Geological Hazard and Risk 
Assessment of Mintaro Hut, 
Milford Track, Fiordland 

G T Hancox,  N D Perrin
 GNS Science Consultancy Report 2009/118
  12 August 2011

GNS Science Consultancy Report 2009/118 
 
Page ( i ) 
 
 
INTRODUCTION 
This report has been prepared by the Institute of Geological and Nuclear Sciences Limited 
(GNS  Science)  by  collaborative  arrangement  with  the  Department  of  Conservation  (DoC).  
The work was undertaken as part of GNS Science’s FRST research into the age and genesis 
of landslides in Fiordland.  DoC contributed logistic support (helicopter and accommodation) 
during visits to Mintaro Hut in 2009, and provided current data on the hut site, including a report 
by consultant geologist Royden Thomson 8 * on rock falls that occurred near the hut site during 
a ML 6.7 earthquake on 16 October 2007. 
One of the authors (G Hancox) carried out a Baseline Geological Inspection of Mintaro Hut on 
the Milford Track for DoC in April 2000 3 which identified a potential rock fall hazard at the site.  
Earthquake-induced rock fall activity near the hut in 2007, and greater knowledge of landslides 
in Fiordland from GNS Science research over the last nine years, suggested that the rock fall 
hazard at Mintaro Hut is greater than previously thought, and should be reassessed using a 
qualitative risk assessment approach.  The revised methodology was developed for DoC in 
2008 for evaluating geological hazards and risk at DoC backcountry hut and camp sites 5
The need for a reassessment of landslide hazards at Mintaro Hut was supported by Ross Kerr 
(Programme Manager Visitor Assets, DoC Te Anau Area Office), who approved helicopter 
landing at the site on the Milford Track.  He also arranged for assistance from the resident  
Hut Ranger during the visit by  the authors in April 2009, and accommodation at the hut in 
October 2009.  This report provides the results of those visits, and includes dendrochronology 
evidence used to determine the age of old rock fall deposits at the site, which was an essential 
part of the risk assessment. The report is intended to advise and assist DoC in managing 
Mintaro Hut and advising the public and hut users on geological hazards at the site. The format 
used is the Standard DoC Form for reporting on geological inspections of DoC hut sites. 
The report describes the geology, geomorphic setting, and geological hazards at the Mintaro 
Hut  site  in  the  upper  Clinton  valley.  The  estimated  likelihood  and  consequences  of  these 
hazards are then used in a qualitative risk analysis to assess the risk of each hazard to the hut 
and hut users.  The assessed risk and management options for geological hazards at the hut 
site are discussed, and where necessary recommendations are made to reduce risk at the site 
to an acceptable level, including the option of moving the hut to a new location. 
 
 
 
Note: References used in the report are indicated by superscript numbers and are listed in Section C11. 
 
 
 
DISCLAIMER 
 
This report has been prepared by the Institute of Geological and Nuclear Sciences Limited (GNS Science) in 
collaboration with and for use by the Department of Conservation.  GNS Science accepts no responsibility for 
any  use  of,  or  reliance  on  any  contents  of  this  Report  by  any  person  or  organization  other  than  the 
Department of Conservation and shall not be liable to any person or organization other than the Department 
of Conservation, on any ground, for any loss, damage or expense arising from such use or reliance. 
 
 
© Institute of Geological and Nuclear Sciences Limited 2011 
 
 





GNS Science Consultancy Report 2009/118 
 
     
   
 
GEOLOGICAL INSPECTION REPORT  
Page 1 of 16 
 
A.  SITE DATA
 
A1.  SITE:  Mintaro Hut  
GRID REF: E 2097 478, N 5586 715 
ALTITUDE: c. 620 m  BUILT: 1 Jan 1985 
A2. 
LOCATION:  Upper Clinton valley, Milford Track (Clinton Hut to Mackinnon Pass Section) 
 
B.  GEOLOGICAL INSPECTION AND HAZARD ASSESSMENT 
B1.  GEOLOGICAL INSPECTION BY: G Hancox, N Perrin, 2 April; 29-30 Oct 2009 
REPORT 22 July 2010 
B2.  PREVIOUS INSPECTIONS:  G Hancox, 11 April 2000;  R Thomson, 7 December 2007. 
DATE:  
B3.  REFERENCES 
Hancox, G., 2000:  Baseline Inspection Report on Mintaro Hut. GNS Hut Site Report.3 
 
Thomson, R., 2008:  Seismic Impact on the Milford Track: Report on rockfall inspections 7 Dec 20078
 
(see Section C11 for full list of references used in the report) 
 
2095 E
96 
97 
98 
C.  REPORT 
 
C.1.  SITE DESCRIPTION 
87 
C1.1  LOCATION: 
M i n t a r o  
R i d g e  

Mintaro Hut is located at an altitude of c.620 m on the south 
86 
(true  right)  side  of  the  upper  Clinton  valley,  on  the  Milford 
Track between Clinton Hut and Mackinnon Pass.  The hut 
site is on a bush-covered knoll about 15 m above the level of 
the  track,  well  above  the  Clinton  River  and  Lake  Mintaro 
(see Location Map). 
5585 N   
 
SITE LOCATION MAP (1:50,000 – D41) 
 
C1.2  TOPOGRAPHY: 
The hut is sited on a mound of old rock fall debris overlooking Lake Mintaro, a small (c.200 m long) landslide and 
fan-dammed lake in the head of the Clinton valley.  The site is bush-covered and is relatively flat, with abundant 
boulders apparent on the ground surface.  About 50 m southwest of the hut the valley slope („Mintaro Ridge‟ 8) rises 
steeply (45-65 ) to an elevation of c.1250 m up the glaciated rock wall of the Clinton valley.  The slope below the  
hut falls gently c.20 m to the broad valley bottom and the partly infilled Lake Mintaro (see site photos)
C1.3  SITE EXPOSURE: 
The site is in dense bush in the valley floor and is relatively sheltered. 
 
C1.4  VEGETATION: 
Mature Fiordland rain forest (silver beech) and sub-alpine scrub. 
C1.5  FLOODING HAZARD: 
Very low - hut is about 20 m above the Clinton River and Lake Mintaro. 
C1.6  OTHER COMMENTS: 
Several snow avalanche paths are present in the area (see Site Map 2) 6.  
Rock fall activity in the vicinity of Mintaro Hut (in gully c 400 m southwest of hut) was reported by DoC staff to have 
occurred during the 16 October 2007, ML 6.7 earthquake. GNS Science (GeoNet) reported that the earthquake 
was  located  60  km  west  of  Milford  Sound  (approx.  50  km  WNW  of  Mintaro  Hut).    The  Modified  Mercalli  (MM)  
shaking  intensity  in  the  Milford  Sound–Mintaro  Hut  area  was  estimated  to  be  MM 6–7  (see  Appendix  3)
The maximum MM intensity reported was MM 7 in the Hollyford valley.  Rock fall effects caused by the earthquake  
in the vicinity of Mintaro Hut were inspected by Royden Thomson for DoC on 7 December 2007 8. 
Note: 
This report should be used with reference to the “Revised Geological Hazard and Risk Assessment Method for DoC 
Backcountry Hut Sites and Camp Sites”. GNS Science Consultancy Report 2008/256 5
.
 
  




GNS Science Consultancy Report 2009/118 
 
 
 
 
Geological Inspection for:  Mintaro Hut 
 
Page 2 of 16 
 
 
 
 C2.  SITE DESCRIPTION 
 
 
 
S W  
N E  
 
Site Photo.  Aerial view of Mintaro Hut in the upper Clinton Valley. The hut is sited at the foot of Mintaro Ridge on 
a mound of old rock fall debris which has dammed the Clinton River to form Lake Mintaro, which is  now partly infilled. 
The line of the site Cross Section (NE-SW, below) is also shown. 
 
 
 
 
 
Site  Cross  Section.  Topographic 
cross section of the hut site showing 
Mintaro Hut in relation to the slope 
above  and  across-valley  from  the 
hut  site.   The slope behind the  hut 
rises  steeply  from  elevation  750–
1150  m,  with  an  average  slope  of 
about  60 .    A  potential  rock  fall 
source (PRS) is located at the top of 
the  steepest  section  of  the  slope 
directly above the hut. 
 
 
 
 



GNS Science Consultancy Report 2009/118 
 
 
 
  Geological Inspection for:  Mintaro Hut 
 
Page 3 of 16 
 
 
 
 
 
SITE MAP 1. Geomorphic map of hut site area 
 
 
 
 
 
 
 
S W  
 
 
 
 
Cross Section 
Line (NE-SW) 
N E
W  

 
Site Map 1. Geomorphic map of Mintaro Hut site showing old and recent rock fall deposits, rock fall paths, October 
2007 rock fall sources, and the possible source of a future large rock fall at the hut site. The volume of the older 
rock fall deposits on which the hut is located (inside the dashed red line) is about ~650,000 m3. 
 
SITE MAP 2.  Snow Avalanche Paths in the Mintaro Hut area 
 
 
 
 
 
Site  Map  2.    Map  showing  snow 
avalanche paths along the Milford Track 
in the upper Clinton valley 6. Avalanches 
may carry rock, soil and vegetation, and 
build debris fans (track location shown   
is incorrect –see Site Map 1)

 
 
 
 


GNS Science Consultancy Report 2009/118 
 
 
 
 
 
 
Geological Inspection for:  Mintaro Hut 
 
Page 4 of 16 
 
 
 
 C3.  SITE PHOTOS 
 
 
 
 
Photo  1.    Aerial  view  of  Mintaro  Hut  sited  on  old  rock  fall  debris  (yellow  triangles)  on  the  south  side  of  the  upper  
Clinton valley.  The old rock fall deposits at the hut site include angular boulders 1– 6 m across, on which ~170 year old 
beech trees are growing.  About 100 m southwest (upstream) of the hut is an area of younger, scrub-covered rock fall 
debris, built up at the base of the slope by periodic rock falls down paths (YRP) on the northwest side of Mintaro Ridge. 
These falls did not reach the hut site.  The October 2007 earthquake triggered several small rock falls near the crest the 
ridge (scars outlined in red).  Debris from these and other recent rock falls has accumulated at the apex of the debris fan, 
c.400 m southwest of the hut.  Rock at the top of the ridge directly above the hut is well jointed, with areas of relaxed 
open-jointed rock (OJ),and is a potential source of a future large rock fall at the site (PRS), particularly during a large 
(M7.5  or  >)  earthquake.    The  Mintaro  avalanche  path6  c.650  upstream  (right)  of  the  hut,  does  not  affect  the  site. 
 
 
 
 
 
 
 
 



GNS Science Consultancy Report 2009/118 
 
 
 
 
 
Geological Inspection for:  Mintaro Hut 
 
Page 5 of 16 
 
 
 
 C3.  SITE PHOTOS (contd.) 
 
 
 
M i n t a r o  
R i d g e  

M a c k i n n o n  
P a s s  

P R S  
U p p e r   C l i n t o n  
v a l l e y  
M i n t a r o  
H u t  

 
Photo 2.  Aerial view of Mintaro Hut site in the head of the Clinton valley, and Mackinnon Pass 1.5 km to the 
northwest. An area of steep, jointed rock on the northern end of Mintaro Ridge is a potential source of a large rock 
falls (PRS) that could affect Mintaro Hut in the foreseeable future (next 50 years).  The hut is founded on bush 
covered old rock fall debris, which last fell from that (PRS) part of the ridge possibly c. 200 years ago. 
r d  
y d  
r p  
H  
L a k e  
o d  
M i n t a r o  
D e b r i s  
f a n  
C l i n t o n  
R i v e r  
 
Photo 3.  Closer view of Mintaro Hut (H). The old, bush covered rock fall debris (od) includes 1-6 m boulders, which 
are scattered around the site.  Other features to note are younger, scrub-covered, rock fall deposits(yd); recent 
(c.1990-2007) rock fall debris (rd), and an active rock fall path (rp) about 250 m downstream. The partly-infilled 
Lake Mintaro was formed by blockage of the Clinton River by rock fall debris and a large debris fan (lower right). 
 



GNS Science Consultancy Report 2009/118 
 
 
 
 
 
Geological Inspection for:  Mintaro Hut 
 
Page 6 of 16 
 
 
 
 C3.  SITE PHOTOS (contd.) 
 
 
 
R S  
M i n t a r o  
R i d g e  

M R  
R S  
o s  
R S  
o s  
o s  
R o c k   f a l l   s o u r c e   a r e a  
( l a s t   c . 2 0 0 - 4 0 0   y e a r s )  

 
Photo 4.  Aerial view of an area of well jointed rock on the ridge 400-500 m above Mintaro Hut, which was the 
source of rock fall debris on which the hut is built, and is the likely source of future large rock falls at the site.  
Scars of older wedge failures are still visible (os), as are the source-scars of the October 2007 rock falls (RS).  
The glaciated rock mass to the right is more massive and has few failure scars. 
o s  
o s  
R S  
O J  
R S  
r p  
o s  
 
Photo 5.  Closer view of the jointed rock on the ridge above Mintaro Hut showing scars of older failures (os), one 
large area of opened jointed rock (oj), and source-scares (RS) and paths (rp) of the October 2007 rock falls. 
 
 
 
 




GNS Science Consultancy Report 2009/118 
 
 
 
 
Geological Inspection for:  Mintaro Hut 
 
Page 7 of 16 
 
 
 
 C3.  SITE PHOTOS (contd.) 
 
 
 
 
 
M i n t a r o  
 
R i d g e  
 
 
 
 
 
 
 
 
1  
 
 
O J  
 
 
 
2  
Photo 6.  Aerial view of two prominent areas of open-jointed  
rock (OJ) on the ridge about 500 m above Mintaro Hut.  This 
photo was taken in April 2000.  Both of these sites survived the 
October 2007 earthquake, although one small (~I m) block was 
O J  
dislodged from the upper site.  The vertical extent of the lower 
site  is  estimated  to  be  at  least  15-20  m.    The  approximate 
locations  of  two  of  the  2007  rock  fall  source-scars  are  also 
  shown (sites 1 and 2)
 
 
 
 
 
Photo  7.    Close  up  view  of  the  area 
behind Mintaro Hut (H) showing a large 
(6 x 4 x 3 m) boulder (b) 17 m from the 
b  
hut.  There are also many other 1–2 m 
boulders scattered around the hut site.  
t  
A  silver  beech  tree  about  500  mm  in 
diameter  is  growing  on  the  boulder.  
Coring of a nearby beech tree 560 mm 
in diameter showed the tree to be c.165 
years old.  Assuming there was a forest 
regrowth time lag of c.20 years, the last 
large fall rock fall to reach the hut site 
H  
occurred possibly 180-200 years ago. 
 
 
 
 
 
 
 
 
 
Photo 8.  Silver beech tree growing on 
a rock fall boulder on the Milford Track, 
25 m north of Mintaro Hut.  This tree is 
slightly smaller and younger (~83 years 
old, see Appendix 4)
 than the tree which 
  was cored (see Photo 9)
 
 
 
 



GNS Science Consultancy Report 2009/118 
 
 
 
 
Geological Inspection for:  Mintaro Hut 
 
Page 8 of 16 
 
 
 
 C3.  SITE PHOTOS (contd.) 
 
 
 
 
 
 
 
 
 
 
 
t 2  
 
 
 
 
 
 
 
t 1  
 
 
 
b  
 
 
 
 
 
t c  
 
 
Photo 9.  This photo shows the 560 mm diameter 
silver beech tree (t1) behind Mintaro Hut.  Coring of 
this tree with an incremental tree corer (tc) showed 
that  it  is  about 165 years old.  The large rock fall 
boulder (b) to the left of the cored tree has a beech 
tree (t2) of similar size and age growing on it. This 
indicates that the last rock fall to reach the hut site 
could have occurred about 180-200 years ago. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Photo 10.  The tree shown here is one of a number 
of  larger  (c.1  m  diameter),  c.325  year  old  beech 
trees growing on older rock fall debris around the 
hut site.  This particular tree, which is on the Milford 
Track about 20 from the hut, was knocked over and 
tilted by a 1.5 m boulder (out of picture to the left), 
after which it continued to grow sub-vertically.  This 
suggests there has been a succession of large rock 
falls  on  to  the  Mintaro  Hut  site  in  the  last  few 
hundred years. The last large rock fall in the hut site 
area occurred possibly about 183 years ago, during 
the 1826 Fiordland earthquake (~M 8-8.5) 1
   
 
 
 


GNS Science Consultancy Report 2009/118 
 
 
 
 
  Geological Inspection for:  Mintaro Hut 
Page 9 of 16 
 
C4.  SITE GEOLOGY 
Mintaro Hut is sited on a knoll of old rock fall debris derived from a very steep (45-65 ) ridge (Mintaro 
Ridge) on the south wall of the Clinton valley, immediately behind (southwest) of the hut (see Site Maps 
and Photos).  Based on the GNS 1:250,000 Geological Map 18 9, bedrock in the Mintaro Hut site area 
is  granitic  orthogneiss.    The  rock  is  unweathered  and  very  strong,  but  is  weakly  foliated,  and  has 
well  developed  joint  sets.    On  the  Mintaro  Ridge  above  900  m  (elevation)  the  joints  are  steep  to 
sub-vertical,  closely  spaced  (about  0.5-1  m),  and  persistent  over  c.5-10  m  or  more.    Some  of  the 
joints are open and show signs of rock mass dilation (see Photo 6)
The coarse rock fall debris on which the hut is built is estimated to be at least ~20 m thick, and includes 
angular  gravel  with  boulders  from  1  to  6  m  across  (Photos  7  and  9).    The  rock  fall  debris  covers  an 
area  of  c.120,000  m2,  and  has  an  estimated  volume  of  about  650,000  m3.    Rock  fall  debris  and  a 
large debris fan formed by the stream draining the south face of Mt Balloon has blocked the Clinton 
River to form Lake Mintaro, which is now partly infilled with glacial and alluvial sediments (Photo 3)
The rock fall deposit which the hut is sited on is inferred to have accumulated in the Clinton valley bottom 
over the last 10,000-12,000 years, since the end of the last glaciation.  Silver beech forest on the older  
rock fall deposits includes trees up to ~600 mm diameter growing on boulders near the hut.  Incremental tree 
coring  has  shown  that  these  beech  trees  are  approximately  165-180  years  old  (see  Appendix  4)
This suggests that the last large fall rock fall at the site occurred at least 180-200 years ago, possibly during 
the ~M 8 Fiordland earthquake of 1826 1.  There are also some ~1– 1.2 m diameter* (~300-400 year old) 
beech trees growing on older rock fall debris near the hut (Photo 10), which may have been deposited 
during the last (1717) Alpine Fault earthquake about.300 years ago 10, 11
Scrub-covered rock fall debris c. 80 m southwest of the hut (Site Map 1) suggests there have been periodic 
smaller rock falls in the area which prevented establishment of beech forest, but did not reach the hut site.  
No rock fall trails are apparent in beech forest near the site. 
 
 
 
 
* Tree diameter at breast height (standard measurement point). 
 
C5.  SITE and FOUNDATION STABILITY 
The foundation material at Mintaro Hut is old, bush covered rock fall debris – angular gravel and large 
angular  boulders  of  orthogneiss,  which  provides  a  stable,  well  drained  foundation  for  the  hut. 
No foundation stability or erosion problems are present at the site. 
 
 

GNS Science Consultancy Report 2009/118 
 
 
 
 
  Geological Inspection for:  Mintaro Hut 
Page 10 of 16 
 
C6.  GEOLOGICAL HAZARDS – Summary  (for details refer to Section C8, C9, and Appendices 1, 2, and 3. 
Mintaro Hut is potentially exposed to a range of geological hazards, and it has been assigned an overall 
geological hazard rating of Moderate (14), based on the all types of geological hazards, which are listed 
and rated in Appendix 1.  The foundation material (coarse angular gravel and boulders) provides a stable 
foundation for the hut, and because of its elevated position 20 m above the valley floor it is not exposed to 
erosion, flooding or debris flow hazards, for which low ratings (0 -1) are assigned.  However, the hut is 
sited on an old rock fall deposit, below a very steep, high slope, and is directly in the rock fall hazard zone 
if future large rock falls occur, especially during strong earthquake, for which  the maximum possible 
hazard ratings (5) are assigned.  The all-hazard rating (Moderate) of the site is potentially misleading as it 
tends to downplay the significant hazard and risk presented by future earthquake-triggered rock falls at 
the site.  Therefore, for the evaluation of geological hazards and risk at Mintaro Hut greater reliance is 
placed on the qualitative rock fall risk assessment presented in Section C8 and Appendix 2. 
The 16 October 2007, ML 6.7 earthquake (locally MM 6-7) caused small rock falls (c.1-2 m3, in total possibly 
5 –10 m3) in gullies 200-400 m from the hut (see Site Map 1 and Photo 1).  ).  No rock falls appear to have 
reached the hut site in the last ~180–200 years, based on tree-ring dating.  However, jointed rock on the 
ridge above the hut is a potential source of future large rock falls (possibly c.1000 –10,000 m3 or >) that 
could affect the hut, given a suitable trigger, such as a nearby ~M 7.5 or > earthquake.  The estimated 
volume (c. 650,000 m3) of old rock fall debris suggests there have been many such earthquake-induced 
rock falls at this site in the last 10,000 years, and they will continue to occur in the future.  Rainfall induced 
landslides, typically shallow slides and flows, have not affected the site in the past and, mainly because of 
the geomorphic features at the site, are unlikely to in the future. 
Qualitative ratings of the risk from geological hazards at Mintaro Hut (Section C8 and Appendix 2) are 
assessed  to  range  from  Very  Low  to  High  to  Very  High.    The  hut  site  should  be  inspected  by  an 
engineering geologist when future small rock fall occur (Priority 4)
The major hazard at the site is from a future large rock fall (c.1000 m3 or greater, with 1–6 m boulders) 
triggered by an Alpine Fault earthquake (the probability of this event in the next 50 years is potentially as 
high as ~30%)7, 11, or a large subduction zone earthquake, as occurred in 1826.  Because a large rock  
fall at the site is likely to cause substantial damage to the hut and probably loss of life, the risk from such 
an event is considered to be High to Very High. 
Because  of  the  very  steep,  inaccessible  terrain  at  the  site,  slope  stabilisation  or  rock  fall  protection 
measures to reduce the potential risk from earthquake triggered rock falls at Mintaro Hut are likely to be 
impractical.  It is therefore recommended that DoC give consideration to moving the hut to a lower risk 
location as soon as reasonably practicable [Priority 2]. 
 
 
 
 
C7. SITE MONITORING 
No instrumental or survey monitoring is necessary at Mintaro Hut.  However, the site is prone to periodic 
rock fall activity, and DoC should keep a record of future rock falls that occur at or near the hut site.  Any 
new rock fall activity should be evaluated by an engineering geologist.  The condition of the jointed rock 
mass on the ridge directly above the hut should also be inspected (by helicopter).  [Priority 4:  moderate 
significance - should be attended to when such events occur.] 
 
 
 
 
 
 
 
 

GNS Science Consultancy Report 2009/118 
 
 
 
 
  Geological Inspection for:  Mintaro Hut 
Page 11 of 16 
 
C8.  QUALITATIVE RISK ASSESSMENT SUMMARY(Refer to Appendix 2 for risk criteria and definitions) 
Hazard Type 
Likelihood 1 
Consequence Risk Level 
Comments and Risk Management Options 

The  risk  from  small  rock  fal s  (like  those  during  the  October  2007 
1. Small rock falls 
Almost certain 
Insignificant 
Very Low  earthquake) is acceptable because such fal s do not reach the hut. 
(~1-10 m3)2 - as have 
RP: 1–10 yrs 
to Low 
Smaller rock fal s tend to be channeled down gul ies away (upstream or 
occurred at the site in 
AEP: 95–10 % 
downstream) from the hut. However, the site and rock fal  source areas 
the last few years. 
should be inspected by an engineering geologist after such events in 
the future.  The risk is acceptable with this management measure. 
Areas of ‘younger‘ scrub-covered, rock fal  debris near the hut suggest 
2. Small to moderate 
Likely 
Insignificant 
Low 
that  small  to  moderate  rock  fal s  have  occurred  near  the  hut  site 
rock falls 
RP: 10–100 yrs 
periodically over the last few hundred years (probably during strong 
(~10 – 102 m3, 
AEP: 10–1.0 % 
earthquakes), preventing growth of beech forest.  Debris from such 
with 1–2 m boulders) 
fal s has travelled mainly down gul ies away from the hut, and has not 
come to within c.80-100 m of the site.  In addition, beech trees around 
the hut provide effective protection from smaller boulders (c.0.5–1 m), 
preventing them from reaching the hut.  For these reasons the level of 
risk for small to moderate rock fal s is thought to be acceptable
Geological and geomorphic evidence shows there is potential in the 
3. Large earthquake-
Possible 
Major to 
High to 
future for a large rock fal  at the hut site (c.1000 m3 or >, with 1-6 m 
induced rock falls 
RP: 100–1000 yrs 
Catastrophic 
Very High  boulders) especially during a large earthquake (≥ M 7.5–8.0; MM9-10) 
(~103 m3 or >, 
AEP: 1.0–0.1 % 
on the Alpine Fault or the Fiordland Subduction Zone.  Earthquake-
with 1–6 m boulders) 
induced landslides typically affect high, steep slopes and ridges, where 
 
shaking effects are amplified 2, 4.  There is a relatively high probability 
(up to ~30%) of an Alpine Fault earthquake in the next 50 years 7, 11
The consequences of large rock fal  would be major to catastrophic 
(damage and loss of life expected)
, and the risk of such an event is 
assessed as High to Very High.  Treatment options to reduce risk at 
the  site  to  an  acceptable  level  are  probably  impractical,  and  this 
probably means that the hut should be moved to a new site. 
4. Rainfall-induced 
Almost certain 
Insignificant 
Very Low  Although rainfal -induced landslides (typically shal ow slides and flows) 
Landslides 
RP: 1–10 yrs 
to Low 
occur frequently, there is no evidence of such failures in the immediate 
AEP: 95–10 % 
hut site area. The risk from such events is therefore acceptable
5. Foundation 
Rare 
Minor 
Very Low  The materials on which the hut are built are not prone to collapse or 
failure 
(0.02–0.01 %) 
erosion given the existing site conditions. Risk acceptable
6. Flooding, 
Inconceivable 
Insignificant 
Very Low  The elevated hut site is well above river level and there are no tributary 
debris flows 
(< 0.01 %) 
streams close to the hut. Risk acceptable
7. Snow avalanches 
Unlikely 
Insignificant 
Very Low  The closest known avalanche path (Mintaro - RP 20yrs) 6 does not 
(associated rock and 
RP: ~1000-5000 yrs 
affect the hut site.  There is no known snow avalanche activity at the 
 debris flows) 
AEP:~0.10–0.02 % 
site.  Risk acceptable. 
 
 
 
 
 
Notes and additional comments: 
1.  Likelihood (%) estimates are given as the approximate Return Periods (RP) and the annual probability, or and Annual 
Exceedance Probability (AEP)- Appendix 2 5
2.  The terms used to describe the relative size landslides and rock falls apply only in the context of this report. In most  
instances the terms used are qualified by an approximate landslide volume (m3). The volumetric estimates can be  used 
to compare the size of rock falls listed above with terms used for the much greater range of landslide sizes in Appendix 3. 

3.  References 2, 4, 5, 6 (etc) are listed in Section C11. 
 
 
 
 
 
 
 

GNS Science Consultancy Report 2009/118 
 
 
 
 
  Geological Inspection for:  Mintaro Hut 
Page 12 of 16 
 
C10. 
CONCLUSIONS and RECOMMENDATIONS 
1. 
Mintaro  Hut  is  sited  on  a  knoll  of  old  rock  fall  debris  on  the  south side  of the  upper  Clinton  valley.  
Foundation material at the site is compact angular gravel and boulders, which is thought to be stable 
and resistant to erosion and collapse. 
2. 
The hut site is potentially exposed to a range of geological hazards, and has a been assigned an overall 
Geological Hazard Rating of Moderate, mainly because of the hut’s location within a rock fall hazard 
zone, and the possible effects of a future large earthquake in the area. 
3. 
The existing evidence suggests that rock falls from the ridge above Mintaro Hut large enough to reach 
the hut site (possibly 1000 m3 with boulders up to 6 m across) may occur every 100-200 years.  The last 
rock falls to reach the site were probably triggered by earthquake shaking of MM8–9 or > (Appendix 3)
which probably last occurred during the 1826 Fiordland  Subduction Zone earthquake, and before that 
the 1717 Alpine Fault earthquake.  Shaking of similar intensity (~MM8–9) in the future is expected to 
trigger further large rock falls at the site.  The consequences of such an event could be catastrophic. 
4. 
Qualitative  ratings  of  risk  posed  by  geological  hazard  at  Mintaro  Hut  range  from  Low  to  Very  Low  
for  small  and  moderate  sized  rock  falls,  to  High  to  Very  High  for  a  future  large  rock  fall  triggered 
by an Alpine Fault earthquake, or possibly a large subduction zone earthquake similar to the 1826 
earthquake.  Such a rock fall is likely to cause substantial damage to the hut and probably loss of life. 
5. 
Because  mitigation  measures  to  reduce  the  risk  from  rock  falls  at  Mintaro  Hut  to  an  acceptable 
level appear to be impractical, it is recommended that consideration should be given to moving the  
hut to a lower risk location as soon as reasonably practicable [Priority 2]. 
 
C11. 
REFERENCES 
1. Downes, G. Cochran, U., Wallace, L, Reyners, M., Berryman, K., Walters, R., Callaghan, F., Barnes, P., 
Bell, R., 2005.  Understanding local source tsunami: 1820 Southland tsunami. EQC Project 03/490. GNS 
Science Client Report 2005/153. 

2.  Hancox  G.T.,  Perrin  N.D.,  Dellow  G.D.,  1997.  Earthquake-induced  landsliding  in  New  Zealand  and 
implications for MM intensity and seismic hazard assessment. GNS Client Report 43601B. 106 p. 
3. Hancox, G.T., 2000.  Baseline Inspection Report on Mintaro Hut. GNS Hut Site Report. GNS Science 
Baseline Geological Inspections of DoC Hut Sites, 11 April 2000. 
4. Hancox G.T., Perrin N.D., Dellow G.D., 2002. Recent studies of historical earthquake-induced landsliding, 
ground damage, and MM intensity in New Zealand. Bulletin of the New Zealand Society for Earthquake 
Engineering 35(2): 59–95

5. Hancox, G.T., 2008.  Revised Geological Hazard and Risk Assessment Method for DoC Backcountry Hut 
Sites and Camp Sites.  GNS Science Consultancy Report 2008/256, 16 October 2008. 
6.  Owens,  I.F.,  Fitzharris,  R.R.,  1985.  Avalanche  Atlas  of  the  Milford  Track  and  Assessment  of  the 
Hazard to Walkers. NZ Mountain Safety Council, Avalanche Report No 8, November 1985 
7. Rhoades, D.A., Van Dissen, R.J., 2003. Estimates of the time-varying hazard of rupture of the Alpine 
Fault, New Zealand, allowing for uncertainties. New Zealand Journal of Geology and Geophysics 
46, 479–488. 

8. Thomson, R., 2008.  Seismic Impact on the Milford Track: Report on rock fall inspections 7 Dec 2007. 
Consultancy report prepared for DoC Te Anau, January 2008. 
9. Turnbull, I.M., (compiler) 2000. Geology of the Wakatipu area. Institute of Geological and Nuclear Sciences 
1:250,000 Map 18. 
10. Wells, A., Yetton, M.D., Duncan, R.P., Stewart, G.H., 1999.  Prehistoric dates of the most recent Alpine 
Fault earthquakes, New Zealand. Geology, November 1999, Vol. No. 11, pp. 995–998. 
11. Biasi, G., Clark, K., Berryman, K., Cochran, U., Prior, C. 2010. Dating informed correlations and large 
earthquake recurrence at the Hokuri Creek paleoseismic, Alpine Fault, New Zealand. Proceedings AGU 
Fall Meeting, 13–17, December 2010, San Francisco, Abstract T41C-08.
 
 
Acknowledgements 
The authors wish to thank their GNS Science Colleagues Grant Dellow and Chris Massey for reviewing this 
report, and also Ross Kerr (DoC Te Anau) for arranging access and accommodation at Mintaro Hut during  
our field work for this study.  We also wish to thank Royden Thomson for providing information from his  
aerial inspection of the hut site following the 2007 earthquake. 
 
 

GNS Science Consultancy Report 2009/118 
 
 
 
 
 
Geological Inspection for:  Mintaro Hut 
Page 13 of 16 
 
  
APPENDIX 1a:  Geological Hazard Rating 
 
 Geological Hazard Rating is used to indicate the significance of a number of geological hazards (such as geologic 
and topographic site conditions, slope failure, seismicity, flooding, seiches and volcanic activity) at DoC Hut and 
Camp Sites.  At specific sites, each hazard factor is subjectively assigned a factor value ranging from 0-5 (least to 
most hazardous), based on the site inspection, monitoring, history, and other relevant data.  An overall Geological 
Hazard Rating
 (index) for the site is assigned by summing the factor values. 

 
 
FACTOR VALUE 
GEOLOGICAL  HAZARD FACTORS 
(Place X in appropriate cell to indicate Factor Values) 






1.  Slope angle and local topographic effects at site 
 
 
X 
 
 
 
2.  Site geology and foundation materials 
 
X 
 
 
 
 
3.  Proximity to steep slope below site 

 
 
 
 
 
4.  Hazard from slopes above site (rock and debris fall, avalanche, slide) 
 
 
 
 
 

5.  Foundation failure (none, possible, incipient, active) 

 
 
 
 
 
6   Earthquake effects (topographic-enhanced shaking, slope failure) 
 
 
 
 
 

7  Heavy rainfall, flooding, erosion, debris flows/floods etc. 
X 
 
 
 
 
 
8.  Other (snow avalanches; faulting) 
 

 
 
 
 
Sum of Hazard Factor Values
14 
GEOLOGICAL HAZARD RATING FOR: Mintaro Hut 
14 (Moderate) 
TOTAL FACTOR VALUES FOR GEOLOGICAL HAZARD RATINGS: 
Very low:  0-5  
Low:  6-12   
Moderate:  13-18   
High:  19-24  
Very High:  25 or greater 
 
APPENDIX 1b: 
 Priority Ratings For Recommendations: 
The following  Priority Ratings  are used for rating Recommendations given in this report for mitigating geological 
hazards at DoC hut sites and camp sites. They are mainly based on the Geological Hazard Rating and Risk Level at a 
site, and indicate the time frame within which the recommendation should be attended to. Specific time frames for 
responding to unacceptable risk from any hazard should be specified in the Qualitative Risk Assessment (C8). 

Priority 1: 
Recommendation  of  very  great  significance  and  URGENT,  at  a  site  where  there  is  Very  High  geological 
hazard (Rating >25) or Very High Risk from one or more hazard.  Should be attended to immediately. 

Priority 2: 
Recommendation of great significance, at a site where there is High geological hazard rating or High Risk 
from one or more hazard.  Should be attended to, as far as reasonably practicable, within next 12-18 months. 
Priority 3:  Recommendation  of  considerable  significance,  at  a  site  where  there  is  Moderate  geological  hazard 
(Rating 13-18), or Moderate Risk from one or more hazard.  Should be attended to as far as reasonably 
practicable, within the next three years. 

Priority 4: 
Recommendation of moderate significance, at a site where there is Low to Moderate geological hazard 
(Rating  6-18)  or  Moderate  to  Low  Risk  from  one  or  more  hazards.    Should  be  attended  to,  as  far  as 
reasonably practicable, within the next five years. 

Priority 5:  Recommendation  of  some  significance,  at  a  site  where  there  is  low  or  very  low  geological  hazard,  or 
Low Risk or Very Low Risk from a hazard.  Should be attended to within the next ten years. 
 
 
 
 
 
 

GNS Science Consultancy Report 2009/118 
 
 
 
 
Baseline Geological Inspection for: Mintaro Hut 
Page 14 of 16  
 
 
APPENDIX 2:  Qualitative Geological Hazard And Risk Assessment 
(see C8 and C9)
 
 
 
1- Qualitative Measures of Likelihood of Hazard Events 
Indicative 
Annual 
Level 
Descriptor 
Description 
Probability 2 
Probability 2 
(Return Period) 
(%) 

ALMOSTCERTAIN  The event is ongoing, or expected to occur (in next 50 years) 
1–10 years 
c. 95 – 10 

LIKELY 
The event is expected to occur under adverse conditions. 
10–100 years 
10 – 1.0 

POSSIBLE 
The event could occur under adverse conditions. 
100–1000 years 
1.0 – 0.10 

UNLIKELY 
The event might occur under very adverse conditions. 
1,000–5,000 years 
0.10 – 0.02 

RARE 
The event could occur under extreme conditions. 
5,000–10,000 years 
0.02 – 0.01 
F 
INCONCEIVABLE 
The event is inconceivable under present conditions. 
>10,000 years 
< 0.01 
Notes1, 2:  1. Descriptions define in words the likelihood of a hazard event occurring and impacting on a structure, house, hut site or camp site.  
2. Probabilities are approximate and may vary depending on hazard types, site history, and period of concern –in this case the next 50 years. 

2 - Qualitative Measures of Consequences to Property and People from Hazard Events 
Level 
Descriptor 
Description
1 
CATASTROPHIC 
Structure completely destroyed or large scale damage requiring engineering works for 
stabilisation. Fatalities and severe injuries are likely. 

MAJOR 
Extensive damage to most of structure, or extending beyond site boundaries requiring significant 
stabilisation works. Severe injuries to people and some fatalities possible. 

MEDIUM 
Moderate damage to some of structure, or significant part of site requiring stabilisation works.  
Injuries requiring medical treatment, hospitalisation; fatalities unlikely. 

MINOR 
Limited damage to part of structure or part of site requiring some reinstatement or stabilisation 
works.  Minor injuries, without hospitalisation. 

INSIGNIFICANT 
Little damage. No injuries. 
Note:  1. Examples of possible consequences are given as a general guide, and can be adapted to suit particular cases or sites. 
3 - Qualitative Risk Analysis Matrix – Level of Risk to Property and People from Hazard Events 
LIKELIHOOD 
CONSEQUENCES to PROPERTY and PEOPLE 
1: CATASTROPHIC 
2: MAJOR 
3: MEDIUM 
4: MINOR 
5: INSIGNIFICANT 
A – ALMOST CERTAIN 
VH 
VH 
H 
M 
L 
B – LIKELY 
VH 
VH 
H 
M 
L 
C – POSSIBLE 
VH 



VL 
D – UNLIKELY 




VL 
E – RARE 



VL 
VL 
– INCONCEIVABLE 

VL 
VL 
VL 
VL 
4 - Risk Level Implications for Hazard Events 
Risk Level 
Implications and Response (1) 
VH 
VERY HIGH RISK 
Investigation, planning and implementation of treatment options essential to reduce risk to an acceptable 
level. This may be too expensive or not practical, and may require moving to a new site. 

HIGH RISK 
Investigation, planning and implementation of treatment options required to reduce risk to an acceptable 
level. May be too expensive or impractical, and require moving to a new site. 

MODERATE RISK 
Tolerable provided treatment plan is implemented to maintain or reduce risks.  May be accepted, but 
requires investigation and planning of hazard mitigation measures. 

LOW RISK 
Usual y acceptable.  Some minor treatment options may need to be defined to maintain or reduce risk. 
VL 
VERY LOW RISK 
Acceptable.  Manage by normal inspection and monitoring procedures. 
Notes:  (1) The implications for a particular situation should be determined by all parties to the risk assessment; those given above are as a general guide only. 
 
(2) Use of dual descriptors for Likelihood, Consequence and Risk to reflect uncertainty of the estimate may be appropriate in some cases
 
Criteria for Qualitative Risk Assessment of landslides and geological hazards at DoC Hut Sites and Camp Sites. 
(after Australian Geomechanics Society, 2000: Landslide Risk Management and Guidelines, Appendix G. Australian Geomechanics, 35 (1) 49–92.) 
 

GNS Science Consultancy Report 2009/118 
 

 
 
 
Baseline Geological Inspection for: Mintaro Hut 
Page 15 of 16  
 
 
 
 
   APPENDIX 3.  Modified Mercalli (MM) Intensity Scale  Landslides and Environmental Criteria (4) 
MM 6    Trees and bushes shake, or are heard to rustle. Loose material dislodged on some slopes, e.g. existing  
  slides talus and scree slope. 
 
  A few very small (<103 m3) soil and regolith slides and rock falls from steep banks and cuts. 
 
  A few minor cases of liquefaction (sand boil) in highly susceptible alluvial and estuarine deposits. 
MM 7    Water made turbid by stirred up mud. 
 
  Very small (<103 m3) disrupted soil slides and falls of sand and gravel banks, and small rock falls from  
  steep slopes and cuttings common. 
 
  Fine cracking on some slopes and ridge crests. 
 
  A few small to moderate landslides (103 –105 m3), soil/rock falls on steep slopes (>30°) on 
  coastal cliffs, gorges, road cuts/excavations etc. 
 
  Small discontinuous areas of minor shallow sliding and mobilisation of scree slopes in places. 
  Minor to widespread small failures in road cuts in more susceptible materials. 
 
  A few instances of non-damaging liquefaction (small water and sand ejections) in alluvium. 
MM 8    Cracks appear on steep slopes and in wet ground. 
 
  Significant landsliding likely in susceptible areas.  
 
  Small  to  moderate  (103-105 m3)  slides  widespread;  many  rock  and  disrupted  soil  falls  on  steeper 
  slopes (terrace edges, gorges, cliffs, cuts etc). 
 
  Significant areas of shallow regolith landsliding, and some reactivation of scree slopes. 
 
  A few large (105-106 m3) landslides from coastal cliffs, and possibly large to very large (>106 m3) rock slides 
  and avalanches from steep mountain slopes. 
 
  Larger landslides in narrow valleys may form small temporary landslide-dammed lakes. 
 
  Roads damaged and blocked by small to moderate failures of cuts and slumping of road-edge fills. 
 
  Evidence of soil liquefaction common, with sand boils and water ejections in alluvium, and localised lateral 
  spreading (fissuring, sand and water ejections) and settlements along banks of rivers, lakes, and canals etc. 
MM 9    Landsliding widespread and damaging in susceptible terrain, particularly on slopes steeper than 20°. 
  Cracking on flat and sloping ground. 
 
  Extensive areas of shallow regolith failures and many rock falls and disrupted rock and soil slides on 
  moderate and steep slopes (20°-35° or greater), cliffs, escarpments, gorges, and man-made cuts. 
 
  Many small to large (103-106 m3) failures of regolith and bedrock, and some very large landslides  
  (106 m3 or greater) on steep susceptible slopes. 
 
  Very large failures on coastal cliffs and low-angle bedding planes in Tertiary rocks.  Large rock/debris 
  avalanches on steep mountain slope in well-jointed greywacke and granitic rocks.  Landslide-dammed 
  lakes formed by large landslides in narrow valleys. 
 
  Damage to road and rail infrastructure widespread with moderate to large failures of road cuts slumping 
  of road-edge fills.  Small to large cut slope failures and rock falls in open mines and quarries. 
 
  Liquefaction  effects  widespread  with  numerous  sand  boils  and  water  ejections  on  alluvial  plains,  and 
  extensive,  potentially  damaging  lateral  spreading  (fissuring  and  sand  ejections)  along  banks  of  rivers, 
  lakes, canals etc).  Spreading and settlements of river stop banks likely. 
MM 10    Landsliding very widespread in susceptible terrain (3). 
 
  Similar effects to MM9, but more intensive and severe, with very large rock masses displaced on steep 
  mountain slopes and coastal cliffs.  Landslide-dammed lakes formed.  Many moderate to large failures of 
  road and rail cuts and slumping of road-edge fills and embankments may cause great damage and closure 
  of roads and railway lines. 
 
  Liquefaction effects (as for MM9) widespread and severe.  Lateral spreading and slumping may cause rents 
  over large areas, causing extensive damage, particularly along river banks, and affecting bridges, wharfs, 
  port facilities, and road and rail embankments on swampy, alluvial or estuarine areas. 
NOTES
(1)  “Some or ‘a few’ indicates that threshold for an effect or response has just been reached at that intensity. Effects below MM 6 generally insignificant in NZ.  
(2)  Intensity is principally a measure of damage.  Environmental damage (response criteria) occurs mainly on susceptible slopes and in certain materials, hence the 

effects described above may not occur in all places, but can be used to reflect the average or predominant level of damage (or MM intensity) in a given area. 
(3)  Environmental criteria have not been proposed for MM11 and 12, as those levels of shaking have not been reported in New Zealand. 
(4)  This appendix is based on Hancox et al. 1997 2, 2002 4.  
The environmental criteria described above have now been formally incorporated in the New 
Zealand MM Intensity Scale (Dowrick, D.J., Hancox, G.T., Perrin, N.D., Dellow, G.D., 2008. The Modified Mercalli Intensity Scale – Revisions Arising 
From New Zealand Experience.  Bulletin of the NZ Society for Earthquake Engineering, 41(3):193–205.) 
 
 


GNS Science Consultancy Report 2009/118 
 

G 
Page 16 of 16 
 
APPENDIX 4. Beech Tree Diameter versus Tree-ring Age Data at Mintaro Hut 
 
 
Reference 
Langridge, R., Duncan, R., Almond, P., Robinson, R. 2007.  Indicators of recent paleoseismic activity 
along the western Hope Fault. GNS Science Consultancy Report 2006/151. 