This is an HTML version of an attachment to the Official Information request 'Title and subject of transport committee workshops'.

  
 
22 October 2021 
File Ref: OIAP-7-22350 
Peter Gent 
By email: [FYI request #16974 email] 
Tēnā koe Peter 
Request for information 2021-271 
I  refer  to  your  request  for  information  dated  1  October  2021  which  was  received  by  Greater 
Wellington  Regional  Council  (Greater  Wellington)  on  1  October  2021.  You  have  requested  the 
following: 
“Thank you for the information provided on 1 October 2021 regarding the list of workshops attended 
by the transport committee. 

Could you therefore please provide a copy of the title and subject area of each of the 15 workshop 
within the 2019 - 2021 period?” 

Greater Wellington’s response follows: 
Two additional columns being ‘Title of Workshop’ and ‘Subject of Workshop’ in Table 1 below have 
been added to the information provided to you in your previous request: 
 
 
 
 
 
 
Wellington office 
Upper Hutt 
Masterton office 
0800 496 734 
PO Box 11646 
PO Box 40847 
PO Box 41 
www.gw.govt.nz 
Manners St, Wellington 6142 
1056 Fergusson Drive 
Masterton 5840 
[Wellington Regional Council request email] 
 

 
TABLE 1 
Transport Committee Workshops 
Title of Workshop 
Subject of Workshop 
Held or Scheduled covering period:  
1 January 2019 to 31 December 2021 
20 February 2019 1 
Movin’ March 
Update  councillors  on  planned  programme 
and opportunities for involvement 
20 March 2019 1 
Draft Public Transport Plan  Development of Draft Public Transport Plan 
8 May 2019 1 
Sustainable Transport 
Digital railway station 
Committee Workshop (No 
specific Workshop Title) 
19 June 2019 1 
Sustainable Transport 
Project Next update 
Committee Workshop (No 
specific Workshop Title) 
20 February 2020 
Metlink Advertising Policy 
To  get  a  steer  from  Council  on  whether 
political  advertising  should  be  allowed  on 
Metlink controlled assets 
13 August 2020 
Field Trip 13 August (Note 
KiwiRail  tour  of  Trentham  Station  and  track 
Postponed to 22 October 
upgrades 
Due to Shift to AL2 
(COVID-19 Alert Level 2) 
22 October 2020 
Field Trip 22 October 
  KiwiRail  tour  of  Trentham  Station 
and track upgrades 
  Look  at  station  and  level  crossing 
work at Wallaceville Station 
3 December 2020 
Field Trip 3 December 
Tour of Seaview site to view electric ferry 
10 December 2020 
This date was incorrectly 
Emails relating to ferry fares for the Field Trip 
entered as a Workshop 
on 3 December (details above) 
11 February 2021 
Field Trip 11 February 
Lambton  Interchange  Project  and  Layover 
Space 
10 June 2021 
Transport Emissions: 
A  continuation  of  the  Climate  Commission 
Pathways to Net Zero by 
consultation early 2021 
2050 
05 August 2021 
No Workshop Title 
  Lower  North  Island  Rail  Integrated 
provided 
Mobility 
 
 
Page 2 of 3 


 
  Metlink Accessibility Charter 
  National  Ticketing  Solution  – 
Progress and Fares Update 
  Bio-fuels 
  Public Transport Workforce Strategy 
14 October 2021 
This date was incorrectly 
A workshop was not subsequently held. 
entered as a Workshop in 
our previous response 
25 November 2021 
This date was incorrectly 
This  date  was  incorrectly  entered  as  a 
entered as a Workshop in 
Workshop 
our previous response 
1  Prior to 2020 the Transport Committee was known as the ‘Sustainable Transport Committee’ 
 
If you have any concerns with the decision(s) referred to in this letter, you have the right to request 
an investigation and review by the Ombudsman under section 27(3) of the Local Government Official 
Information and Meetings Act 1987.  
 
Nāku iti noa, nā 
Luke Troy 
Kaiwhakahaere Matua | General Manager, Strategy 
 
 
Page 3 of 3