This is an HTML version of an attachment to the Official Information request 'Road cost information'.

   
50 Victoria Street 
Private Bag 6995 
 
Wellington 6141 
 
New Zealand 
T
 
 64 4 894 5400 
F 64 4 894 6100 
 
www.nzta.govt.nz 
 
 
3 April 2020 
 
David 
[FYI request #12334 email] 
REF: OIA-6472 
 
Dear David 
 
Request made under the Official Information Act 1982 
 
Thank you for your email of 29 February 2020 requesting the following information under the Official 
Information Act 1982 (the Act): 
… the construction cost (prior to the opening of the road) and the maintenance and operation 
(to date, by year, since the opening of the road) for the following roads: 
East Taupo Arterial Corridor 
Hawke's Bay Expressway 
Kapiti Expressway  
Northern Gateway 
Ruby Bay Bypass 
Takitimu Drive 
Tauranga Eastern Link 
Waikato Expressway 
Wellington Inner City Bypass 

Could you please separate out the maintenance and operation cost (rather than combine 
them). 
Excluding the above roads, could you please let me know what other new state highways 
have been constructed since 2008? 
 
The table below gives the construction costs for the projects listed in your request.  
Project 
Cost 
Further information 
($m) 
East Taupo 
131.5 
www.nzta.govt.nz/assets/planning/monitoring/audits/docs/2016-2017-pir-east-taupo-
Arterial Corridor 
arterial.pdf 
Hawke's Bay 
13 
www.nzta.govt.nz/projects/hawkes-bay-expressway-improvements/ 
Expressway 
Kapiti 
630 
www.nzta.govt.nz/projects/wellington-northern-corridor/mackays-to-peka-peka/ 
Expressway 
Northern 
375.7 
www.nzta.govt.nz/projects/sh1-northern-gateway-toll-road-ngtr/ 
Gateway 
Ruby Bay 
30 
www.nzta.govt.nz/projects/ruby-bay-bypass/ 
Bypass 
Takitimu Drive 

Takitimu Drive was a local roading project later designated as a state highway. As such, 
the Transport Agency does not hold the cost information for this project. 
www.tauranga.govt.nz/Portals/0/data/council/annual_reports/2016/files/route_k_tolls.pdf 


Project 
Cost 
Further information 
($m) 
Tauranga 
342 
www.nzta.govt.nz/projects/tauranga-eastern-link/ 
Eastern Link 
Waikato 

The Waikato Expressway is made up of seven separate projects (listed below) 
Expressway 
 
- Longswamp 

Under construction, see www.nzta.govt.nz/projects/waikato-expressway/longswamp/ 
- Rangiriri 
131 
www.nzta.govt.nz/projects/waikato-expressway/rangiriri/ 
- Huntly 
384 
www.nzta.govt.nz/projects/waikato-expressway/huntly/ 
- Ngāruawāhia 
160 
www.nzta.govt.nz/projects/waikato-expressway/ngaruawahia/ 
- Te Rapa 
172 
www.nzta.govt.nz/projects/waikato-expressway/te-rapa/ 
- Hamilton 

Under construction, see www.nzta.govt.nz/projects/waikato-expressway/hamilton/ 
- Cambridge 
218 
www.nzta.govt.nz/projects/waikato-expressway/cambridge/ 
Wellington Inner 
57 
www.nzta.govt.nz/projects/sh1-inner-city-bypass/ 
City Bypass 
 
Waka Kotahi NZ Transport Agency does not record maintenance and operation costs for individual 
sections of state highway, including those sections created through a project. This part of your request is 
therefore refused under section 18(e) as the information does not exist or, despite reasonable efforts to 
locate it, cannot be found. 
 
The following table provides a list of other new state highways constructed since 2008: 
State Highway  
Project 
Completed 
SH2 
Mangatawhiri Realignment 
October 2008 
SH17  
Puhoi to Silverdale 
January 2009 
SH3 
Bell Block Bypass 
April 2010 
SH1 
Ohingaiti to Makohine Realignment 
November 2010 
SH18A  
Upper harbour Drive between Albany and 
Opened 2010 
Greenhithe Bridge 
SH20 
Southern Motorway to Puhinui Road 
March 2011 
SH36 
Pyes Pa Bypass 
June 2011 
SH88 
Ravensbourne Road Dunedin City 
July 2011 
SH16 / SH18 
Hobsonville Motorway extension 
August 2011 
SH1 
Kamo Bypass Stage 2 
September 2011 
SH25 
Kopu Bridge replacement 
December 2011 
SH1 
Te Rapa Bypass with Limmer Road link 
December 2012 
SH76 
Christchurch Southern Motorway Stage 1 
December 2013 
SH1 
Ngaruawahia Bypass 
December 2013 
SH2 
Papatawa north of Woodville 
January 2014 
SH2 
Arden Cottage Curves, Athenree Gorge 
June 2014 
SH1 
Cambridge Bypass with Tamahere 
December 2015 
Realignment 
SH3 
Normanby Overbridge Realignment 
January 2017 
SH20 
Waterview Connection 
March 2017 
SH1 
Rangiriri Bypass 
June 2017 
SH1 
Western Belfast Bypass 
November 2017 
Please note, the projects in the above list are state highways built on new routes. 
 
 



Under section 28 of the Act, you have the right to ask the Ombudsman to review my decision to refuse part 
of this request. The contact details for the Ombudsman can be located at www.ombudsman.parliament.nz. 
 
If you would like to discuss this reply with the NZ Transport Agency, please contact Rob Goossens, 
Enterprise Asset Management Project Manager, by email to [email address] or by phone on 
(04) 894 5228. 
 
 
Yours sincerely 
 
 
Vanessa Browne 
Senior Manager – Operational Policy, Planning and Performance