  used  for 
tasking and sector management, with the VHF "air ops" channel used to communicate with aircraft. 
There were no issues identified to the review team for Tikokino. 
Contractor Management 
INFORMATION 
Our expectations 
The  action  plan  identified  all  contractors  who  attended  the  incident,  the  contractors  arrived  with  or 
received the appropriate PPE and a safety briefing. Furthermore, they are trained and qualified for the 
tasks expected of them.  
OFFICIAL 
Our findings 
The main contractors used at the Tangoio incident were helicopter operators using heli-buckets, fixed-
THE 
wing  aircraft,  excavator  and  bulldozer  operators  familiar  with  the  forest.  There  were  accountability 
issues on the fireground where, often, it was unknown which contractors were on site, where they were 
located and what they were tasked with. Moreover, there was no way of identifying which contractors 
were qualified to be on the fireground, for example, those who held unit standard 3285 (Demonstrate 
UNDER 
knowledge of protection of personal safety at vegetation fires). 
Some  of  the  forestry  and  contractor  representatives  suggested  to  the  review  team  that  they 
sometimes felt a lack of direction, resulting in their crews performing tasks they thought needed to 
be achieved, not as directed by the IMT. 
There were no issues identified for the fire at Tikokino, with the IMT  quickly able to support this 
fire.  
RELEASED 
Safety, Health and Wellbeing 
Our expectations 
22 
 

 
All Fire and Emergency New Zealand personnel comply with the Health and Safety at Work Act 
2015.  Furthermore,  a  Safety  Officer  was  appointed  in  compliance  with  the  Operational  Safety 
policy,  ensuring  the  Safe  Person  Concept  and  LACES  (lookouts,  awareness,  communications, 
escape routes, safety zones) were appropriately applied. A thorough risk analysis was conducted, 
monitored,  and  reviewed  throughout  the  incident.  All  hazards  and  control  measures  will  be 
recorded  on  the  Incident  Ground  Hazard  Assessment  form  and  transferred  to  a  Hazard 
1982
Assessment Board to manage if available. 
Any  injuries  or  near  misses to  firefighters,  contractors  or  members  of  the  public  were recorded. 
The  safety,  health  and  wellbeing  of  firefighters  and  contractors  was  managed  throughout  the 
ACT 
incident. 
Our findings 
A  near-miss  incident  case  report  was  entered  in  the  Fire  and  Emergency  safe@work  system 
reporting a near-miss related to the dropping of fire retardant on a forestry contractor. This incident 
was the subject of a separate Level 2 accident investigation. 
A Safety Officer was appointed at an early stage of the incident. However, due to the terrain and 
INFORMATION 
large amount of smoke on the incident ground, it was challenging to get good situational awareness. 
Commanders  arriving  at  the  incident  were  concerned  about  the  potential  fire  behaviour  and 
endeavoured to ensure they had crews, machinery, and appliances in safe locations.  
There  were  no  reported  injuries  or  near  misses  for  the  Tikokino  fire  and  a  safety  officer  was 
appointed as soon as a suitable person arrived. 
OFFICIAL 
Task Force 
A Task Force was deployed to Hawkes Bay from the greater Wellington area at the request of a 
THE 
Senior Officer. It comprised of volunteer (urban and rural) and career staff. Upon arrival, the task 
force was divided into two teams: urban and rural Volunteers and two Senior Officers relieving the 
Waipukarau  and  surrounding  brigades.  A  career  crew  was  also  "roaming"  the  greater  Central 
Hawkes  Bay  relieving  stations  as  required.  The  other  team,  made  up  of  career  crews,  relieved 
UNDER 
Hastings and Napier stations. Their role was to cover the station's everyday responses allowing 
staff plenty of rest. 
The crews either stayed on the stations with stretchers or bedding provided or at the USAR base 
set up at the Waipukarau camping ground. The task force was warmly welcomed by all crews from 
all stations who had worked excessive hours and were exhausted.  During their deployment, the 
task force crews attended many incidents.  
RELEASED 
23 
 

 
There was an issue in responding appliances attached to the task force. The only issues were that 
when a task force appliance responded to an incident in Hawkes Bay, it also activated the pagers 
at its home station, in Wellington. 
Personal Protective Equipment (PPE) 
Our expectations  
1982
The appropriate level of PPE was worn by personnel for their tasks, as prescribed in the Uniform and 
PPE  policy.  Furthermore,  the  PPE  performed  to  the  expected  level  and,  if  not,  was  impounded  and 
ACT 
reported accordingly.  
Our findings 
All  Fire  and  Emergency  crews  had  the  appropriate  PPE  for  the  tasks  required,  such  as  Level  2  for 
structure protection and wildfire gear for vegetation firefighting. However, there was an issue when the 
heavy  machinery  contractors  arrived  and  none  of  them  had  any  level  of  firefighting  PPE.  Fire  and 
Emergency New Zealand sourced and provided the appropriate PPE to initiate work such as bulldozer 
lines.  
INFORMATION 
Incident Debrief 
 
Our expectations 
The hot debrief  facilitated  at the  end of the  incident covered  the main  points relating to the  incident. 
Furthermore, the formal debrief(s) (if completed) were structured enabling all those in key roles at the 
OFFICIAL 
incident to provide input. All issues created a corrective action  plan to be managed locally or via the 
appropriate process.  
THE 
Our findings 
Representatives of the Operational Efficiency team attended debriefs of both fires. Most personnel 
invited were rural crews, so there was little input from urban crews, who were first in attendance 
at the incident. Due to the Covid-19 issues the initial debrief had to be delayed. 
UNDER 
Conclusion 
This operational review of the Level 2 Vegetation Incidents in Tangoio and Tikikino, Hawkes Bay 
highlights several areas for improvement for Fire and Emergency New Zealand.  
The  start  time  for  forestry  companies  and  Fire  and  Emergency  New  Zealand  when  working 
RELEASED 
together needs to be agreed, lack of suitable technology in the command units to manage wildfire 
incidents, lack of compatibility creating poor communication at the incidents, non-compliant PPE 
for  contractors  needed  at  large  scale  incidents,  and  the  absence  of  a  well-structured  IAP’s  and 
24 
 

 
IMT’s  are  some  of  the  significant  issues  that  need  to  be  considered  as  part  of  continuous 
improvement. These need to be addressed by management.  
Also capturing what is working well and what needs improvement is very important at the end of 
each operational cycle. This feeds into the next operational period IAP, but will also highlight any 
safety issues, or lack of resources etc 
The report also highlights the importance of debriefing and reviewing incidents promptly to identify 
1982
areas for improvement and implement changes once the incident is over. While there were delays 
in completing the review due to the Covid-19 lockdowns, the lessons learned from the incidents 
ACT 
can help Fire and Emergency  to improve for future long-duration incidents.  
But despite the issues identified regarding  the fires at Tangoio and Tikokino, crews and leaders 
worked hard to contain, control, extinguish, protect property, and mop up both fires. 
It is also acknowledged that there has been a significant delay in finally publishing this report, but 
many  of  the  issues  identified  for  improvement  discussed  through  this  review  were  not  lost  or 
ignored and have been addressed since these two fires occurred.  
Some examples of the improvement are: 
•  Improved PPE for firefighters involved in wildfires  INFORMATION 
•  Improved technologies on the command units, including the ability to supplement weak 
radio signal areas 
•  The integration of New Zealand’s 17 fire districts so there is clear leadership, skills, training, 
and resources for incidents in both the built and natural environments 
OFFICIAL 
•  A project has been implemented to improve fireground accountability for all incidents 
•  Development  of  16  ‘service  level  agreements’  between  Fire  and  Emergency,  forestry 
THE 
companies and/or forest management companies 
•  Development of standards for the utilisation of key contactors and machinery operators 
•  Annual Simulated Exercises (SIMEX) for each Region prior to the wildfire season 
•  Bi-annual fire plans for every Fire and Emergency District 
UNDER 
•  National  wildfire  weather  monitoring  during  the  wildfire  season  and  region  weekly 
reporting on personnel capacity for both firefighters and key IMT positions  
•  Region Incident Management Teams (RIMT’s) have been formed and over 40 personnel 
have attended the annual Planning Managers course 
•  Fire and Emergency have established an Air Desk function based on the AFAC model to 
RELEASED 
deploy  and  manage  aircraft  safely  during  incidents  including  wildfires  and  adverse 
weather events 
•  New aircraft audit standards have been developed 
25 
 


 
Review Authorisation  
This report has been authorised by Operational Assurance: 
Everything in this statement is true to the best of my knowledge and belief, and I made the 
statement knowing that it might be admitted as evidence for the purposes of the standard 
committal or at a committal hearing and that I could be prosecuted for perjury if the statement is 
1982
known by me to be false and is intended by me to mislead. 
 
ACT 
 
Trevor Brown 
Assistant National Commander 
National Manager Operational Assurance 
 
INFORMATION 
 
 
 
 
OFFICIAL 
 
 
 
THE 
UNDER 
RELEASED 
26