Hi Guys As discussed on site yesterday: · Above ground tanks are acceptable given the temporary nature of the tanks. · I accept a system that is actuated on a time basis in the first instance (with the agreement that we can review this if the overflows at the monitored point increase dramatically) · Given the high level overflow no alarm is required · A gravity connection into the existing sewer system is acceptable · A fence or bollards should be placed around the tanks to protect them from car accidents · Please confirm the calcs used to size the tanks for our records · Myself and Charles will undertake site visits during the construction · Please copy myself in when you submit water supply application forms and I will assist with pushing those through I hope that this covers off the issues that we discussed but if not please let me know. Regards Ryan Rose Manager - Land Development Tel 04 912 4400 DDI 04 912 4457 [mobile number] Private Bag 39804, Wellington Mail Centre 5045 Level 4, IBM House, 25 Victoria Street, Petone, Lower Hutt www.wellingtonwater.co.nz