This is an HTML version of an attachment to the Official Information request 'Flood Investigations and Assessments Wolverton Rd /Clark St'.

 
31 January 2019 
To 
 
 
Copy to 
 
From 
 
 
 
Subject 
Wolverton Street Culverts - Design Flow Assessment 
 
 
 
Background 
A Wolverton Culverts Hydraulic Peer Review meeting was held at Auckland Transport offices on 
Wednesday 23rd January 2019.  The current design methodology for the two Wolverton Street Culvert 
Upgrade Projects was discussed at this meeting, with particular emphasis on the peer review findings 
undertaken by GHD.  These findings are outlined in the January 2019 GHD report titled “Wolverton 
Culverts 1 and 2 - Peer Review of Design Flows”. 
At this meeting it was confirmed that the current design flows are based on the Auckland Council Unitary 
Plan zonings which retain the existing Maungakiekie and Titirangi Golf Courses land uses.  Given the 
critical nature of both Wolverton Street culvert sites it was agreed that the possibility of these large 
greenfield areas being converted into residential housing should also be considered as part of the design 
flow assessment.  This memo updates the culvert design flows taking into account this possibility. 
Design Flow Assessment 
Design flows at both Wolverton Culvert sites have previously been calculated by Auckland Council (refer 
to memo dated 23rd November 2018) using the following three methods: 
1.  TP108 hand calculations incorporating Unitary Plan land zoning and Climate Change rainfall 
2.  Rapid Flood Hazard Mapping (RFHM) model incorporating a 70% uniform imperviousness and 
peak TP108 rainfall (adjusted for Climate Change) 
3.  Detailed catchment framework model (ICM) incorporating Unitary Plan land zoning, 24 hour 
TP108 rainfall profile (adjusted for Climate Change), 10 percentile MHWS tidal level plus              
1.0 metre sea level rise and upstream constraining culverts removed. 
In addition to this work, TP108 hand calculations have also been calculated by GHD for the Unitary Plan 
land zoning plus the residential infil ing of the Maungakiekie and Titirangi Golf Courses.  For these 
calculations the following assumptions were made: 
•  The entire 41.69 hectare site of the Maungakiekie Golf Course site is converted to housing with 
an assumed average 70% impervious surface coverage 
•  80% of the 61.29 hectare site of the Titirangi Golf Course site is converted to housing with an 
assumed average 70% impervious surface coverage (the remaining 20% of the site is currently 
covered in native bush which is unlikely to be developed). 
12505938///Wolverton Street Culverts Design Flow 
 
Assessment   

 
The results of these various calculation methods are summarised in Table 1 and 2 respectively for 
Wolverton Culvert Sites No. 1 and No. 2. 
Table 1: Design Peak Flows – Wolverton Culvert Site No. 1  
Peak Design Flow (m3/s) 
ARI Storm 
TP108 Calculations 
Detailed 
Event 
RFHM Model 
Framework 
Supplied to 
Model 
AT (23/11/18) 
Unitary Plan 
Unitary Plan 
+ GC Dev 
Catchment 
Imperviousness 
61% 
66% 
70% 
61% 

10 Year + CC 
54 
56 

57 
57 
50 Year + CC 
77 
79 

79 
79 
100 Year + CC 
86 
88 
87 
89 
89 
Table 2: Design Peak Flows – Wolverton Culvert Site No. 2  
Peak Design Flow (m3/s) 
ARI Storm 
TP108 Calculations 
Detailed 
Event 
RFHM Model 
Framework 
Supplied to 
Model 
AT (23/11/18) 
Unitary Plan 
Unitary Plan 
+ GC Dev 
Catchment 
Imperviousness 
57% 
63% 
70% 
57% 

10 Year + CC 
48 
50 

44 
48 
50 Year + CC 
70 
72 

61 
68 
100 Year + CC 
78 
80 
75 
68 
75 
As discussed at the 23rd January 2019 meeting, the critical design storm is the 2500 year ARI storm 
event, with the 10 to 100 year ARI flows primarily being used to al ow extrapolation of these higher flows.  
The design flows supplied to AT are stil  considered acceptable for culvert design for Auckland Council’s 
flood protection Level of Service for upstream property floor levels.  However, a sensitivity check should 
be undertaken to assess the impact of possible future residential infil  development within the 
Maungakiekie and Titirangi Golf Courses.   
Time constraints prevent rerunning the detailed framework model for this alternative development 
scenario.  Instead, the impact of infil  development within the golf course sites can roughly be assessed 
by increasing the supplied design flows by the same factor (2 m3/s) as derived in the TP108 hand 
calculations.  Based on this, the recommended peak flows to be applied for a sensitivity check of 
possible golf course infil  development are summarised in Table 3 for the Wolverton Culvert Sites No. 1 
and No. 2.   
Table 3: Recommended Peak Flows to be Adopted for a Sensitivity Check  
ARI Storm 
Sensitivity Check Peak Flow (m3/s) 
Event 
Wolverton Culvert Site No. 1 
Wolverton Culvert Site No. 2 
10 Year + CC 
59 
50 
50 Year + CC 
81 
70 
100 Year + CC 
91 
77 
 
12505938///Wolverton Street Culverts Design Flow Assessment   


 
Regards 
 
Technical Lead - Hydraulic Modelling 