This is an HTML version of an attachment to the Official Information request 'Supporting information for Determination 2018/055 (warehouse racking)'.




 
National Headquarters 
Level 12 
80 The Terrace  
 
PO Box 2133 
Wellington 
New Zealand 
s 9(2)(a)
 
 
10/09/2018 
Ginny Carter 
Administrator, Determinations 
Ministry of Business, Innovation and Employment 
PO Box 1473 
WELLINGTON 6140 
 
By email: [email address] 
 
Copies to: 
Malcolm Gray   
 
 
 
The Building Manager 
Forbes and Davies Limited 
 
 
Selwyn District Council 
s 9(2)(a)
 
 
 
PO Box 90 
 
 
 
ROLLESTON 7643 
By email:  [email address] 
By email:  [email address]   
 
Dear Ginny 
Draft determination 3023 
Regarding the compliance of a warehouse fitout, comprising storage racking and a mezzanine 
floor, with the fire safety requirements of the building code at 49 Stoneleigh Drive, Rolleston 

Thank you for providing Fire and Emergency New Zealand (Fire and Emergency) with the 
opportunity to review and comment on draft determination 3023. 
Fire and Emergency accepts the draft determination.  A copy of the formal response form is 
attached accordingly.  I note that the current heading to the draft determination refers to the site 
address as ’49 Rolleston Drive’, which appears to be a typographic error. 
Please contact me if you require any further information from Fire and Emergency in relation to 
this matter.  I can be reached on 04 462 4947 or [email address]. 
Yours sincerely, 
 
 
Ashley Cornor 
Senior Counsel 
 











 
 




 
 
 
 
Stephen Lambert 
 
NZFS Engineering Unit 
National Headquarters 
PO Box 2133 
Wellington 6140 
 
New Zealand 
 
[email address] 
 
s 9(2)(a)
 
 
 
 
 
Carol Caldwell 
Enlightened Solutions 
PO Box 8709 
Christchurch 8440 
 
19 May 2017 
 
Dear Carol, 
 
Re: 
New Platform in Existing Warehouse, 49 Stoneleigh Drive, Rolleston 
(NZFS Reference: 9571 - Rev 03) 
Thank you for the additional information concerning the above project. The NZFS understands that 
the project involves the construction of a new storage platform (33.5m by 13.5m at a height of 2.4m 
in an existing building of area 958m2: this represents 50.2% of the warehouse area and 47.2% of the 
total building’s footprint.  The platform is to be access via two stairways. 
The occupant load is proposed to be 20 in the warehouse/office areas and an additional 1 person in 
the sleeping firecell. 
A Type 4 (automatic smoke detection) system is proposed for the bulk of the building with Type 5 
coverage in the sleeping firecell.   
The NZFS understands that the platform is a recently-constructed but unconsented feature.  The 
BCA has indicated that the building’s owner has approached the Council for retrospective consent 
and has taken interim measures to mitigate life risk in the building.  The BCA has provide information 
concerning the project and is content with the progress of the project.  
The NZFS notes that local Fire Risk Management involvement has been sought and advice obtained.  
The comments in this memo take into account that advice.   
In the context of the indicated application for a Certificate of Acceptance, the NZFS understands that 
the ‘as nearly as reasonably practicable’ (ANARP) avenue is not available to the applicant.  
The FEB neither states the height of the building nor indicates the storage height in the 450m2 outside 
the perimeter of the intermediate floor.  
The FEB report proposes to use a fully performance-based design approach to demonstrate that the 
fire design for the building will meet the performance requirements of the NZ Building Code. This 
letter outlines the NZFS position as a stakeholder in the building design process.  
 


 
 
 
 
 
 
 
 
 Referenced Information 
 
Item 
 Title 
Date 
Revision 
Email from Carol Caldwell with attached 
162030 
minutes concerning site meeting held on 
09 May 2017 
n/a 
01 May 2017  
NZFS’s response to additional 
9571 
29 Nov 2016 
02 
information 
FEB – New Platform in Existing 
162030 
Warehouse at 49 Stoneleigh Drive, 
8 Nov 2016 

Rolleston 
Meme from Apeksha Shah to Stephen 
162030 
08 Nov 2016 
n/a 
Lambert providing additional information 
9571 
NZFS’s response to FEB 
31 Oct 2016 
01 
FEB – New Platform in Existing 
162030 
Warehouse at 49 Stoneleigh Drive, 
10 Oct 2016 

Rolleston 
 
 
 
 
 
As  discussed,  the  NZFS  has  reviewed  the  FEB  documentation  identified  above  and  offers  the 
following comments. 
 
The  following  items  are  considered  to  relate  to  compliance  with  the  requirements  of  the  Building 
Code:  
With reference to the NZFS’s previous letter concerning the project (Response 02, dated 29 Nov 
2016),  the  Service  considers  that  the  issues  indicated  in  items  1  to  4  of  that  letter  have  been 
addressed at the site meeting and, therefore, are not addressed further in this letter   
5. 
Period of Structural Adequacy Calculations - The NZFS has reviewed the calculations 
provided for the period of structural adequacy (PSA) for the unprotected steel supporting 
the intermediate floor, and offers the following comments: 
 
a.  The  PSA  calculations  have  employed  the  limiting  temperature  correlation  and  have 
assumed equivalent standard fire exposure for reaching this limiting temperature. The 
NZFS notes the following: 
 
i. 
The loading schematic does not appear to reflect the photographs taken on site, 
and the number of storage levels contributing to the axial load on the columns.  
Of particular note are the stated sizes of the columns compared to the exposed 
perimeter.    Also  it  is  not  clear  the  perforations  in  the  columns  have  been  fully 
accounted for in the calculations.  In addition, on-site observation indicated that 
some columns were note of a closed section.  These details would benefit from 
the provision of further information 
 
ii. 
The  beams  supporting  the  floor  have  not  been  assessed  for  their  period  of 
structural adequacy. Given the relatively long span and potentially more critical 
three-sided exposure, the NZFS considers that the failure of beams should be 
assessed. 
 
iii. 
The limiting  temperature calculated  (887°C)  is  higher than  the  upper bound of 
850°C specified in Section 11.6 of NZS 3404. This alone would reduce the PSA 
to approximately 19 minutes. 
 
 


 
 
 
 
 
 
 
 
   
b.  In addition, calculations have been performed in a spreadsheet and calculations to 
support some individual inputs are not supplied. Areas of uncertainty include, but are 
not limited to: 
 
i. 
Derivation of the tributary area including the intermediate floor 
ii. 
The derivation of buckling stresses and critical stresses. 
iii. 
Use of the calculated effective widths in later calculations. 
iv. 
The calculation of the weight of the wood floor assembly. 
v. 
Information relating to the 400 kg storage load per level. 
vi. 
Assumptions relating to the mechanical properties of steel. 
 
Given the issues and perceived lack of clarity concerning the issues above, the NZFS is 
unable to place confidence in the proposed calculations. 
 
 
6.  Operational Response –  Given that the intermediate floor is intended to support an imposed 
load above floor level, the NZFS considers this to be a “structural system”. 
 
Clause  C5.6  of  the  Building  Code  indicates  that  the  purpose  of  the  fire  protection  of 
intermediate floors and their means of access to is to allow firefighters to reach the scene of 
a  fire  (whether  on  or  beneath  and  intermediate  floor)  to  conduct  fire-fighting  and  search 
operations and, if necessary, to withdraw to a place beyond the extent of the intermediate 
floor prior to the floor’s structure support and access being compromised by fire. 
 
The  proposal  suggests  that  no  applied  fire  protection  is  required  because  the  structure 
inherently provides 20 minutes’ fire resistance.  The NZFS observes that this implies that the 
structure will be directly affected from the onset of the fire and, therefore, that the period of 
fire resistance is taken to be the time between ignition and the period when the intermediate 
floor is subject to structural failure.  
 
As  indicated  in  previous  letters,  the  decision  to  enter  a  building  to  conduct  firefighting  or 
rescue  operations  is  a  decision  made  by  the  Incident  Commander  at  the  time  of  the  fire.  
Clause C5.6 of the Code requires buildings to be designed and constructed with regard to 
the safety of firefighters and does not make this provision contingent on the probability of 
firefighters entering the building.   
 
Clause C5.6 also makes the consideration of “the firefighters’ personal protective equipment 
and standard training” a requirement of the design.  The NZFS considers this to be relevant 
to the resources available and the attendance times of those resources.  Fire Service training 
indicates that entry into the building would not be made until, at the very least, the crews of 
two appliances are available on site. The Service has made initial investigations of responses 
to incidents in the area: the initial results suggest a response time that would encompass 
approximately 90% of the incidents to be approximately 800 seconds from being alerted.  It 
should be noted that this period is not the same as 800 seconds from ignition of the fire.  The 
complete results will be made available to the stakeholders once they have been compiled 
and collated.       
 
A further period is required to brief the crews and set up the safety system for the Breathing 
Apparatus  wearers  who  are  to  enter  the  building.    The  advice  of  the  NZFS’s  operational 
officer consulted on this issue was that “3-5 minutes” would be required for the BA crew to 
be formed and briefed and to reach the outer wall of the building.  Taking the longer period, 
this gives a cumulative time of over 18 minutes. 
 
 
 
 
 




 
 
 
 
 
 
 
 
 
  The following factors must then be added to the response time: 
a.  The alarm system’s detection period; 
b.  The notification time and/or time for the call to be made to the Fire Service; 
c.  The time for the Breathing Apparatus wearers to enter the building and locate the seat 
of the fire and/or search the intermediate floor.   
 
This  is  likely  to  bring  the  total  time  to  significantly  greater  than  20  minutes.    The  NZFS 
observes that both the Acceptable Solutions and C/VM2 require fire rating of intermediate 
floors of at least 30 minutes’ duration. 
 
To avoid unnecessary iterations of the FEB process the NZFS welcomes discussion on any of the 
above items, however the NZFS recommends that the FEB be revised to address the items identified 
above as well as any additional items identified by other stakeholders.  The NZFS also observes that 
the issues may be more quickly addressed by an on-site meeting. 
Our  review  of  the  information  provided  has  focused  on  the  performance-based  design  elements 
identified  and  is  intended  to  provide  guidance  to  reduce  the  consent  risks  associated  with 
undertaking performance-based design. No assessment against the requirements of the acceptable 
solutions  has  been  undertaken.  Also  please  note  that  this  advice  does  not  imply  a  technical 
verification of the information provided. 
If you have any queries or questions related to the above please do not hesitate to contact either of 
the signatories below 

 
Sincerely,  
 
Stephen Lambert 

Jeremy Gall 
Fire Engineering Unit 
 
 
cc:  
Jenny Lilley, Selwyn District Council   
 
[email address] 
 
 
Jonathan Nyman, Fire Review Solutions 
 
[email address] 
 
 
Malcom Gray   
 
 
 
 
[email address] 
 
Mike Gaskin, NZFS 
 
 
 
 
[email address] 
 
Fire Engineering Unit, NZFS   
 
 
[email address] 
 
 
 
 
 
 


 
 
 
 
 
Our Ref: 162030 
 
6 April 2017 
 
 
Selwyn District Council 
P O Box 90 
Rolleston 7643 
Attn:  Jenny Lilley 
 
 
 
Dear Jenny, 
 
RE: 49 Stoneleigh Drive, Rolleston - NZFS Reference: 9571 – Rev 02 
 
Thank  you  for  your  email  on  14  March  requesting  to  address  the  NZFS  second  response 
comments on FEB of dated 29 November 2016.  
 
We are very disappointed that NZFS has added new comments in second response than the 
first response comments of dated 31 Oct 2016. It is a huge time delay and expense to our 
client and it has caused frustration to him about the NZFS FEB response system. 
 
We already discussed the proposed approach to BCA, BCA peer reviewer and NZFS operation 
officer beforehand. The alternative solution is to demonstrate the means of escape from the 
existing  platform  under  S  112  of  the  building  code.  The  building  is  significantly  upgraded 
with Type 4 system which will give early warning to occupants compare to existing Type 3 
system.  
 
We are expecting the BCA to take proactive approach and resolve the issues to help client. 
 
Please find appended below our replies to the queries relating to … 
 
1.  Use of C/VM2 – Your response is noted.  Notwithstanding the BCA’s reported agreement 
to  the approach, the NZFS observes that, while the building may be consented, the over-
sized  intermediate  floor  is  subject  to  a  Certificate  of  Acceptance:  as  previously  stated, 
this does  not allow for any ANARP consideration. 
  Given that the approach taken is indicated to be an alternative solution, the selective use 
of  C/VM2, is not considered to be appropriate given the context of the MBIE guidance 
that  states, “The Verification Method C/VM2 method is a complete design system with 
interrelated  inputs  and  design  parameters  that  result  in  an  acceptable  level  of  risk,” 
and,  “Should  a  designer wish to vary the design inputs other than listed in C/VM2…..al  
design  inputs  must  be  justified”  (MBIE  “Verification  Method  C/VM2  interpretations” 
2.6).  The  NZFS  therefore  considers  that  reliance  on  a  partial  application  of  the 
methodology  may  not  result  in  a  proposal that achieves the level of safety indicated by 
the compliance documents. 
 
Enlightened Solutions Ltd, PO Box 8709, Christchurch, 8440, New Zealand  
          
s 9(2)(a)
Email:[email address]   www.enlightenedsolutions.co.nz 


 6 Apr 17 
DRU Reply – 49 Stoneleigh Drive 
2 of 4 
  Please amend the documentation to either justify all inputs used in the proposal or comply 
in  full with the requirements of C/VM2. 
 
Reply:    The  provided  alternative  solution  approach  in  FEB  was  discussed  and 
agreed  by  Council,  Council  peer  reviewer  and  NZFS  operation  engineer.  The 
existing  warehouse  is  recently  consented  so  not  worth  to  check  the  full 
compliance with the C/VM2. 
 
 
2.  Argument regarding Size of Intermediate Floor – The argument concerning the size of the 
intermediate floor is not considered to address the intention of the provision. The NZFS 
observes  that  the  35m2  value  allows  for  a  limited  balcony  plume  and  therefore,  a 
reasonable  level  of  air  entrainment:  this  may  result  in  a  small  increase  in  the  level  of 
smoke production but not one that exceeds the safety margins implied by conservativism 
of the other factors. 
 
The proposal involves the 450m2 platform, with none of the side located against a side 
wall. This results in a potential for over 88m of balcony edge around a fire beneath the 
intermediate floor. The result may be a very significant increase in  the  volume  of smoke  
and  a commensurately shorter time until the visibility criterion is breached.  
The FEB does not address the height of the warehouse; therefore, an assessment of the 
potential for smoke production against the available smoke volume cannot be made. In 
this respect, the NZFS notes that the FEB proposes ventilation to the under-floor area is 
limited to the aisles. 
This  implies  that  there  are  walls  surrounding  the  space  beneath  the  intermediate  floor 
and  that  these  walls  are  effectively  smoke  separations.  Unless  this  is  the  case,  the 
potential for leakage and, therefore, smoke production may be greatly understated. 
 
Please demonstrate that the assumptions made with regard to ventilation of the fire and 
smoke production are justified. 
 
Reply: We don’t think that the limitation of the 35m2 area in C/ASx is related to a 

limited balcony plume and air entrainment concern.  The 35m2 value was in the 
old Acceptable Solutions C/AS1. Certainly, the intent of the 35m2 would need to 
be confirmed with MBIE. 

 
In the FEB, the 35m2 approach from C/AS5 is used only for the  equivalency for 

travel  distance.  The  challenging  fire  is  proposed  to  get  the  activation  time  of 
proposed  smoke  detector  and  egress  time  for  occupants.  The  occupant  load  on 
the  platform  is  very  low  in  comparison  of  large  volume  of  warehouse  space. 
Therefore, the above comment #2 is considered to be irrelevant. 
 
3.  RSET – The RSET is not proposed to be assessed against a calculated ASET; rather, it is 
compared to the travel distance requirements of the Acceptable Solutions. However, the 
equivalence of all other aspects of the Acceptable Solutions is not addressed. 
 
While the NZFS acknowledges that an escape distance can be inferred from a calculated 
escape time, the distances cited  in the Acceptable Solutions  rely on  a  number  of other 
aspects  that  contribute  to  the  implicit  level  of  safety:  one  of  these  is  the  size  of  the 
intermediate  floor.  The  NZFS  observes  that  the  intermediate  floor  exceeds  the  area 
allowed  for  a  Type  4  alarm  system  in  the  Acceptable  Solutions.  The  NZFS  therefore 
Enlightened Solutions Ltd   PO Box 8709   Christchurch 8440   
     [email address] 
s 9(2)(a)
G:\CAC Projects 16\162030 49 Stoneleigh Drive, Izone\Rep Corr 2017\162030 ES DRU Reply Lttr 6Apr17.doc 
CopyrightEnlightened Solutions Ltd 2017 


 6 Apr 17 
DRU Reply – 49 Stoneleigh Drive 
3 of 4 
  considers this approach to be an incomplete assessment. 
 
  The  NZFS  observes  that  the  uncertainty  regarding  the  validity  of  the  ASET/RSET 
relationship can be readily resolved by modelling the conditions. 
 
Please revise the FEB to include consideration of the ASET/RSET relationship. 
 
Reply: This is a new comment compared to previous FEB comments from NZFS. 
This  comment  is  considered  to  be  irrelevant  to  our  proposed  approach  of  FEB 
which is approved by BCA. 
 
 
4.  Use  of  B-Risk  for  ASET  Assessment  –  The  NZFS  observes  that,  unless  the  conditions 
indicated  in  Figure  1  of  the  FEB  can  be  confirmed  to  be  valid,  there  is  potential  for 
significant areas of overlapping smoke flows from beneath the intermediate floor. This will 
complicate  the  assessment  of  smoke  production  and,  therefore,  the  assessment  of  the 
ASET. 
 
If  an  ASET/RSET  relationship  is  to  be  determined,  please  indicate  how  B-Risk  will  be 
configured to assess these interacting smoke plumes. 
 
Reply: This is a new comment compared to previous FEB comments from NZFS. 
This  comment  is  considered  to  be  irrelevant  to  our  proposed  approach  of  FEB 

which is approved by BCA. 
 
 
5.  Fire-rating of Intermediate Floor – The FEB seeks to argue that the intermediate floor is 
an  existing  feature  and,  therefore,  can  be  assessed  on  an  ANARP  basis.  The  NZFS 
observes  that  the  application  for  a  Certificate  of  Acceptance  does  not  allow  for 
application  of  ANARP  considerations.  While  the  NZFS  acknowledges  that  the  BCA 
may  nevertheless  grant  Consent,  the  Service  is  obliged  to  offer  its  comments on  the 
proposal irrespective of any pre-  determined agreement or limitations.  In this case, the 
NZFS considers that the intermediate  floor should be considered as new work. 
 
  Furthermore,  the  FEB  notes  the  opinion  of  the  Fire  Risk  Management  Officer  that 
all  occupants  would  be  able  to  evacuate  the  building  and  that  internal  fire-fighting 
operations  would be unlikely to occur if there is no life risk. 
 
The  NZFS  observes  that  fire-fighting  operations  involve  dynamic  risk  assessment  and 
that,  in the circumstances described, internal fire-fighting may not take place. However, 
that is a  decision to be taken at the time of the incident. By not providing the protection 
required by  the Building Code, the outcome of the dynamic risk assessment is effectively 
pre-determined  and,  therefore,  if  circumstances  mean  that  occupants  have  not 
evacuated, fire-fighters may  be  placed  at significant additional  hazard  that  would  have 
been addressed had the  requirements of the Building Code been applied. 
 
The  NZFS  therefore  considers  that  the  argument  regarding  whether  or  not  fire 
operations  are conducted  not to be  relevant to the  provisions required  by the  Building 
Code. 
 
Enlightened Solutions Ltd   PO Box 8709   Christchurch 8440   
     [email address] 
s 9(2)(a)
G:\CAC Projects 16\162030 49 Stoneleigh Drive, Izone\Rep Corr 2017\162030 ES DRU Reply Lttr 6Apr17.doc 
CopyrightEnlightened Solutions Ltd 2017 



 6 Apr 17 
DRU Reply – 49 Stoneleigh Drive 
4 of 4 
  Please indicate how this issue is to be addressed. 
 
Reply: We have addressed all the relevant clauses of firefighting operations in our 

revised  FEB  rev  1  and  first  response  to  NZFS.  We  don’t  agree  with  NZFS 
comments.  The approach put forward in the FEB is in line with the support from 
Canterbury NZFS.   
 
 
6.  Disapplication of ‘C’ Clauses – Section 10 of the FEB includes several comments stating 
that, “This clause is not applicable for this building under S.112”. 
  The NZFS observes that new works must comply in full  with the Building code and 
that  existing  conditions  should  not  be  worsened  by  the  new  works.    By  seeking  to 
disregard  several  aspects  of  the  Clauses  without  analysis,  the  FEB  proposes  that  the 
Consent  stage  documentation  will  not  demonstrate  non-worsening.  The  NZFS 
considers  that  this  is  not  appropriate given the conditions within the building have been 
changed by the un-Consented  addition of a non-compliant intermediate floor. 
 
Please  indicate  whether  the  non-worsening  of  existed  conditions  is  proposed  to  be 
demonstrated. 
 
Reply: The provided FEB adequately addresses the fire requirements and there is 
no  ‘worsening’  of  the  existing  fire  features  in  the  building.    There  is  in  fact  an 
improvement as the existing Type 3 system is proposed to be changed to a Type 4 

system.  
 
 
Please contact me should you have any queries regarding this. 
 
Yours faithfully, 
Enlightened Solutions Ltd 
 
Apeksha Shah 
BE (Civil), MEFE 
GIPENZ (Fire) 
 
Enlightened Solutions Ltd   PO Box 8709   Christchurch 8440   
     [email address] 
s 9(2)(a)
G:\CAC Projects 16\162030 49 Stoneleigh Drive, Izone\Rep Corr 2017\162030 ES DRU Reply Lttr 6Apr17.doc 
CopyrightEnlightened Solutions Ltd 2017 




 
 
 
 
Stephen Lambert 
 
NZFS Engineering Unit 
National Headquarters 
PO Box 2133 
Wellington 6140 
 
New Zealand 
 
[email address] 
 
s 9(2)(a)
 
 
 
 
 
Apeksha Shah 
Enlightened Solutions 
PO Box 8709 
Christchurch 8440 
 
29 November 2016 
 
Dear Apeksha, 
 
Re: 
New Platform in Existing Warehouse, 49 Stoneleigh Drive, Rolleston 
(NZFS Reference: 9571 - Rev 02) 
Thank you for the additional information concerning the above project. The NZFS understands that 
the project involves the construction of a new storage platform (33.5m by 13.5m at a height of 2.4m 
in an existing building of area 958m2: this represents 50.2% of the warehouse area and 47.2% of the 
total building’s footprint.  The platform is to be access via two stairways. 
The occupant load is proposed to be 20 in the warehouse/office areas and an additional 1 person in 
the sleeping firecell. 
A Type 4 (automatic smoke detection) system is proposed for the bulk of the building with Type 5 
coverage in the sleeping firecell.   
The NZFS understands that the platform is a recently-constructed but unconsented feature.  The 
BCA has indicated that the building’s owner has approached the Council for retrospective consent 
and has taken interim measures to mitigate life risk in the building.  The BCA has provide information 
concerning the project and is content with the progress of the project.  
The NZFS notes that local Fire Risk Management involvement has been sought and advice obtained.  
The comments in this memo take into account that advice.   
In the context of the indicated application for a Certificate of Acceptance, the NZFS understands that 
the ‘as nearly as reasonably practicable’ (ANARP) avenue is not available to the applicant.  
The FEB neither states the height of the building nor indicates the storage height in the 450m2 outside 
the perimeter of the intermediate floor.  
The FEB report proposes to use a fully performance-based design approach to demonstrate that the 
fire design for the building will meet the performance requirements of the NZ Building Code. This 
letter outlines the NZFS position as a stakeholder in the building design process.  
 


 
 
 
 
 
 
 
 
 Referenced Information 
 
Item 
 Title 
Date 
Revision 
FEB – New Platform in Existing 
162030 
Warehouse at 49 Stoneleigh Drive, 
8 Nov 2016 

Rolleston 
Meme from Apeksha Shah to Stephen 
162030 
08 Nov 2016 
n/a 
Lambert providing additional information 
9571 
NZFS’s response to FEB 
31 Oct 2016 
01 
FEB – New Platform in Existing 
162030 
Warehouse at 49 Stoneleigh Drive, 
10 Oct 2016 

Rolleston 
 
 
 
 
 
As  discussed,  the  NZFS  has  reviewed  the  FEB  documentation  identified  above  and  offers  the 
following comments. 
 
The  following  items  are  considered  to  relate  to  compliance  with  the  requirements  of  the  Building 
Code:  
1.  Use of C/VM2 – Your response is noted.  Notwithstanding the BCA’s reported agreement to 
the approach, the NZFS observes that, while the building may be consented, the over-sized 
intermediate floor is subject to a Certificate of Acceptance: as previously stated, this does 
not allow for any ANARP consideration. 
 
Given that the approach taken is indicated to be an alternative solution, the selective use of 
C/VM2,  is  not  considered  to  be  appropriate  given  the  context  of  the  MBIE  guidance  that 
states, “The Verification Method C/VM2 method is a complete design system with interrelated 
inputs  and  design  parameters  that  result  in  an  acceptable  level  of  risk,”  and,  “Should  a 
designer wish to vary the design inputs other than listed in C/VM2…..all design inputs must 
be justified” (MBIE “Verification Method C/VM2 interpretations” 2.6).  The NZFS therefore 
considers  that  reliance  on  a  partial  application  of  the  methodology  may  not  result  in  a 
proposal that achieves the level of safety indicated by the compliance documents. 
 
Please amend the documentation to either justify all inputs used in the proposal or comply in 
full with the requirements of C/VM2. 
 
2.  Argument regarding Size of Intermediate Floor – The argument concerning the size of the 
intermediate  floor  is  not  considered  to  address  the  intention  of  the  provision.    The  NZFS 
observes that the 35m2 value allows for a limited balcony plume and therefore, a reasonable 
level of air entrainment: this may result in a small increase in the level of smoke production 
but not one that exceeds the safety margins implied by conservativism of the other factors. 
 
The proposal involves the 450m2 platform, with none of the side located against a side wall.  
This results in a potential for over 88m of balcony edge around a fire beneath the intermediate 
floor.    The  result  may  be  a  very  significant  increase  in  the  volume  of  smoke  and  a 
commensurately  shorter  time  until  the  visibility  criterion  is  breached.    The  FEB  does  not 
address the height of the warehouse; therefore, an assessment of the potential for smoke 
production against the available smoke volume cannot be made.  In this respect, the NZFS 
notes that the FEB proposes ventilation to the under-floor area is limited to the aisles.   
 
 
 


 
 
 
 
 
 
 
 
 
This implies that there are walls surrounding the space beneath the intermediate floor and 
that these walls are effectively smoke separations.  Unless this is the case, the potential for 
leakage and, therefore, smoke production may be greatly understated. 
 
Please  demonstrate  that  the  assumptions  made  with  regard  to  ventilation  of  the  fire  and 
smoke production are justified. 
 
3.  RSET – The RSET is not proposed to be assessed against a calculated ASET; rather, it is 
compared  to  the  travel  distance  requirements  of  the  Acceptable  Solutions.    However,  the 
equivalence of all other aspects of the Acceptable Solutions is not addressed.   
 
While the NZFS acknowledges that an escape distance can be inferred from a calculated 
escape  time,  the  distances  cited  in  the  Acceptable  Solutions  rely  on  a  number  of  other 
aspects  that  contribute  to  the  implicit  level  of  safety:  one  of  these  is  the  size  of  the 
intermediate floor.  The NZFS observes that the intermediate floor exceeds the area allowed 
for a Type 4 alarm system in the Acceptable Solutions.  The NZFS therefore considers this 
approach to be an incomplete assessment. 
 
The NZFS observes that the uncertainty regarding the validity of the ASET/RSET relationship 
can be readily resolved by modelling the conditions. 
 
Please revise the FEB to include consideration of the ASET/RSET relationship. 
  
4.  Use  of  B-Risk  for  ASET  Assessment  –  The  NZFS  observes  that,  unless  the  conditions 
indicated in Figure 1 of the FEB can be confirmed to be valid, there is potential for significant 
areas of overlapping smoke flows from beneath the intermediate floor.  This will complicate 
the assessment of smoke production and, therefore, the assessment of the ASET. 
 
If  an  ASET/RSET  relationship  is  to  be  determined,  please  indicate  how  B-Risk  will  be 
configured to assess these interacting smoke plumes.  
 
5.  Fire-rating of Intermediate Floor – The FEB seeks to argue that the intermediate floor is an 
existing feature and, therefore, can be assessed on an ANARP basis.  The NZFS observes 
that the application for a Certificate of Acceptance does not allow for application of ANARP 
considerations.    While  the  NZFS  acknowledges  that  the  BCA  may  nevertheless  grant 
Consent, the Service is obliged to offer its comments on the proposal irrespective of any pre-
determined agreement or limitations.  In this case, the NZFS considers that the intermediate 
floor should be considered as new work. 
 
Furthermore,  the  FEB  notes  the  opinion  of  the  Fire  Risk  Management  Officer  that  all 
occupants would be able to evacuate the building and that internal fire-fighting operations 
would be unlikely to occur if there is no life risk. 
 
The NZFS observes that fire-fighting operations involve dynamic risk assessment and that, 
in the circumstances described, internal fire-fighting may not take place.  However, that is a 
decision to be taken at the time of the incident.  By not providing the protection required by 
the Building Code, the outcome of the dynamic risk assessment is effectively pre-determined 
and, therefore, if circumstances mean that occupants have not evacuated, fire-fighters may 
be  placed  at  significant  additional  hazard  that  would  have  been  addressed  had  the 
requirements of the Building Code been applied.  
 
The NZFS therefore considers that the argument regarding whether or not fire operations 
are conducted not to be relevant to the provisions required by the Building Code.      
 
Please indicate how this issue is to be addressed. 
 
 



 
 
 
 
 
 
 
 
 
 
 
6.  Disapplication  of  ‘C’  Clauses  –  Section  10  of  the  FEB  includes  several  comments  stating 
that, “This clause is not applicable for this building under S.112”.   
 
The  NZFS  observes  that  new  works  must  comply  in  full  with  the  Building  code  and  that 
existing  conditions  should  not  be  worsened  by  the  new  works.    By  seeking  to  disregard 
several aspects of the Clauses without analysis, the FEB proposes that the Consent stage 
documentation  will  not  demonstrate  non-worsening.    The  NZFS  considers  that  this  is  not 
appropriate given the conditions within the building have been changed by the un-Consented 
addition of a non-compliant intermediate floor.  
   
Please  indicate  whether  the  non-worsening  of  existed  conditions  is  proposed  to  be 
demonstrated. 
 
To avoid unnecessary iterations of the FEB process the NZFS welcomes discussion on any of the 
above items, however the NZFS recommends that the FEB be revised to address the items identified 
above as well as any additional items identified by other stakeholders.  The NZFS also observes that 
the issues may be more quickly addressed by an on-site meeting. 
Our  review  of  the  information  provided  has  focused  on  the  performance-based  design  elements 
identified  and  is  intended  to  provide  guidance  to  reduce  the  consent  risks  associated  with 
undertaking performance-based design. No assessment against the requirements of the acceptable 
solutions  has  been  undertaken.  Also  please  note  that  this  advice  does  not  imply  a  technical 
verification of the information provided. 
If you have any queries or questions related to the above please do not hesitate to contact me. 
 
Sincerely,  
 
Stephen Lambert 
Fire Engineering Unit 
 
 
cc:  
Jenny Lilley, Selwyn District Council   
 
[email address] 
 
 
Jonathan Nyman, Fire Review Solutions 
 
[email address] 
 
 
Graton Holding Warehouse 
 
 
 
TBN 
 
Mike Gaskin, NZFS 
 
 
 
 
mike [email address] 
 
Fire Engineering Unit, NZFS   
 
 
[email address] 
 
 
 
 
 
 



 
 
 
Our Ref: 162030 
 
8 November 2016 
 
 
NZFS Engineering Unit 
PO Box 2133 
Wellington 6140 
Attn:  Stephen Lambert 
 
 
Dear Stephen, 
 
RE: 49 Stoneleigh Drive, Rolleston - NZFS Reference: 9571 – Rev 1 
 
Please find appended below our replies to the comments dated 31 October 2016. 
 
1.  Use of C/VM2 – Sections 11.1 and 11.2 propose the use of C/VM2 parameters in both 
the modelling and the ASET/RSET analysis. 
The  NZFS  observes  that  both  MBIE  guidance  and  Determination  2015/058  indicate 
that  C/VM2  is  a  complete  system  that  should  be  applied  in  its  entirety.  Therefore, 
selective use of parameters from the methodology may undermine the safety margin 
implied by its application. 
While C/VM2 may be valid as a comparator to demonstrate equivalence, the proposed 
approach  does  not  identify  or  compensate  for  departures  from  C/VM2.  The  use  of 
elements of C/VM2 therefore does not demonstrate equivalence with C/VM2. 
Where  references  to  factors  included  in  C/VM2  are  made,  please  amend  the  FEB  to 
provide the justification for their use and, if applicable, the source material. 
In  addition,  given  the  simplified  RSET  analysis  permitted  in  C/VM2,  please 
demonstrate  that  the  travel  speeds  applied  are  justified.  In  this  respect,  the  NZFS 
observes that C/VM2 explicitly refers to its limitations in respect of egress analysis and, 
in the comments following paragraphs 3.2 and 3.2.5, refers to Section 3 of the SFPE 
Handbook for further details. 
 
Reply:  The  warehouse  is  recently  consented  and  proposed  approach  was  discussed  and 
agreed by Council and Council reviewer and NZFS operation engineer. 
 
2.  Fire-fighting  Access  and  Facilities  -  Section  10.4  of  the  FEB  proposes  that 
consideration is not to be given to the requirements of Clause C5 because the project 
is proposed under s112 of the Building Act. 
Notwithstanding  this  opinion,  there  is  a  record  of  communications  between  the  Fire 
Service’s Operational representative and the design team appended to the report. The 
statement and the evidence are therefore contradictory. 
The NZFS observes that the provision of the storage platform represents new works 
and that s17 of the Building Act requires new works to comply in full with the Building 
Code.  Consequently,  the  operational  needs  and  safety  of  firefighters  should  be 
considered as part of this project. 
Please indicate how this issue is to be addressed. 
 
Enlightened Solutions Ltd   PO Box 8709, Christchurch, 8440, New Zealand   Email: [email address] 
     www.enlightenedsolutions.co.nz 
s 9(2)(a)


 8 Nov 2016   
49 Stoneleigh Drive, Rolleston 
2 of 3 
 Reply:  We have included the compliance with C5 in the FEB. Please refer attached updated 
FEB. 
 
3.  Sleeping Area – The FEB refers to a sleeping firecell in the building. However, this is 
not  apparent  in  the  provided  drawings.  Please  indicate  where  the  firecell  is  located 
and show the means of escape from this space.  
 
Reply:  Please refer attached TM Consultants - Fire Design Report in Appendix A of FEB. The 
drawings  at  the  back  of  the  report  shows  fire  separated  sleeping  room  and  its  final 
exit door. 
4.  Route Shown on Drawing Fire#3 – Drawing Fire#3 shows a route with an associated 
distance of 63.7m. Given the presence of other doors in the plan north elevation of the 
building,  please  clarify  whether  this  is  intended  to  represent  a  maximum  open  path 
travel distance rather than a dead-end travel distance. 
 
Reply:  On the drawing of Fire #3, 63.7 m is the maximum open path travel distance. There 
are two means of escape available from the remote corner of the warehouse. 
5.  DEOP  Calculation  –  Drawing  Fire#2  shows  a  calculation  comparing  the  DEOP  travel 
distance  from  a  hypothetical  platform  of  area  35m2  with  travel  distance  from  the 
proposed platform. 
In  the  context  of  a  scenario  involving  consideration  of  RSET,  please  clarify  the 
relevance of this assessment. 
As  indicated  above,  the  NZFS  considers  equivalence  to  an  element  of  a  compliance 
methodology is not the same as demonstrating compliance with that methodology. In 
particular,  given  the  reference  is  in  the context of an  intermediate  floor  that  has  an 
area more than 11 times greater than that permitted for storage greater than 3m by 
C/AS5,  paragraph  4.13.7,  the  argument  for  equivalence  is  considered  to  be 
significantly undermined. 
 
Reply:  The travel distance from 35m2 from a complying C/AS5 mezzanine floor and for this 
mezzanine  floor  are  same  and  this  is  relevant  to  the  discussion  building  code 
compliance.  It demonstrates that the time on this platform and potential exposure to 
a fire is the same or less exposure in this case then in the C/AS complying case. 
6.  Modelling – Challenging  Fire  – Section 11.0  of  the  FEB proposes  that  a  “challenging 
fire” will be modelled to determine the alarm activation time and will be limited to the 
extent of the platform only. The NZFS considers that this cannot be represented as a 
Challenging Fire as there is no assessment of tenability conditions in other parts of the 
warehouse.  Furthermore,  given  that  explicit  consideration  if  either  ASET  or  RSET  is 
beyond the scope of the Acceptable Solutions, any reference to these factors requires 
tenability to be modelled. The terms of the FEB do not suggest that this is proposed. 
Consequently, the NZFS considers that the proposal neither demonstrates compliance 
with  a  recognised  Compliance  Document  nor  demonstrates  compliance  with  the 
tenability criteria given in Clause C4.3 of the Building Code.  
Please indicate how this issue is to be addressed 
 
Reply:  The warehouse is recently consented in 2015 under consent number BC150389 so it 
complies with the current code requirements.  
It  has  been  agreed  with  Council  that  the  new  platform  requires  compliance  with 
means of escape form fire under S112 of the building code.  
Enlightened Solutions Ltd   PO Box 8709   Christchurch 8440   
     [email address] 
s 9(2)(a)
G:\CAC Projects 16\162030 49 Stoneleigh Drive, Izone\Rep Corr FEB\NZFS & Cncl\162030 NZFS reply ltr 8nov16.doc 



 8 Nov 2016   
49 Stoneleigh Drive, Rolleston 
3 of 3 
 
The fire under the platform is considered appropriate for the contents located under 
the platform.   
The  building  is  to  be  upgraded  with  the  Type  4  system.    The  design  approach  is 
equivalency with the C/AS5 travel distance requirements, hence the Challenging Fire is 
proposed  only  underneath  the  platform  to  check  tenability  of  occupants  on  the 
platform.  
 
Please contact me should you have any queries regarding this. 
 
Yours faithfully, 
Enlightened Solutions Ltd 
 
Apeksha Shah 
BE (Civil), MEFE 
GIPENZ (Fire) 
Enlightened Solutions Ltd   PO Box 8709   Christchurch 8440   
     [email address] 
s 9(2)(a)
G:\CAC Projects 16\162030 49 Stoneleigh Drive, Izone\Rep Corr FEB\NZFS & Cncl\162030 NZFS reply ltr 8nov16.doc 




 
 
 
 
Stephen Lambert 
 
NZFS Engineering Unit 
National Headquarters 
PO Box 2133 
Wellington 6140 
 
New Zealand 
 
[email address] 
 
s 9(2)(a)
 
 
 
 
Apeksha Shah 
Enlightened Solutions 
PO Box 8709 
Christchurch 8440 
 
31 October 2016 
 
Dear Apeksha, 
 
Re: 
New Platform in Existing Warehouse At 49 Stoneleigh Drive, Rolleston 
(NZFS Reference: 9571 - Rev 01) 
Thank you for the opportunity to be involved in the above project. The NZFS understands that the 
project involves the construction of a new storage platform (33.5m by 13.5m at a height of 2.4m in 
an existing building of area 958m2: this represents 50.2% of the warehouse area and 47.2% of the 
total building’s footprint.  The platform is to be access via two stairways. 
The occupant load is proposed to be 20 in the warehouse/office areas and an additional 1 person in 
the sleeping firecell. 
A Type 4 (automatic smoke detection) system is proposed for the bulk of the building with Type 5 
coverage in the sleeping firecell.   
The NZFS understands that the platform is a recently-constructed but unconsented feature.  The 
BCA has indicated that the building’s owner has approached the Council for retrospective consent 
and has taken interim measures to mitigate life risk in the building.  The BCA has provide information 
concerning the project and is content with the progress of the project.  
The NZFS notes that local Fire Risk Management involvement has been sought and advice obtained.  
The comments in this memo take into account that advice.   
In the context of the indicated application for a Certificate of Acceptance, the NZFS understands that 
the ‘as nearly as reasonably practicable’ (ANARP) avenue is not available to the applicant.  
The FEB report proposes to use a fully performance-based design approach to demonstrate that the 
fire design for the building will meet the performance requirements of the NZ Building Code. This 
letter outlines the NZFS position as a stakeholder in the building design process.  
 
 
 


 
 
 
 
 
 
 
 
 Referenced Information 
 
Item 
 Title 
Date 
Revision 
FEB – New Platform in Existing 
162030 
Warehouse at 49 Stoneleigh Drive, 
10 Oct 2016 

Rolleston 
 
 
 
 
 
As  discussed,  the  NZFS  has  reviewed  the  FEB  documentation  identified  above  and  offers  the 
following comments. 
The  following  items  are  considered  to  relate  to  compliance  with  the  requirements  of  the  Building 
Code:  
1.  Use of C/VM2 – Sections 11.1 and 11.2 propose the use of C/VM2 parameters in both the 
modelling and the ASET/RSET analysis. 
  
The  NZFS  observes  that  both  MBIE  guidance  and  Determination  2015/058  indicate  that 
C/VM2 is a complete system that should be applied in its entirety.  Therefore, selective use 
of  parameters  from  the  methodology  may  undermine  the  safety  margin  implied  by  its 
application. 
   
While  C/VM2  may  be  valid  as  a  comparator  to  demonstrate  equivalence,  the  proposed 
approach does not identify or compensate for departures from C/VM2.  The use of elements 
of C/VM2 therefore does not demonstrate equivalence with C/VM2.  
 
Where references to factors included in C/VM2 are made, please amend the FEB to provide 
the justification for their use and, if applicable, the source material.  
 
In addition, given the simplified RSET analysis permitted in C/VM2, please demonstrate that 
the  travel  speeds  applied  are  justified.    In  this  respect,  the  NZFS  observes  that  C/VM2 
explicitly refers to its limitations in respect of egress analysis and, in the comments following 
paragraphs 3.2 and 3.2.5, refers to Section 3 of the SFPE Handbook for further details. 
 
     
2.  Fire-fighting Access and Facilities – Section 10.4 of the FEB proposes that consideration is 
not to be given to the requirements of Clause C5 because the project is proposed under s112 
of the Building Act. 
 
Notwithstanding this opinion, there is a record of communications between the Fire Service’s 
Operational representative and the design team appended to the report.  The statement and 
the evidence are therefore contradictory. 
 
The NZFS observes that the provision of the storage platform represents new works and that 
s17  of  the  Building  Act  requires  new  works  to  comply  in  full  with  the  Building  Code.  
Consequently, the operational needs and safety of firefighters should be considered as part 
of this project. 
 
Please indicate how this issue is to be addressed. 
 
3.  Sleeping Area – The FEB refers to a sleeping firecell in the building.  However, this is not 
apparent in the provided drawings.  Please indicate where the firecell is located and show 
the means of escape from this space. 
 
 
 
 



 
 
 
 
 
 
 
 
  4.  Route Shown on Drawing Fire#3 – Drawing Fire#3 shows a route with an associated distance 
of  63.7m.    Given  the  presence  of  other  doors  in  the  plan  north  elevation  of  the  building, 
please  clarify  whether  this  is  intended  to  represent  a  maximum  open  path  travel  distance 
rather than a dead-end travel distance. 
 
5.  DEOP  Calculation  –  Drawing  Fire#2  shows  a  calculation  comparing  the  DEOP  travel 
distance from a hypothetical platform of area 35m2 with travel distance from the proposed 
platform. 
 
In the context of a scenario involving consideration of RSET, please clarify the relevance of 
this assessment.  
  
As  indicated  above,  the  NZFS  considers  equivalence  to  an  element  of  a  compliance 
methodology  is  not  the  same  as  demonstrating  compliance  with  that  methodology.    In 
particular, given the reference is in the context of an intermediate floor that has an area more 
than 11 times greater than that permitted for storage greater than 3m by C/AS5, paragraph 
4.13.7, the argument for equivalence is considered to be significantly undermined.    
   
6.  Modelling – Challenging Fire – Section 11.0 of the FEB proposes that a “challenging fire” wil  
be modelled to determine the alarm activation  time and will be limited to the extent of the 
platform only. 
 
The NZFS considers that this cannot be represented as a Challenging Fire as there is no 
assessment of tenability conditions in other parts of the warehouse. 
 
Furthermore, given that explicit consideration if either ASET or RSET is beyond the scope of 
the Acceptable Solutions, any reference to these factors requires tenability to be modelled.  
The  terms  of  the  FEB  do  not  suggest  that  this  is  proposed.    Consequently,  the  NZFS 
considers that the proposal neither demonstrates compliance with a recognised Compliance 
Document nor demonstrates compliance with the tenability criteria given in Clause C4.3 of 
the Building Code. 
 
Please indicate how this issue is to be addressed. 
 
To avoid unnecessary iterations of the FEB process the NZFS welcomes discussion on any of the 
above items, however the NZFS recommends that the FEB be revised to address the items identified 
above as well as any additional items identified by other stakeholders. 
Our  review  of  the  information  provided  has  focused  on  the  performance-based  design  elements 
identified  and  is  intended  to  provide  guidance  to  reduce  the  consent  risks  associated  with 
undertaking performance-based design. No assessment against the requirements of the acceptable 
solutions  has  been  undertaken.  Also  please  note  that  this  advice  does  not  imply  a  technical 
verification of the information provided. 
If you have any queries or questions related to the above please do not hesitate to contact me. 
 
Sincerely,  
 
Stephen Lambert 
Fire Engineering Unit 
 
 
 
 


 
 
 
 
 
 
 
 
  
cc:  
Jenny Lilley, Selwyn District Council   
 
[email address] 
 
 
Jonathan Nyman, Fire Review Solutions 
 
[email address] 
 
 
Graton Holding Warehouse 
 
 
 
TBN 
 
Mike Gaskin, NZFS 
 
 
 
 
mike [email address] 
 
Fire Engineering Unit, NZFS   
 
 
[email address] 
 
 
 
 
 

Document Outline