Acty name:
JASCO BLACK
Acty dates:
1982
Acty location:
South Korea
Aggregated Risk(1)
VERY LOW
LOW
MEDIUM
HIGH
VERY HIGH
THE
COMJFNZ Risk Appetite:(2)
Cautious
ACT
Decision
Cancel
Table 1: Aggregated Risk
Matrix
Location threat
Country COVID-19 threat(3)
VERY LOW
LOW
MODERATE
HIGH
VERY HIGH
UNDER
Travel options for extraction
NZDF
Allies/multi-
Limited commercial International SOS Uncertain/Nil
commercial
Duration of Activity
Transit
Transit – 7 Days
8-14 Days
15-28 Days
Permanent
Organisational risk
Need for travel(4)
Operations
OLOC
DLOC
NZDF Business
Personal
Significant
INFORMATION
Impact of attending acty(4)
Critical Enabling
reputation
Allied Benefit
NZDF benefit
Nil significant
Travel numbers
1
2-3
4-10
11-99
100+
RELEASED
Notes:
1. From Table 1
2. "Cautious" requires a limited tolerance for uncertainty
3. Risk is unmitigated by NZDF health support plan; includes number of COVID-19 cases; includes percentage cased/local population; HN ability to respond; NZ ability to sustain life
4. Impacts are reversed due to the correlation of these to the aggregated risk (e.g. operations are the highest priority to the organisation so is aligned to the VERY LOW risk rating)
OFFICIAL