This is an HTML version of an attachment to the Official Information request 'Glen Eden Town Centre Upgrade - changes since 2018 consultation'.




 
20 Viaduct Harbour Avenue, Auckland 1010 
Private Bag 92250, Auckland 1142, New Zealand 
Phone 09 355 3553   Website www.AT.govt.nz 
23 August 2021 
Tim Robinson 
[FYI request #15910 email] 
Kia ora Tim 
The information you have requested – CAS-399423-W1V6H6 
I refer to your request for information dated 26 June 2021 regarding changes to the provision of kerbside 
parking between 166 and 184 West Coast Road as part of the Glen Eden Town Centre project. 
One kerbside parking space was removed outside 172-180 West Coast Road and a new footpath constructed. 
The parking area in front of 172 West Coast Road was widened without any compromises to the footpath area. 
The below general plan can be found on page three on the AT website project page. 
 
Drone Photo of Area 
 
 
 


 
 
 
 
 
We have provided copies of the Final Construction Drawings for this location plus the Glen Eden Plan. 
With regards to your request for “all communications” related to this area, our LGOIMA Business Partner 
contacted you more than once to refine this portion of your request including offering to discuss this portion of 
your request by phone. AT also ran two searches of our network for “al  communications” which resulted in 
830,000 emails in the first search and 222,810 emails in the second search. 
You were notified of the first outcome on 21 July 2021 and on 10 August 2021 you were notified this portion of 
your request would be declined under section 17(f) of the LGOIMA, which applies where the information cannot 
be made available without substantial collation or research. 
We have however provided “communications” that were readily and easily accessible related to this particular 
portion of your request, these can be found in the document titled “Communications”. 
Further design change information related to this project can be found on Glen Eden Town Centre Safety 
Improvements project page and the original proposal and feedback report can be located on the Glen Eden 
Town Centre Pedestrian Improvements project page. 
The project team completed traffic modelling and operations surveys to support the change as part of this 
project, we have provided the fol owing documentation: 
−  Glen Eden Town Centre Pedestrian Safety Improvements Feedback Repot May 2019 
−  AT Glen Eden Vil age Safety Improvements SSI – 200304 (funding application)  
−  Glen Eden Town Centre TCC Approved Resolution document 18 Dec 2020 
This project did not include cycling facilities, and this was not part of the original project scope. In order to 
implement cycle lanes, these would need to be considered in a more holistic manner rather than just being 
provided in smal  sections along the corridor. The proposed improvements wil  help to manage the safety for all 
road users, including cyclists, until further work to address cycling connections in the area can be investigated. 
With regards to your enquiry regarding omitting the 30km/h speed zone. During the consultation phase of the 
project AT received feedback both supporting and opposing the original proposed speed limit in the area. The 
decision was made not to proceed with speed limits at this time as the road infrastructure and road environment 
changes encourage slower speeds on West Coast Road. AT wil  however continue to monitor the operating 
speed in the area following completion of the project and wil  also add the speed limit change to the upcoming 
speed limit changes programme for further investigation and consultation. 
Please click on this link to download the information that we hold in relation to you request. 
Some sections of the provided documentation have been withheld under: 
-  Section 7(2)(a) of the Act, as withholding the information is necessary to protect the privacy of natural 
persons, including that of deceased natural persons. 
-  We have removed or redacted information not within the scope of your request. 
For any updates or general enquiries related to this project please contact my project team by email to 
[email address]. 
Should you believe that we have not dealt with your request appropriately, you are able to make a complaint to 
the Office of the Ombudsman and seek an investigation and review in regard to this matter. 
Kind regards 
 
 
David Nelson  
Portfolio Delivery Director (Projects) 
Integrated Networks 
 
 
 

Car parking 
 
removed and 
footpath widened 
 
Page 2 of 2 
Car park widened 
without