Application No: S335-002 
Consent No: 202925  
Cnr North Road and Pr  
ice Street 
(Private Ba  g 90116) 
In  vercargill  
Telephone (03)   
211 5115 
Fax No. (03)   211 5252 
Southland Freephone No. 0800 76 88 45 
 
 
 
 
 
 

 Discharge Permit  
 
Pursuant to Section 104B of the Resource Management Act 1991, a resource consent is hereby 
granted by the Southland Regional Council to South Pacific Meats Ltd (the “consent holder”) 
of  P O Box 1774, Invercargill from 4 July 2005. 
 
 
Please read this Consent carefully, and ensure that any staff or 
contractors carrying out activities under this Consent on your behalf 
are aware of all the conditions of the Consent. 
 
 
 
Details of Permit 
 
Purpose for which permit is granted: 
To discharge contaminants to the air from a rendering plant, 
wastewater treatment plant, boiler and associated processes. 
 
Location 
- site locality - 
Bluff Highway, Awarua, near Colyer Road 
 
- map reference -  
E47:551-028 
 
- receiving environment -  
Air 
 
Legal description of land at the site: 
Lot 1 DP 338583 CT 158860 Sld Registry 
 
Expiry date:   
30 June 2035 
 
 
Consent Amended 
Conditions amended on 28 May 2008 as follows:  
 
Schedule of Conditions 
 
1. 
This resource consent:  
 
(a)  shall expire on 30 June 2035; and 
(b)  shall lapse if not given effect by 30 June 2010. 
 
 
 
 
 
Awarua Discharge permit 
Environment Southland is the brand name of 
202925 after amendment June 
the Southland Regional Council 
08 
 

Application No: S335-002 
Consent No: 202925  
(Note: Pursuant to Sections 123 and 124 of the Resource Management Act 1991, a new consent wil  be 
required at the expiration of this consent. The application wil  be considered in accordance with the plans in 
ef ect at that time, and the adverse ef ects of the proposed activity). 
 
2.   The discharge shall only be contaminants from a rendering plant processing up to 5,000 kg 
of raw material per hour, collection and treatment of wastewater from rendering and meat 
processing  and  dairy  processing,  a  coal-fired  boiler  having  a  net  heat  output  of  up  to  4 
megawatts,  and  associated  processes  as  described  in  the  application  for  consent.    These 
associated processes include the combustion of wastewater treatment gases in either a flare 
or boiler.   
 
3.    (a)  Only fresh raw material, or material appropriately stabilised in a fresh condition, shall 
be processed in the rendering plant. 
  (b)  Raw material for rendering shall not be held on-site for more than 24 hours. 
 
(c)  No fish waste or fish by-products shall be processed in the rendering plant. 
 
4.    The air within the rendering plant building shall be maintained at negative pressure at all 
times  during  processing  such  that  all  ventilation  air  is  discharged  via  a  bio-filter,  as 
described in the application. 
 
5.    The  bio-filter  shall  be  capable  of  treating  at  least  10  air  changes  per  hour  from  the 
rendering  plant,  shall  have  a  media  bed  depth  of  at  least  1.2  m  and  shall  have  a  design 
loading  of  at  least  80  m3  air/m2  filter  surface  area/hour.    Design  plans  for  the  bio-filter 
shall be provided to the Southland Regional Council’s Compliance Manager for approval, 
prior to construction.   
 
6.   Processing  areas,  collection  sumps  and  traps  serving  the  meat  processing  plant  and 
rendering plant shall be cleaned at least daily to minimise odour emissions. 
  7.    A gas-tight cover shall be fitted to the anaerobic lagoon such that all gases are discharged to 
either the boiler or the flare for combustion.  The cover shall be maintained at all times to 
ensure that no gas leakage occurs.  
 
8.    The maximum coal burning rate boiler shall not exceed 1280 kilograms of coal per hour. 
 
9.    The opacity of emissions from the chimney stack of the coal-fired boiler shall not be darker 
than Ringelmann Shade 1 as described in New Zealand Standard 5201:1973 except: 
 
(a)  in the case of a cold start, for a period not exceeding 30 minutes in the first hour of 
operation; and 
 
(b)  for  a  period  not  exceeding  a  total  of  four  minutes  in  each  succeeding  hour  of 
operation. 
 
10.  (a)  The discharge into air from the boiler shall occur via a stack at a height of at least 20 
metres  above  ground  level  and  at  least  12  metres  above  the  roof  ridgeline  of  any 
adjacent building. 
 
 
 
 
 
Awarua Discharge permit 
 
202925 after amendment June 
Environment Southland is the brand name of 
08 
the Southland Regional Council 
 

Application No: S335-002 
Consent No: 202925  
 
(b)  The  discharge  shall  be  directed  vertically  into  air  and  shall  not  be  impeded  by  any 
obstruction above the stack which decreases the vertical efflux velocity. 
 
11.    The  discharge  of  sulphur  dioxide  shall  not  exceed  a  rate  of  12  kilograms  per  hour.  The 
discharge rate may be determined from the maximum burning rate and sulphur content of 
the coal.  The consent holder shall provide records of the coal type burned in the boiler, 
including calorific value and maximum sulphur content, and calculation of the maximum 
sulphur dioxide emission rate based on that information.  These records shall be provided 
to the Southland Regional Council’s Compliance Manager at the time of any change to the 
coal type burned in the boiler, and otherwise at least once every 12 months. 
 
12.    (a)  The concentration of particulate matter in combustion gas discharged from the coal-
fired boiler chimney stack shall not exceed 250 milligrams per cubic metre adjusted to 
0 degrees Celsius, dry gas basis, 101.3 kilopascals, and 8 percent oxygen or 12 percent 
carbon dioxide.   
 
(b)  Any  measurement  to  confirm  compliance  with  the  particulate  concentration  limit 
shall  occur  when  the  tested  boiler  is  operating  at  greater  than  75  percent  of  the 
maximum continuous rating.  The method of sampling and analysis shall comply with 
ISO  9096:1992(E),  and  may  include  methods  BS  6069:  1992,  ASTM  D3685-78, 
ASTM D3685M-92, AS 4323.2-1995, US EPA Method 5, US EPA Method 17 or an 
equivalent method that complies with the fundamental sampling requirements of ISO 
9096:1992(E).   
 
(c)  the  consent  holder  shall  measure  the  emissions  of  particulate  matter  in  the 
combustion gas discharged from the coal-fired boiler chimney stack: 
 
(i) 
once within three to six months of commissioning of the boiler; 
(ii)  at two yearly intervals thereafter.  After at least two tests the frequency of this 
testing  may  be  reduced  with  the  written  approval  of  the  Southland  Regional 
Council’s Compliance Manager. 
 
(d)   The results of the combustion gas measurements shall be reported to the Southland 
Regional  Council’s  Compliance Manager within 20 working days of each test being 
completed. 
 
13.    The boiler stack shall be fitted with a source emission test port and safe access for testing, 
to the satisfaction of the Southland Regional Council’s Compliance Manager. 
 
14.    The coal-fired boiler shall be serviced at least once every year, by a person competent in the 
servicing  of  such  appliances.    This  servicing  shall  include:  ash  removal;  adjustment  if 
necessary of the fuel to air ratio to ensure compliance with condition (9); and measurement 
of  the  percentage  of  carbon  monoxide,  carbon  dioxide  and  oxygen  in  the  flue  gases 
discharged.  Service reports shall be prepared and retained, and copies shall be provided to 
the Southland Regional Council’s Compliance Manager on request. 
 
15.   The  flare  shall  be  operated  in  accordance  with  the  specifications  described  in  the 
application.    The  flare  shall  be  fitted  with  a  continuous  ignition  system  including  spark 
igniter and back-up power supply and shall be operated to achieve a minimum combustion 
efficiency of 98%. 
 
 
 
 
 
Awarua Discharge permit 
 
202925 after amendment June 
Environment Southland is the brand name of 
08 
the Southland Regional Council 
 

Application No: S335-002 
Consent No: 202925  
16.   The  total  biochemical  oxygen  demand  (BOD)  load  of  wastewater  entering  the  treatment 
plant for treatment shall not exceed 7,500kg/day. 
 
17.   The aerated pond shall be operated to maintain aerobic conditions at all times and minimise 
odour  generation.    Electrically powered floating aerators having a total output of at least 
180  kilowatts  shall  be  installed  and  shall  be  operated  as  required  to  comply  with  this 
condition. 
 
18.   (a)   All sludge generated by the treatment system, including DAF float solids, that are to 
be  removed  from  the  site  shall  be  pumped  directly  to  fully  enclosed  tankers  for 
transport  to  disposal.  If  DAF  solids  are  further  processed  on-site  they  shall  be 
pumped in pipelines or otherwise transferred to processing in a manner that ensures 
there will be no odour. 
 
 
(b)   Under  no  circumstances  shall  sludge  be  handled,  transferred  or  stored  in  open  air 
such that odour may be detected beyond the site boundary. 
 
19.   The  discharge  of  anaerobic  wastewater  into  the  aerated  lagoon  shall  be  via  a  submerged 
inlet at all times, including during initial filling of the aerated lagoon with wastewater. 
 
20.  The  discharges  shall  not  cause  objectionable  or  offensive  odour  or  particulate  matter 
(including  dust  and  smoke)  to  the  extent  that  it  causes  an  adverse  effect  beyond  the 
boundary of the consent holder’s property. 
 
21.  The  consent  holder  shall  prepare  a  site  management  plan  and  submit  the  plan  to  the 
Southland  Regional  Council’s  Compliance  Manager  for  approval  no  later  than  three 
months from the completion of the commissioning of the plant.  This management plan 
shall detail all actions to be taken to minimise odour and particulate matter emissions from 
the plant and to ensure compliance with the conditions of this consent.   
 
The plan shall address: 
    (a)  bio-filter maintenance requirements; 
(b)  operating  procedures  to  minimise  odour  and  particulate  matter  emissions  from  the 
rendering plant; 
(c)  wastewater collection and treatment, including maximum holding times; and 
(d)  boiler plant maintenance. 
 
The  management  plan  shall  state  the name and contact telephone number of all persons 
responsible for each action described in the plan and shall be updated at least annually to 
include  staff  changes.    The  plan  shall  be  available  for  inspection  at  the  consent  holder’s 
property at all times. 
 
22.   The consent holder shall maintain a record of all complaints relating to odour or particulate 
matter that are either received directly or notified by the Southland Regional Council.  This 
record shall include: 
 
(a)  the location where the odour or particulate matter was detected by the complainant; 
(b)  the date and time when the odour or particulate matter was detected; 
(c)  a  description  of  the  wind  speed  and  wind  direction  when  the  odour  or  particulate 
matter was detected by the complainant; 
 
 
 
 
Awarua Discharge permit 
 
202925 after amendment June 
Environment Southland is the brand name of 
08 
the Southland Regional Council 
 

Application No: S335-002 
Consent No: 202925  
(d)  the most likely cause of the odour or particulate matter detected; and 
(e)  any corrective action undertaken by the consent holder to avoid, remedy or mitigate 
the odour or particulate matter detected by the complainant. 
 
Within  20  working  days  of  any  complaint,  the  consent  holder  shall  notify  the  Southland 
Regional Council’s Environmental Compliance Manager in writing of the response taken to 
remedy  the  cause  of  the  complaint.    The  consent  holder  shall  provide  a  copy  of  the 
complaints record to Southland Regional Council on request.   
 
23.  The  consent holder shall pay Southland Regional Council administration and monitoring 
charges, col ected in accordance with Section 36 of the Resource Management Act, payable 
in advance on the first day of July each year. 
 
24.  Southland  Regional  Council  may,  in  accordance  with  the  conditions  of  this  resource 
consent and Sections 128 and 129 of the Resource Management Act 1991, serve notice of 
its intention to review the conditions of this consent, in the period 1 February to 31 August 
each year, for the purposes of: 
 
(i) 
dealing  with  any  adverse  cumulative  effects  on  the  environment  which  may  arise 
from the exercise of this consent;  
(ii) 
complying with the requirements of a regional plan; or 
(i i)  requiring  the  consent  holder  to  adopt  the  best  practicable  option  to  address  any 
adverse odour effect. 
 
 
 
 
for the Southland Regional Council 
 
 
 
 
W J Tuckey 
Director of Environmental Management   
 
 
 
 
 
 
Awarua Discharge permit 
 
202925 after amendment June 