This is an HTML version of an attachment to the Official Information request 'Resource consents for combustion discharges'.

Application No: O075-001  
Consent No: 204663-V3  
Cnr North Road and Pr  
ice Street 
(Private Ba  g 90116) 
In  vercargill  
Telephone (03)   
211 5115 
Fax No. (03)   211 5252 
Southland Freephone No. 0800 76 88 45 
 
 
 
 
 
 

 Air Discharge Permit  
 
 
Pursuant to Section 105(1)
 of the Resource Management Act 1991, a resource consent is hereby 
granted by the Southland Regional Council to Open Country Dairy Ltd (the “consent holder”) 
of P O Box 11159, Auckland from 23 October 2007. 
 
History of Transfers 
From  Dairy  Trust  Ltd  on  8  January  2009.  (Issued  17 
December 2007). 
 
 
Please read this Consent carefully, and ensure that any staff or 
contractors carrying out activities under this Consent on your behalf 
are aware of all the conditions of the Consent. 
 
 
Details of Permit 
 
Purpose for which permit is granted: 
To  discharge  contaminants  to  the  air from a milk processing 
plant and boiler 
 
Location 
- site locality - 
Bluff Highway, Waimatua, Awarua 
 
- map reference -  
E47:547-024 
 
- receiving environment -  
Air 
 
- air shed - 
Southland 
 
Legal description of land at the site: 
Lot 9 DP 338583 
 
Expiry date:   
23 October 2027 
 
Consent Amended 
Conditions amended on 28 May 2008, 25 January 2011 and 10 
November 2015, as follows:  
 
Schedule of Conditions 
 
1. 
This resource consent shall expire on 23 October 2027. 
 
 
 
 
Discharge to Air AUTH-
Environment Southland is the brand name of 
204663-V3 
the Southland Regional Council 
 

2                                   Application No: O075-001  
Consent No: 204663-V3 
(Note: Pursuant to Sections 123 and 124 of the Resource Management Act 1991, a new consent wil  be 
required at the expiration of this consent. The application wil  be considered in accordance with the plans in 
ef ect at that time, and the adverse ef ects of the proposed activity). 
 
2. 
The  discharge  shall  be  only  combustion  products  from  a  coal-fired  boiler  having  a  net 
energy output capacity of up to 30 megawatts, a milk powder drying plant and associated 
processes as described in the application for consent. 
 
3.   There shall be no discharge of odour or particulate matter from the coal-fired boiler, the 
milk  processing  plant  or  any  associated  activity  that is offensive or objectionable beyond 
the boundary of the property on which the consent is exercised. 
 
4.   The processes resulting in discharges to air shall be operated and maintained using either 
the emission control mechanisms as described in the application, or using processes which 
provide  at  least  an  equivalent  level  of  emission  control.    Details  of  any  changes  shall  be 
included in the Annual Environmental Report to the Southland Regional Council required 
under condition 19. 
 
5. 
Differential pressure sensors shall be installed to electronically monitor differential pressure 
across  all  bag  filters,  and  the  differential  pressure  shall  be  continuously  displayed  in  the 
respective control rooms.  Any change in differential pressure that may indicate bag filter 
failure  or  malfunction  shall  be  investigated  immediately  and  resulting  corrective  actions 
shall be recorded in the Annual Environment Report required under condition 19. 
 
Coal-Fired Boiler Plant and Associated Facilities 

 6.  (a)   The maximum coal burning rate shall be at an equivalent gross energy input of 150 
gigajoules per hour. 
 
 
(b)   The maximum gross energy input to the boiler plant during any 24-hour period shall 
not exceed 3,000 gigajoules. 
 
 
(c)   The steam production rate shall be automatically measured and recorded at all times 
during  boiler  operation.    The  gross  energy  input  to  the  boiler  plant  shall be 
calculated based  on  the  measured  steam  production  rate  and  the  method  of 
calculation, taking into account boiler efficiency, shall be provided in writing to the 
Southland Regional Council.  Records of steam output and gross energy input shall 
be provided to the Southland Regional Council in accordance with conditions 16 and 
19. 
 
7. 
Combustion gases from the boiler plant shall be discharged to air via bag filters or via other 
emission control equipment as necessary to comply with condition 10. 
 
8. 
(a)   The discharge to air from the boiler plant shall occur via a stack at a height of at least 
52 metres above local ground level.  The minimum efflux velocity of exhaust air from 
the  stack  shall  be  24  metres  per  second  at  the  maximum  continuous  rating  of  the 
boiler. 
 
 
(b)   The discharge to air shall occur at a height at least 21 metres above the roof ridgeline 
of all buildings on the consent holder’s property. 
 
 
 
 
 
Discharge to Air AUTH-
 
204663-V3 
Environment Southland is the brand name of 
the Southland Regional Council 
 

3                                   Application No: O075-001  
Consent No: 204663-V3 
 
(c)   The  discharge  shall  be  directed  vertically  into  air  and  shall  not  be  impeded  by  any 
obstruction  above  the  stack  that  decreases  the  vertical  efflux  velocity  below  that 
which would occur in the absence of such obstruction.   
 
9. 
The  opacity  of  emissions  from  the  chimney  stack  shall  not  be  darker  than  Ringelmann 
Shade 1 as described in New Zealand Standard 5201:1973 except:  
(a)   in the case of a cold start for a period not exceeding 30 minutes in the first hour of 
operation; 
 
(b)   for  a  period  not  exceeding  a  total  of  two  minutes  in  each  succeeding  hour  of 
operation. 
 
10.  The  discharge  of  total  suspended  particulate  matter  in  combustion  gases  to  air  from  the 
boiler stack shall not:  
 
(a)   exceed a concentration of total suspended particulate matter, unless the bag filter (or 
other equipment providing an equivalent degree of emission control) is being lawfully 
bypassed  in  accordance  with  Condition  10(b),  of  25  milligrams  per  cubic  metre 
corrected to 0 degrees Celsius, 101.3 kilopascals, and adjusted to 12 percent carbon 
dioxide by volume on a dry gas basis.  The mass emission rate shall not exceed 1.3 
kilograms per hour; 
 
(b)   exceed  a  concentration  of  total  suspended  particulate  matter  of  500  milligrams  per 
cubic  metre  corrected  to  0  degrees  Celsius,  101.3  kilopascals,  and  adjusted  to  12 
percent  carbon  dioxide  by  volume  on  a  dry  gas  basis  when  the  bag  filter  (or  other 
equipment  providing  an  equivalent  degree  of  emission  control)  bypass  is  being 
operated under the following circumstances for the shortest time practicable:  
 
(i)   in the event of flue gas temperatures sufficiently high to damage filter bags or 
other control equipment but only after boiler fuelling is stopped;  
(ii)   drying out green refractory during commissioning of the boiler following repairs 
to boiler refractory, and during subsequent re-bricking, and only up to five days 
from commencing drying out;  
(iii)   during commissioning of the boiler if it is essential to bypass the bag filter or 
other control equipment; and   
(vi)   in the event of bag filter or other control equipment malfunction providing the 
bypass shall not occur for more than eight hours at any time. 
 
The dates and times the bag filter or other control equipment is bypassed, and the 
reasons  for  bypassing,  shall  be  recorded,  and  records  shall  be  retained  and  made 
available  to  the  Southland  Regional  Council  on  request,  and  shall be included as a 
part of the Annual Environmental Report required under condition 19. 
 
11. 
(a)  The  maximum  sulphur  dioxide  emission  rate  shall  not  exceed  128  kilograms  in 
any one hour or 2.5 tonnes in a 24-hour period. 
The emission rate maybe calculated from the coal combustion rate, sulphur content 
of the coal and include an ash retention allowance of 20%; or by measurement in the 
stack gases and calculated from the stack gas flow rate. 
 
 
 
 
Discharge to Air AUTH-
 
204663-V3 
Environment Southland is the brand name of 
the Southland Regional Council 
 

4                                   Application No: O075-001  
Consent No: 204663-V3 
 
(b)   An  electronic  daily  trend  record  shall  be  maintained  of  sulphur  dioxide  emissions. 
Daily trend calculations for sulphur dioxide shall be based on the consumption rate of 
the coal blend (calculated from the measured steam production rate) and the calorific 
value  and  sulphur  content  of  that  coal  blend  determined  according  to  Condition 
11(c), allowing for a maximum 20 percent sulphur retention in the ash.   
 
 
 
The  electronic  daily  trend  data  record  for  each  month  shall  be  reported  to  the 
Consent Authority by the 10th day of the following month. The record submitted to 
the  Consent  Authority  shall contain all  daily  trend data records  for sulphur dioxide 
for the preceding four week period. 
 
(c)   Analysis  of  coal  to  be  burned  in  the  boiler  shall  be  undertaken  at  least  once  every 
month, providing the coal source or blend remains constant.  If the coal source or 
blend  changes  then a representative analysis of the sulphur content shall be carried 
out as soon as practicable and within not less than five working days of beginning to 
burn  the  new  coal.  Each  single  sample  to  be  analysed  for  coal  sulphur  shall  be 
generated  from sub-samples that are randomly selected from supplied coal or from 
coal  that  is  stored  on-site  as  the  case  may  be.  All  coal  samples  required  under  this 
consent shall be analysed as soon as practicable for combustible sulphur as percent by 
weight of coal and gross calorific value as megajoules per kilogram of coal, on an as 
received basis, by a laboratory accredited by IANZ for these analyses.  Monthly coal 
sulphur content data shall be provided to the Consent Authority by the 10th day of 
the following month. 
 
12.  (a)   The concentration of: 
 
 
 
(i)  Total  suspended  particulate  matter  in  combustion  gas  in  the  boiler  stack  or  the 
duct  into  the  boiler  stack  shall  be  measured  within  three  months  of  the 
commencement of operation of the second boiler and at least once every 12 months.   
 
 
 
 
 
(ii) Sulphur dioxide in combustion gas in the boiler stack or the duct into the boiler 
stack shall be measured within three months of the commencement of operation of 
the second boiler and at least once every six (6) months. 
 
 
 
Measurement of the discharge from the boiler shall occur when the boiler is operating 
at  a  rate  of  at  least  60  percent  of  the  maximum  continuous  rating.  Testing,  and 
analysis  of  samples  as appropriate, shall be carried out by an organisation and by a 
laboratory  accredited  by  International  Accreditation  New  Zealand  (IANZ)  for  the 
tests and analyses involved.  
 
(b)   The consent holder shall install sampling ports in the boiler stack or the duct into the 
boiler stack as appropriate in accordance with Australian Standard AS4323.1-1995 or 
equivalent  method  for  the  provision  and  location  of  sampling  ports,  services, 
platforms and access as well as provision of single phase electrical supply.  
 
(c)   The  method  of  sampling  and  analysis  for total particulate matter shall comply with 
US  Environmental  Protection  Agency  (USEPA)  Methods  5  or  Method  17,  or  ISO 
9096:2003,  ASTM  D3685-98,  or  equivalent  method  to  the  satisfaction  of  the 
Southland Regional Council. The testing time for each particulate sample shall be two 
hours  continuous,  and  at  least  three  samples  shall  be  collected.  Results  shall  be 
 
 
 
 
Discharge to Air AUTH-
 
204663-V3 
Environment Southland is the brand name of 
the Southland Regional Council 
 

5                                   Application No: O075-001  
Consent No: 204663-V3 
adjusted to zero degrees Celsius, 101.3 kilopascals, and 12 percent carbon dioxide on 
a dry gas basis, and as a mass emission expressed as kilograms per hour.  
 
(d)   The method of sampling and analysis for sulphur dioxide shall be USEPA Method 6, 
6A,  or  6C,  or  an  equivalent  method  to  the  satisfaction  of  the  Southland  Regional 
Council.  The  testing  time  for  each  sulphur  dioxide  sample  shall  be  one  hour 
continuous and at least three samples shall be collected. Results shall be adjusted to 
zero  degrees  Celsius,  101.3 kilopascals, and 12 percent carbon dioxide on a dry gas 
basis, and as a mass emission expressed as kilograms per hour.  
 
(e)  Volumetric flow of combustion gas, and gas temperature, during each particulate and 
sulphur dioxide emission test shall be determined and recorded and results presented 
as a part of the particulate emission test report.  
 
(f)   The  oxygen  or  carbon  dioxide  concentration  in  combustion  gases  shall  be 
continuously  monitored  and  recorded  during  each  particulate  and  sulphur  dioxide 
emission test and results shall be presented as a part of the particulate emission test 
report.  
 
(g)   The following operating parameters of the boiler during each particulate and sulphur 
dioxide  emission  test  shall  be  obtained  and  included  in  the  testing  report:  furnace 
temperature,  furnace  back-end  oxygen  concentration  (wet  gas  or  dry  gas  basis 
identified), rate of firing (coal consumption per unit time and steaming rate) and any 
abnormal operation during the testing period. 
 
The  results  of  emissions  tests  and  other  information  and  a  description  of  the  testing 
methods used shall be provided to the Southland Regional Council within 20 working days 
following receipt by the consent holder of the testing report. A summary of the results and 
other  information  shall  also  be  included  in  the  Annual  Environmental  Report  required 
under condition 19. 
 
13.  The coal-fired boiler shall be serviced at least once every year by a person competent in the 
servicing of such boilers. This servicing shall include internal cleaning and replacement or 
repair of damaged equipment and services as necessary, adjustment of the air to fuel ratio 
to  optimise  energy  efficiency  and  to  minimise  the  emission  of  products  of  incomplete 
combustion;  and  calibration  and  adjustment  of  boiler  monitoring  equipment  consistent 
with  the  intent  of  this  consent.  Servicing  reports  shall  be  prepared  and  copies  shall  be 
provided  to  the  Southland  Regional  Council  on  request.  Confirmation  that  this  servicing 
has been undertaken, and at least a summary of the service reports shall be reported to the 
Southland Regional Council in the Annual Environmental Report required under condition 
19. 
 
14.  An  obscuration  meter  shall  be  installed  and  operated  in  accordance  with  the  supplier’s 
instructions  to  provide  continuous  measurement  and  recording  of  obscuration  of  the 
discharge.  The meter shall be maintained and calibrated by a competent person such that a 
reliable indication of plume opacity is achieved at all times.  Boiler operators shall take into 
account obscuration meter readings when determining ongoing compliance with condition 
(9).  A record of obscuration measurements shall be held on site and shall be provided to 
the Southland Regional Council on request. 
 
 
 
 
 
Discharge to Air AUTH-
 
204663-V3 
Environment Southland is the brand name of 
the Southland Regional Council 
 

6                                   Application No: O075-001  
Consent No: 204663-V3 
15.  Fugitive  dust  from  the  coal  delivered,  stored  and  used  on  site  shall  be  minimised  by  all 
practicable  means,  which  shall  include  unloading  coal  within  an  appropriately  enclosed 
facility and storage of coal in an enclosed environment.   
 
16.  The tonnage of coal burned per month, and the average and maximum one hour and 24-
hour coal consumption and gross energy input rates, shall be calculated each month based 
on recorded steam production rates. This information shall be summarised in the Annual 
Environmental Report required under condition 19. 
 
Milk Powder Plant 
 
17.  (a)   Discharges  to  air  from  the  milk  powder  drier  stack  shall  be  via  cyclones  and  bag 
filters through stacks discharging vertically without impediment with minimum height 
above  ground  level  (including  building  height)  of  41  metres,  with  the  actual  stack 
height being no less than 10 metres above the roof ridgeline of all buildings on the 
consent  holder’s  property.    The  minimum  efflux  velocity  of  exhaust  air  from  each 
drier stack shall be 15 metres per second at the maximum continuous rating of the 
drier. The concentration of total suspended particulate in each drier stack exhaust air 
shall not exceed 12 milligrams per cubic metre corrected to 0 degrees Celsius, 101.3 
kilopascals, on a dry gas basis.  The combined emission rate of suspended particulate 
matter from the drier stack shall not exceed 2.7 kilograms per hour. 
 
(b)  The consent holder shall install sampling port(s) in the drier stack in accordance with 
Australian  Standard  AS4323.1-1995  or  equivalent  method  for  the  provision  and 
location  of  sampling  ports,  services,  platforms  and  access  as  well  as  provision  of 
single phase electrical supply. 
 
(c)  The  concentration  and  emission  rate  of  total  suspended  particulate  matter  in  each 
drier  stack  exhaust  air  shall  be  measured  within  four  months  after  completing 
commissioning  of  the  second  powder  plant  and  at  least  every  twelve  months  to 
confirm compliance with condition 16(a). Measurement of the discharge from each 
stack shall occur when the associated powder plant is operating at least 75 percent of 
its maximum continuous rating. Testing, and analysis of samples as appropriate, shall 
be  carried  out  by  an  organisation  and  by  a  laboratory  accredited  by  IANZ  for  the 
tests and analyses involved.  
 
(d)  The  method  of  sampling  and  analysis  for total particulate matter shall comply  with 
US  Environmental  Protection  Agency  (USEPA)  Methods  5  or  Method  17,  ISO 
9096:2003  or  ASTM  D3685-98,  or  a  similar  method  to  the  satisfaction  of  the 
Southland  Regional  Council.  The  testing  time  for  each  sample  shall  be  two  hours 
continuous, and at least three samples shall be collected. Results shall be adjusted to 
zero  degrees  Celsius,  101.3  kilopascals,  on  a  dry  gas  basis,  and  as  a  mass  emission 
from each stack expressed as kilograms per hour.  
 
(e)  The  volumetric  flow  and  temperature  in  the  drier  stack  shall  be  determined  and 
recorded and results presented as a part of the particulate emission test report.  
 
(f)  The results of emissions tests and other information and a description of the testing 
methods used shall be provided to the Southland Regional Council within 20 working 
days following receipt by the consent holder of the testing report. A summary of the 
 
 
 
 
Discharge to Air AUTH-
 
204663-V3 
Environment Southland is the brand name of 
the Southland Regional Council 
 

7                                   Application No: O075-001  
Consent No: 204663-V3 
results  and  other  information  shall  be  included  the  Annual  Environmental  Report 
required under condition 19. 
 
Reporting 
 
18.  A  record  of  all  complaints  made  to  the  consent  holder  relating  to  odour  or  particulate 
matter shall be maintained, and shall include:  
 
(a)  the location where the odour or particulate matter was detected by the complainant;  
(b)  a  description  of  the  wind  speed  and  wind  direction,  and  rainfall  if  any,  when  the 
odour or particulate matter was detected by the complainant;  
(c)  the most likely cause of the odour or particulate matter detected; and  
(d)  any corrective action undertaken by the consent holder to avoid, remedy or mitigate 
the odour or particulate matter detected by the complainant.  
 
The record of complaints shall be provided to the Southland Regional Council on request, 
and as part of the Annual Environmental Report required under condition 19. 
 
19.  The  consent  holder  shall,  no  later  than  30  September  of  each  year,  provide  an  Annual 
Environmental  Report  to  the  Southland  Regional  Council  setting  out  all  monitoring  and 
reporting  results  required  by  conditions  of  consent  and  their  interpretation  by  an 
appropriately  qualified  person,  including  emission  tests  undertaken  in  relation  to  this 
consent over the previous period.  Where the result of any test or monitoring undertaken in 
relation  to  this  consent  exceeds  the  relevant  limit  or  does  not  comply  with  the  relevant 
condition, then the steps that were taken to rectify the non-compliance shall be provided. 
 
Management & Contingency Plan 
 
20.  The  consent  holder  shall  prepare,  through  the  services  of  an  independent  appropriately 
qualified person(s), an "Air Discharge Management & Contingency Plan" (the Plan). The 
purpose of the Plan shall be to:  
 
(a)   describe  the  operation  of  the  plant  in  relation  to  its  potential  impacts  on  the  air 
environment; 
(b)   define  the  actions  to  be  taken  to  ensure  compliance  with  all  conditions  of  this 
consent,  or  in  response  to  any  incident  which  may  impact  adversely  on  the 
environment;  
(c)   describe how representative samples of coal will be taken to give a composite sample 
for analysis; and  
(d)   present contingency plans in the event of mechanical or electrical or other problems 
that  provide  for  continuing  operation  of processes and/or timely shutting down of 
processes as the case may be, to ensure conditions of this consent are not breached.  
 
The  Plan  shall  include  details  of  the  steps  to  be  taken  to  correct  any  non-compliances 
identified.  The  plan  shall  be  provided  to  the  Southland  Regional  Council  within  three 
months of the commencement of this consent. The Plan should be reviewed at least on an 
annual basis and it may be amended at any time during the period  of this consent as the 
independent  qualified  person(s)  considers  appropriate  to  improve  management  and 
contingency procedures. If/when the Plan is amended, a copy of the amended version, (or 
amended sections) shall be sent to the Southland Regional Council as soon as practicable 
 
 
 
 
Discharge to Air AUTH-
 
204663-V3 
Environment Southland is the brand name of 
the Southland Regional Council 
 


8                                   Application No: O075-001  
Consent No: 204663-V3 
following  amendment.  Amendments  to  the  Plan  shall  be  referenced  in  the  Annual 
Environmental Report required under Condition 19. 
 
Review of Consent and Annual Charges 
 
21.  The Southland Regional Council may, once per year, on any of the last five working days of 
May or November each year, serve notice of its intention to review the conditions of this 
consent for the purposes of:  
 
(a)  dealing with any adverse effect on the environment which may arise from the exercise 
of the consent and which it is appropriate to deal with at a later stage; 
(b)  requiring the adoption of the best practicable option to remove or reduce any adverse 
effect on the environment;  
(c)  requiring the adoption of measures to reduce adverse effects of particulate matter or 
sulphur  dioxide  indicated  by  monitoring  in  accordance  with  conditions  of  this 
consent; and 
(d)  modifying or extending any of the monitoring requirements of this consent. 
 
22.  The  consent  holder  shall  pay  an  annual  administration  and  monitoring  charge  to  the 
Southland  Regional  Council,  collected  in  accordance  with  Section  36  of  the  Resource 
Management Act 1991. 
 
 
 
for the Southland Regional Council 
 
 
 
 
Michael Durand 
Acting Consents Manager 
 
 
 
 
 
 
 
Discharge to Air AUTH-
 
204663-V3 
Environment Southland is the brand name of 
the Southland Regional Council