This is an HTML version of an attachment to the Official Information request 'Earthquake assessment of head office'.
link to page 1 link to page 1 link to page 1



133 Molesworth Street 
PO Box 5013 
Wellington 6140 
New Zealand 
T+64 4 496 2000 
20 June 2022
Jack Hulls 
By email: [FYI request #19468 email] 
Ref:   H202206948 
Tēnā koe Jack 
Response to your request for official information 
Thank you for your request under the Official Information Act 1982 (the Act) to the Ministry of 
Health (the Ministry) on 25 May 2022. You requested: 
“information about the earthquake assessment of the ministry of health head office 
building on molesworth st. 
Of interest is when was it last assessed and what was the result”. 
The Ministry has identified two documents within scope of your request, itemised in Appendix 1 
of this letter. The table in Appendix 1 outlines the grounds under which I have decided to 
withhold information. Where information is withheld under section 9 of the Act, I have 
considered the countervailing public interest in release in making this decision and consider that 
it does not outweigh the need to withhold at this time. 
The Ministry head office located at 133 Molesworth Street is a leased building that was 
redeveloped back in 2015. At the time construction was finished, the building was declared to 
have achieved one hundred percent of the New Building Standard (NBS) at Importance Level 31 
(IL3), although the building would only generally meet the definition of IL2. As such, when 
discussing the strength of the building it is usually stated as being 130% IL2.  
Furthermore, as the building does not contain the structural elements of concern as detailed in 
section C5 of the Engineering Assessment Guidelines (Yellow Chapter)23, the structural 
assessments provided can be considered current. 
I trust this information fulfils your request. 
Under section 28(3) of the Act, you have the right to ask the Ombudsman to review any 
decisions made under this request. The Ombudsman may be contacted by email at: 
[email address] or by calling 0800 802 602. 
1 https://www.legislation.govt.nz/regulation/public/1992/0150/latest/DLM162576.html#DLM4417717 
2 http://www.eq-assess.org.nz/wp-content/uploads/2018/11/c5-concrete-buildings.pdf 
3 https://www.building.govt.nz/building-code-compliance/b-stability/b1-structure/what-you-need-to-know-
section-c5-concrete-buildings-proposed-revision/ 


Please note that this response, with your personal details removed, may be published on the 
Ministry website at: www.health.govt.nz/about-ministry/information-releases/responses-official-
information-act-requests.  
 
 
 
Nāku noa, nā 
 
 
 
 
 
 
Celia Wellington 
Deputy Director-General 
Corporate Services 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
Page 2 of 3 

Appendix 1: List of documents for release 
 

Date 
Document details 
Decision on release 

26 May 2015  Letter from Beca to Molesworth  Some information withheld under 
Of ice Trustee Ltd – 133 
section 9(2)(a) of the Act, to protect 
Molesworth St Redevelopment –  the privacy of natural persons. 
Update to Importance Level 3 

10 October 
Letter from Beca to Molesworth  Some information withheld under 
2016 
Of ice Trustee Ltd – 133 
section 9(2)(a) of the Act. 
Molesworth St – Structural 
Statement for CPU 
 
Page 3 of 3 

Document 1
85 Molesworth Street 
PO Box 3942, Wellington 6140, New Zealand 
T: +64 4 473 7551 // F: +64 4 473 7911  
E: [email address] // www.beca.com 
Molesworth Office Trustee Limited 
26 May 2015 
PO Box 30626 
Lower Hutt 5040 
New Zealand 
Attention: Mike McCombie 
ACT 1982
Dear Mike 
133 Molesworth St Redevelopment - Upgrade to Importance Level 3 
Further to our discussions in relation to the Importance Level of 133 Molesworth St, we are pleased to 
summarise the key changes and benefits of upgrading from Importance Level 2 (IL2) to Importance Level 3 
(IL3). 
The New Zealand loadings standard AS/NZS1170.0:2002 defines Importance Level for a building and sets 
out loadings for gravity, wind, earthquake and other loading conditions.  The required building Importance 
INFORMATION 
Level is based mainly on the building use, occupancy level and design life.  Most office buildings are only 
required to be IL2 – it is rare for an office building in New Zealand to be IL3 and would general y only apply to 
buildings that are very large and/or have a large occupancy. 
Beca has carried out investigations into the requirements for an upgrade to IL3, which included: 
n  Analytical model ing of the building 
n  Preliminary design of new lead rubber bearings to arrive at a feasible replacement bearing design 
n  Consideration of implications on the foundations and superstructure. 
An upgrade to IL3 wil  be achieved for 133 Molesworth St with revisions to the design, which includes the 
following considerations:  
n  Because of increased seismic demands, the base isolation system will require an upgrade which will 
involve the replacement of 39 of the existing lead-rubber bearings with new, higher performing lead-rubber 
bearings.  Mainly around the perimeter of the building. 
n  Because of increased wind loading, the building cladding and roofing systems require some upgrade. 
n  The increased demands on the suspended ceilings and services have also been considered. 
Benefits 
The main benefits of changing from IL2 to IL3 are: 
n  The seismic capacity of the building is increased by 30%.  That is, IL2 buildings are designed to remain 
standing after a 1-in-500 year seismic event, which has a 10% chance of being exceeded in a 50-year 
RELEASED UNDER THE OFFICIAL 
period.  IL3 buildings are designed to remain standing after a 1 in 1000 year seismic event, which has a 
5% chance of being exceeded in a 50-year period. 
n  The wind capacity of the building is increased by approximately 10%, in terms of ability to resist design-
level wind.  That is, IL2 buildings are designed to remain standing after a 1-in-500 year wind event, which 
Our Ref: 5292891 
NZ1-10722892-5  0.5 

Document 1
Page 2 
26 May 2015 
 
has a 10% chance of being exceeded in a 50-year period.  IL3 buildings are designed to remain standing 
after a 1-in-1000 year wind event, which has a 5% chance of being exceeded in a 50-year period. 
In summary, an IL3 building will provide a safer, more robust building than an equivalent IL2 building   Due to 
increased robustness, the chance of disruption to business operations as a result of damage to the primary 
structure following an earthquake is also reduced. 
ACT 1982
Additional Benefit of Base Isolation 
Base isolation inherently provides a high level of protection to the building contents which include non-
structural elements such as ceilings, partitions and building services.  The efore base-isolated buildings are 
more likely to remain operational after an earthquake than an equivalent non base-isolated building. 
We trust this letter meets your requirements.  Should you have any questions please do not hesitate the 
undersigned. 
 
INFORMATION 
Yours sincerely 
S9(2)(a)
Technical Director - Structural Engineering 
 
on behalf of 
Beca Ltd 
Direct Dial: 
 
S9(2)(a)
Email
 
S9(2)(a)
R THE OFFICIAL 
 
 
 
RELEASED UND
Our Ref: 5292891 
NZ1-10722892-5  0 5 

Document 2
 85 Molesworth Street 
PO Box 3942, Wellington 6140, New Zealand 
T: +64 4 473 7551 // F: +64 4 473 7911  
E: [email address] // www.beca.com 
John Robinson 
14 October 2016 
Molesworth Office Trustee Ltd 
PO Box 30626 
Lower Hutt, 5040 
ACT 1982
Dear John 
133 Molesworth St - Structural Statement for CPU 
The structural redevelopment work was designed to achieve 100% New Building Standard (%NBS
in accordance with NZSEE guidelines 2006 (including Corrigenda 1 and 2) and NZS1170.5:2004 
assuming an Importance Level of 3. 
Based on our site inspections carried out to CM3 in accordance with ACENZ/IPENZ guidelines, and 
information supplied by the contractor to date, we believe on reasonable grounds that the 
redevelopment works have been carried out generally in accordance with our design documents as 
INFORMATION 
consented under building consent Nº SR318039 and amendments 1,2&3 and subsequently altered 
by Consultant Advice Notices 1-243.   
On this basis we see no reason why the building should not be occupied after 28th October 2016. 
We trust this letter is satisfactory.  If you have any questions please do not hesitate to contact the 
undersigned. 
Yours sincerely 
S9(2)(a)
E OFFICIAL 
Senior Associate - Structural Engineering 
on behalf of 
 U
Direct Dial: 
 
S9(2)(a)
Email: 
 
S9(2)(a)
© Beca 2016 (unless Beca has expressly agreed otherwise with the Client in writing). 
This report has been prepared by Beca on the specific instructions of our Client. It is solely for our Client’s use for the 
purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to 
RELEAS
the above, to which Beca has not given its prior written consent, is at that person's own risk.  
Our Ref: 5292891 
NZ1-13208495-2  0.2 

Document Outline