This is an HTML version of an attachment to the Official Information request 'Plans impacting commerce building'.







14
13
12
11 10
9
8
7
6
5
4
3
2
1
2.*B01
2.17
Balcony
Meeting Room
Area Excluded from Scope of Work
L
D1/2.16
2.18a
52 PARTITION SELECTIONS
52 PARTITION SELECTIONS
Cleaners
SELECTION
SELECTION DESCRIPTION
SELECTION
SELECTION DESCRIPTION
2.D01
STC 52 Wall - 1 Layer 12mm MDF on 2 layers of 13mm Gib NoiseLine on 76mm Steel Stud
Duct
52.20
Standard Partition - 13mm Standard Plasterboard on 76mm Steel Stud System lined With 13mm
Standard Plasterboard. No Batt Insulation. 102mm Wide.
52.28
System lined With 2 Layers 13mm Gib NoiseLine. Cavity to be filled with min. 14kg/m² Batt
Insulation.
D2/2.M01(e)
2.F01
52.21
STC 41 Wall - 13mm Standard Plasterboard on 76mm Steel Stud System lined With 13mm
Standard Plasterboard. Cavity to be filled with min. 14kg/m² Batt Insulation. 102mm Wide.
F. Toilet
2.M01
52.29
STC 41 Wall - 13mm Wet Area Plasterboard on 76mm Steel Stud System lined With 13mm Wet
STC 48 Wall - 13mm Wet Area Plasterboard on 13mm Gib NoiseLine on 76mm Steel Stud
Area Plasterboard. Cavity to be filled with min. 14kg/m² Batt Insulation.
M. Toilet
K
D2/2.18(e)
52.22
System lined With 13mm Gib NoiseLine and 13mm Wet Area Plasterboard. Cavity to be filled
(60)/60/-sm Fire Wall - 13mm Fire Rated Plasterboard on 90mm SG8 Timber framing Lined With
1 / AR-221 1 / AR-222
with min. 14kg/m² Batt Insulation. 128mm Wide.
52.30
13mm Fire Rated Plasterboard.  Cavity to be filled with min. 14kg/m² Batt Insulation. GIB
D1/2.M01(e)
GBTL60, 116mm Wide.
2.16
52.23
STC 52 Wall - 2 Layers 13mm Gib NoiseLine on 76mm Steel Stud System lined With 2 Layers
13mm Gib NoiseLine. Cavity to be filled with min. 14kg/m² Batt Insulation. 128mm Wide.
Conference Room
(60)/60/-sm STC 48 Fire Wall - 13mm Noiseline on Existing 16 Fyreline on Existing 92mm Steel
Studs lined with 2 layers Gib Noiseline. Cavity to be filled with min. 14kg/m² Batt Insulation. GIB
2.18
STC 52 Wall - 2 Layers 13mm Gib NoiseLine on 76mm Steel Stud System lined With 13mm Gib
52.31
GBSL 60b, 147mm Wide.
Lobby
NoiseLine and 13mm Wet Area Plasterboard. Cavity to be filled with min. 14kg/m² Batt Insulation.
NORTH
52.24
128mm Wide.
(60)/60/-sm STC 48 Fire Wall - 13mm Noiseline on Existing 13 Standard on Existing 92mm Steel
52.32
Studs lined with 2 layers Gib Noiseline. Cavity to be filled with min. 14kg/m² Batt Insulation. GIB
D1/2.18(e)
STC 58 Wall - 13mm Gib NoiseLine on 10mm Gib Noiseline on 92mm Rondo Quiet Studs
52.25
System lined With 10mm Gib Noiseline on 13mm Gib NoiseLine. Cavity to be filled with min.
GBS 60, 144mm Wide.
14kg/m² Batt Insulation. GIB GBQSA 90. 138mm Wide.
52.33
Standard Wall - 13mm Wet Area Plasterboard on 50/25 Timber Framing. No Batt Insulation
52.03
Reused
52.26
Standard Wall - 13mm Standard Plasterboard on 90 Timber Framing. No Batt Insulation. 103mm
STC 52 Wall - 2 Layers 13mm Gib NoiseLine on Existing 92mm Steel Stud System lined With
D2/2.19
STC -
Wide.
52.34
Existing 13mm Plasterboard With 13mm Gib NoiseLine. Cavity to be filled with min. 14kg/m² Batt
Insulation. 128mm Wide.
D1/2.C04(e)
52.10
52.27
Standard Wall - 13mm Standard Plasterboard on 50/25 Timber Framing. No Batt Insulation
-
2.19
2.C04
Seminar Room 01
STC 40
Circulation
FG1/2.19
52.23
52.21
05
GNS 134
GSS 132
03
AR-421
STC 52
STC 41
AR-420
52.32
GNS134 / GBSL 60b
52.31
GNS134 / GBSL 60b
45°
STC 48
04
J
03 52.30
STC 48
AR-421
AR-421 GBTL 60
52.21
STC 36
GSS 132
STC 41
52.31
2.20
2.22
52.21
GNS134 / GBSL 60b
Communications
Zoom Room 01
GSS 132
STC 48
52.02
D1/2.19
STC 41
2.15
VP60
STC -
2.D07
2.23
2.24
2.25
2.26
2.28
Group Study
Seminar Room 03
Seminar Room 04
Seminar Room 05
Seminar Room 06
52.11
Duct
Seminar Room 02
FW60P
STC 30
D1/2.15
52.31
D1/2.20
D1/2.22(e)
GNS134 / GBSL 60b
52.02
I
STC 48
02
VP60
STC 38
AR-421
52.27
2,170
Strapping
4,220
52.30
STC -
GBTL 60
H
3,785
90
orginal dim 2234
STC 36
2.S04
2.C03
Stairs
Circulation
D1/2.23(e)
Existing Glass Blocks
D1/2.24(e) Existing Glass Blocks
D1/2.25(e) Existing Glass Blocks
D1/2.26(e) Existing Glass Blocks
Existing Glass Blocks
D1/2.28(e)
Existing 16 Fyreline 
on framing
2.14
D2/2.C03
2.C05
2.C05
2.P02
New wall to align with 
Store 03
Circulation
Circulation
2070
Switchboard
existing wall
D1/2.21(e)
D1/2.27
G
D1/2.14(e)
FG1/2.C05
585
690
1,554
c.o.s
52.25
2.S02
2.27
GBQSA 90
Stairs
D2/2.C05(e)
STC 58
Zoom Room 02
2.21
2.29
D1/2.C05(e)
2.31
2.32
Meeting Room 02
2,704
Store 02
Zoom Room 03
Zoom Room 04
07
08
52.25
AR-420
GBQSA 90
52.25
3,254
AR-421
STC 58
GBQSA 90
D1/2.29
92
52.23
STC 58
GNS 134
STC 52
92
52.25
52.21
GBQSA 90
GSS 132
D1/2.31 D1/2.32
STC 58
STC 41
Existing Wall upgraded to 
D1/2.30
52.26
52.25
GBQSA 90
Standard
STC 52
D1/2.C03(e)
STC 58
F
STC -
2.*V01
2.*V01
600
2,704
92
1,897
76
2,266
92
2,602
92
1,979
600
c.o.s.
c.o.s.
D1/2.13
VOID
VOID
52.27
52.27
Strapping
STC -
2.C06
2.Q03
Strapping
Circulation
Informal / Breakout 01
52.27
STC -
E
FG1/2.13
Strapping
2.30
STC -
7,865
Seminar Room 07
7,104
1 / AR-221
1 / AR-221
1 / AR-222
52.27
Strapping
1 / AR-222
STC -
- / ---
-
- / ---
/ ---
- / ---
2.Q02
2.C02
2.13
Informal / Breakout 02
Circulation
Seminar Room 12
600
4,693
76
07
c.o.s.
52.23
52.27
AR-421
GNS 134
Strapping
52.23
52.34
52.23
STC 52
STC -
52.27
GNS 134
GNS 134
GNS 134
52.27
Strapping
STC 52
STC 52
2.*V01
STC 52
D
Strapping
2.*V01
STC -
VOID
STC -
VOID
52.03
92
76
Reused
STC -
D1/2.12
New wall to align with linings 
D1/2.33
around column
08
FG1/2.12
52.10
AR-420
52.25
-
GBQSA 90
STC 40
D1/2.11 D1/2.10
92
STC 58
2.12
2.33
6,854
6,663 c.o.s.
52.25
Seminar Room 08
Seminar Room 11
GBQSA 90
97 90
4,426
90
STC 58
52.23
92
2,586
92
GNS 134
STC 52
52.23
52.26
52.26 52.26
2.11
2.10
600
4,693
76
D2/2.S01(e)
GNS 134
Standard
Standard Standard
Zoom Room 06
Zoom Room 05
c.o.s.
STC 52
D2/2.S03(e)
STC -
STC -
STC -
W1/2.Q03
10
90
09
52.25
2.D08
New wall to align with linings 
AR-420
GBQSA 90
AR-420
600
Duct
STC 58
of fire wall
C
600
2.S01
New wall to align with linings 
Stairs
around column
2.S03
New wall to align with linings 
Stairs
2.P01
around column
New wall to align with linings 
52.27
New wall to align with linings 
New wall to align with linings 
Switchboard
around column
Strapping
around column
around column
STC -
B
52.27
52.27
545
2.09
Strapping
Strapping
550
Secure Store / Printing
STC -
2.44
92
3,317
76
3,715
92
3,317
76
3,715
92
3,317
76
STC -
New wall to align with linings 
52.21
52.23
52.28
Student Advisor (PP)
GSS 132
GNS 134
GNS 134
2.43
2.41
2.40
05
of fire wall
52.28
2.38
Student Advisor (PP)
Maori Programme
Pacific Programme
2.39
2.37
D2/2.37(e)
New wall to align with linings 
STC 41
STC 52
STC 52
AR-420
Student Advisor Team
2.P03 Switchboard
D1/2.S01(e)
3,033
GNS 134
Manager (PP)
Manager (PP)
Student Advisor (PP)
Resource Room
STC 52
Leader (PP)
D1/2.S03(e)
of fire wall
3,779
76
4,474
76
3,325
76
52.34
52.23
600
4,660
76
2,297
15°
52.34
52.23
52.34
GNS 134
GNS 134
52.23
GNS 134
GNS 134
GNS 134
02
GNS 134
2,281
76
4,676
600
2.08
52.10
2.02
2.01
STC 52
STC 52
STC 52
STC 52
STC 52
AR-420
76
STC 52
c.o.s.
52.23
Senior Admin, Student
-
Homestay Office
Client Services Admin
D1/2.09
52.23
GNS 134
4,662
Admin (PP)
(PELC)
STC 40
FG1/2.44 D1/2.44
FG1/2.43
D1/2.43
FG1/2.41
D1/2.41
FG1/2.40
D1/2.40
76
52.20
FG1/2.39
GNS 134
STC 52
Standard
940
52.23
D1/2.39
STC 52
52.23
52.23
01
GNS 134
GNS 134
GNS 134
D1/2.08
STC -
AR-420
STC 52
FG1/2.38
STC 52
STC 52
2.04
2,139
7,012
2.D05
860
D1/2.38
Duct
2.D04 Duct
Communication Room
2.34
167.29°
558 76
56°
76
Seminar Room 09
52.10
76
45°
860
D1/2.37
FG1/2.34
76
2.07
-
D1/2.04
FG1/2.02
D1/2.02 D1/2.01 FG1/2.01
4,328
52.10
604
Meeting Room 01
STC 40
52.23
76
3,041
D1/2.C01
2,138
-
GNS 134
2.C01
New wall to align with corner 
2.C01
STC 40
STC 52
2.C01
13
52.28
11
Circulation
New wall to align with linings 
12
76
of duct linings
52.03
AR-420
GNS 134
AR-420
52.27
52.27
AR-420
52.03
2,310
Reused
around lift
860
New wall to align with 
STC 52
Strapping
Strapping
52.28
GNS 134
Reused
STC -
D1/2.05
D1/2.03
linings around lift
STC -
STC -
2,006
76 1,322
STC 52
52.28
D1/2.36
D1/2.34
STC -
D1/2.07
FG1/2.06 159 D1/2.06
GNS 134
FG1/2.35
76
2.05
45°
D1/2.42
STC 52
76
D1/2.35
76
76
Cleaners
06
52.23
52.23
52.10
2.U06
AR-421
GNS 134
GNS 134
-
01
Unisex Toilet
2.U01
2.U07
52.34
STC 52
STC 40
D1/2.U06
STC 52
Unisex Toilet
Unisex Toilet
GNS 134
52.23
AR-421
D1/2.U01
04
GNS 134
AR-420
D1/2.U07
STC 52
2.36
student bags
600
8,267
76 1,208 76
2,036
92
1,621
76 1,948
D2/2.U07(e)
2.42
STC 52
Independent Learning
52.29
2.U05
2.D02
2.D03
Amenities
76
Centre (ILC)
2.U02
GSS 132
Unisex Bidet Toilet D1/2.U05
Duct
Duct
Unisex Toilet
2.35
4,676 c.o.s.
STC 41
2.03
D1/2.U02
2.L02
4,908
52.22
Seminar Room 10
4,712
52.22
Amenities
2.L01
2.LL01
Lift 2
GSS 134
2.U08
1,252
GSS 134
Lift 1
Lift Lobby
06
STC 48
STC 48
2.U03
Unisex Toilet
D1/2.U08
76
7,287
600
76
AR-420
Unisex Toilet
52.33
D1/2.UA02
2.06
52.27
52.24
2.UA01
D1/2.U03
Strapping
STC -
76 899 76
CAL 01
Strapping GNS 134
Unisex Accessible Toilet
D1/2.UA01
1,226
STC -
STC 52
52.29
2.UA02
A
GSS 132
2.U04
Unisex Accessible Toilet
STC 41
D2/2.03 Unisex Toilet
76
600
600
600
600
W1/2.UA01
52.33
W1/2.UA02
52.33
50
8,867
76
2,328
76 953
Strapping
STC -
Strapping
STC -
PATHWAY AND ENGLISH LANGUAGE CENTRE
McCOYWI O
X N
L02 OVERALL PARTITION PLAN
N
ARCHITECTS
scale
 1 : 100
project number
5878
242 Stuart St, PO Box 5456 DUNEDIN
B
Tender Issue
09.06.2023
A
Consent Issue
01.06.2023
AR-220
printed
12/06/2023 9:23:35 am
- / --- - / ---
T
 03 477 2030
status
E
  [email address]
W
mccoywixon.co.nz
rev.
TENDER
B
no. revision
date