Local Government Official Information and Meetings Act 1987 (LGOIMA) 
CAS-965536-W7L7S6 – AMETI Project 
We refer to your request for official information dated Friday 25 January 2019 regarding the Pakuranga Road T2 
lane. 
1.
Has Auckland Transport completed a vehicle occupancy study of Pakuranga Road?
Traffic modelling was undertaken as part of this project.
2.
If so, can I please have all information and results relating to this study?
We have provided the following documentation:

EB1 TDM Update Paper May 2018 v2 (003)

AMETI EB1 June 2018 PCG TDM

AMETI EB1 Traffic Demand Management Approvals- Approved

AMETI TDM Business Case

Annexure 1 – Traffic Modelling Assessment Results

Annexure 2 – Scheme Transit Lane (T2)
3.
What information and briefings relating to this Transit Lane have been provided to the Howick Local
Board and Howick Ward Councillors?

The Howick Local Board was provided with a formal presentation outlining our initial ideas and measures to
mitigate the traffic impact of construction in June 2018. This included the concept of the Park and Ride facility
at Lloyd Elsmore Park, temporary bus lanes on Pakuranga Road and other potential travel demand
management measures.
A complete update of the proposed T2 / Bus lane and Park and Ride measures to the Howick Local Board was
always planned for February 2019.
Howick Ward Councillors and the Howick Local Board Chair have been provided with regular updates and
briefings over the past 12 months. These updates were provided as part of the AMETI Eastern Busway Key
Stakeholder Forum.
Auckland Transport also provided the proposed suite of measures to Howick Ward Councillors and the local
Member of Parliament during a private meeting held in December 2018 along with details of traffic modelling
undertaken.
We have provided the following presentations for your reference:

Howick Board Meeting Presentation 23 05 18

AMETI KSHF (Key Stakeholder Forum) Presentation June 2018

TDM Updated Dec 2018 (presentation giving at private meeting with Howick Ward Councillors and local of
Member of Parliament.

Key Stakeholder Forum Presentation Feb 2019


4.
Is there a final design document for this transit lane that shows when\where it will operate?
We have provided a draft design; the final design is currently going through a pre-construction Road Safety Audit 
(RAS). We expect the RSA to be completed mid-late March 2019.  
If you would like a copy of the final design once we have completed the RSA please let us know and we will 
provide this once ready. 
Some sections of the provided documentation have been either redacted or withheld. These are being withheld 
under: 
-
Section  7(2)(a)  of  the  Act,  as  withholding  the  information  is  necessary  to  protect  the  privacy  of  natural
persons, including that of deceased natural persons
We have provided the information outlined above in a zipped file available for direct download from the following 
link: Link to LGOIMA Sharing Site. The file size is a little under 5 MB. 
For any more information on this project please contact the project team via [email address] 
We  trust  the  above  information  has  addressed  the  matters  raised  however,  should  you  believe  that  we  have  not 
responded appropriately to your request, you have the right in accordance with section 27 (3) of the LGOIMA to make 
a complaint to the Office of the Ombudsman to seek an investigation and review regarding this matter. 
Yours sincerely 
David Nelson 
Group Manager, Major Projects 
Integrated Networks 

Incl: 

EB1 TDM Update Paper May 2018

AMETI EB1 June 2018 PCG TDM

26.11.2018 TDM (Travel Demand Management) Memo for Approval

AMETI EB1 Traffic Demand Management Approvals- Approved

AMETI TDM Business Case

Annexure 1 – Traffic Modelling Assessment Results

Annexure 2 – Scheme Transit Lane (T2)

Annexure 3 - Park and Ride Layout

AMETI KSHF (Key Stakeholder Forum) Presentation June 2018

Howick Board Meeting Presentation 23 05 18

TDM Updated Dec 2018

Key Stakeholder Forum Presentation Feb 2019

Draft Design Plans
Page 2 of 2