Schedule 7, B Section 4. 4. 4 (2)
The Timetable to be provided by Auckland Transport wil show in time-order:
(1) scheduled departure time from the departure point;
(2) major intermediate
timing-points (if any);
(3) scheduled arrival time at the final destination.
Schedule 7, B Section 4. 4. 8
The first stop in the Timetable and the major intermediate
timing points as advised by Auckland Transport are
mandatory within the context of the
Performance Regime in schedule 3 of the Unit Agreement. Al other times are approximate times.
From Schedule 3: Performance Regime (in the PTOM Unit Agreement):
Default
Reporting
Performance
Area
Data
Event
Deduction
Expected
Bonus
Reporting
Services
Source Definition
trigger for
regime
Deliverable
Regime
Services
Deduction
Deduction/Performance
Cure Plan
Bonus Downside only. Below
98% a Cure Plan is
Punctuality at
Defined as percentage of sighted trips
Monthly
developed . Below 99.9%
Timing Points
leaving the timing points more than 59
reporting. Data
an abatement of 0.25% of
EDW
seconds before the scheduled departure
Below
available at al
N/A
AGP to a maximum of 1%
Non-Headway
time of the timing point. (Calculated for the
98%
Below 100%
100%
None
times through
AGP p.a. divided by twelve
managed Routes
previous calendar month)
EDW
for every 0.5% below
deducted monthly two
months in arrears.
Document Outline