This is an HTML version of an attachment to the Official Information request 'Request for the contract with Opus International Consultants Ltd for "Wellington Cycleway Feasibility Study - Island Bay to CBD"'.


 
 
Cycling in Wellington 
- Feasibility Studies 
 
Offer of Service 

 
 



 
Cycling Feasibility Studies – Offer of Service 

 
Contents 
Wellington Cycling Feasibility Studies ........................................................................1 
1 
Understanding the Brief ......................................................................................1 
2 
Project Team .......................................................................................................1 
2.1 
Roger Burra – Project Manager ........................................................................................... 2 
2.2  Andrew Martindale – Transportation Engineer ................................................................. 3 
2.3  Peter Kortegast – Walking and Cycling Specialist .............................................................. 3 
2.4  Opus Support Team .............................................................................................................. 4 
3 
Methodology ...................................................................................................... 5 
3.1 
Preliminary Funding Assessment ........................................................................................ 5 
3.2  Confirm Scheme Objectives .................................................................................................. 7 
3.3  Information Gathering and Desktop Analysis .................................................................... 7 
3.4  Confirm Option Assessment Criteria ................................................................................... 8 
3.5 
Option Identification & Site Visits ..................................................................................... 10 
3.6  Stakeholder Meetings........................................................................................................... 12 
3.7 
Options Assessment ............................................................................................................. 12 
3.8  Feasibility Cost Estimate(s) ................................................................................................. 12 
3.9  Finalise Funding Assessment & Reporting ........................................................................ 13 
4 
Fee Proposal & Programme ...............................................................................14 
4.1 
Programme ........................................................................................................................... 15 
 
Figure 1: Example of Level Change and Gradient Plots from Google Maps (From left to right: Basin 
Reserve to Island Bay via Adelaide Road and The Parade) ................................................................... 8 
 
Table 1: Data Requirements ..................................................................................................................... 7 
Table 2: Possible Assessment Criteria ..................................................................................................... 9 
Table 3 – Fee Proposal Schedule (Excluding GST) ...............................................................................14 
Table 4 – Total Hours by Team Member as a proportion of Total Hours ........................................... 15 
 
 

 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies – Offer of Service 
ii 
 
 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 

 
Wellington Cycling Feasibility Studies 

Understanding the Brief 
The Wellington City Council (WCC) has requested a proposal to assess the feasibility of three 
cycleway proposals in Wellington: 
• 
Island Bay to Wellington CBD; 
• 
Great Harbour Way (Ngauranga to Wellington CBD); and 
• 
Great Harbour Way (Lyall Bay to Owhiro Bay). 
For each of the projects we will identify the most viable facility type and route option.  For these 
projects we understand that feasibility is closely linked to the ability to attract funds from the 
NZTA.  Our primary assessment criteria will therefore be the extent to which each scheme meets 
the NZTA’s funding criteria.  This will help WCC to prioritise the implementation of each cycleway 
and to identify their contribution to the implementation costs. 
We see the NZTA Planning and Investment Team as the main audience for this work.  We also 
appreciate that the assessment will be subject to close scrutiny from City Councillors and other 
community leaders (e.g. Great Harbour Way Coalition Steering Group).  We will therefore provide 
easy to understand justification for our conclusions and recommendations.   
Many people in the community are already thinking about these projects, providing an opportunity 
to tap into their ideas and aspirations.  We’ll do this through the stakeholder workshops we 
propose mid-way through the study.  Our assessment will address all of their suggestions, quickly 
focusing on the ideas most likely to attract NZTA funding.  We will clearly communicate what 
alternatives have been considered and why certain options are preferred above others. 
We see collaboration with WCC officers as crucial to the success of the project.  By tapping into 
their experience and existing links with the community we will be able to streamline the project, 
ensuring delivery before the end of February 2013. 
The rest of this document explains how we propose to deliver options for walking and cycling 
facilities that are practical, functional and most likely to attract the necessary funding.  We are 
suggesting a value-engineering approach that we believe is appropriate for today’s economic 
climate. 
2  Project Team 
We have structured our team to create the right balance between providing local knowledge and 
the specialist skills Opus is able to offer.  Our core project team is based in the Majestic Centre, has 
previously planned walking and cycling facilities in Wellington and developed successful funding 
applications to the NZTA.  We are complementing their skills with Peter Kortegast, a well-known 
New Zealand walking and cycling specialist.  We also have a wider team with the right experience 
to support the project should Opus be appointed to assess the feasibility of all three projects. 
  |  2 November 2012 
Opus International Consultants Ltd
 


 
Cycling Feasibility Studies Offer of Service 

 
Roger Burra will lead and administer the project for Opus. He will also be the main point of contact 
for WCC officers and the different community stakeholders that could be involved.  Roger has been 
working in New Zealand for 6 years and has extensive experience in walking and cycling initiatives. 
Roger will energise the project and as an active cyclist will add a real-life perspective.  His day-to-
day experiences mean that he is keenly aware of the design influences and issues faced by both 
commuter and recreational cyclists. 
Roger will work with Transport Engineer, Andrew Martindale.  Andrew’s role will be to complete 
the assessment, economics and funding justification work.  Having been involved in other walking 
and cycling projects around the country Andrew is skilful in the application of the NZTA’s 
economic evaluation procedures and the knowledgeable of the NZTA criteria which need to be met 
to secure funding. 
We have nominated Peter Kortegast as our internal reviewer.  Opus routinely undertakes internal 
technical reviews for all its projects.  Peter will undertake internal reviews at least three times 
during the project: 
a.  Early (10%) review confirming clients’ requirements and ensuring the methodology or concepts 
adopted for the project are appropriate; 
b.  mid-project (50%) review to assess the extent to which client’s needs are being met; timed to 
enable any changes to take effect and have a positive impact; and 
c.  final (90%) review before close-out to ensure the project is delivering. 
Formally Nelson City Council’s cycling officer; Peter is a highly experienced sustainable transport 
specialist. Peter will bring his wealth of knowledge to the core project team and help shape the 
work and analysis that is being completed.  
A summary of the core team is provided below.  We understand that we may be asked to work on 
one or more of the cycling projects.  We have identified some of the wider Opus team with the right 
skills and availability to support the core team should the need arise.  CVs can be provided on 
request.  The wider team are presented in section 2.4. 
2.1  Roger Burra – Project Manager 
BE (Hons) Civil, Wellington Transport Planning Team Leader, Affiliate Member of the IPENZ 
Transportation Group 

Roger has worked in the transportation sector for fourteen years.  With an 
honours degree in Civil Engineering, Roger comfortably performs in transport 
planning and traffic engineering roles.  His project experience reaches from 
design of traffic management schemes and local road improvements to strategic 
transport strategy studies. 
Roger is able to generate the sense of urgency needed to deliver the project before 
the end of February 2013.  Roger is a practiced team leader whose strengths lie in 
identifying realistic and deliverable transport improvement opportunities.  Roger 
is proud that many of the projects he has led are now being built, including some of those identified 
in the Ngauranga to Airport Strategy Study.  
Roger enjoys working on walking and cycling projects.  He and Andrew worked well together to 
develop the vision and an ultimately successful funding application for the Porirua Stream Shared 
  |  2 November 2012 
Opus International Consultants Ltd
 


 
Cycling Feasibility Studies Offer of Service 

 
Path in Tawa.  They also worked together on funding applications for Road Safety Improvements in 
Wellington.  For the former Manukau City Council, Roger developed a business case for increase 
the level of service for pedestrians and cyclists on bridges being replaced as part of a KiwiRail 
electrification project.  More recently he has been involved in a proposed national cycle trail 
between the Wairarapa and Manawatu Regions.  
In 2010, together with Peter Kortegast, Roger planned and facilitated a professional TDM planning 
and design workshop in Wellington.  Celia Wade-Brown in her (then) capacity as President of 
Living Streets Aotearoa, gave the key note address. 
2.2  Andrew Martindale – Transportation Engineer 
BE (Hons) Civil, GIPENZ, Member of the IPENZ Transportation Group 
Andrew has five years’ experience working as a Transportation Engineer within our Wellington 
office. During this time his responsibilities have included project managing and undertaking tasks 
within the fields of traffic engineering, transport planning, traffic modelling, transport economics 
and road safety. Working within these disciplines, Andrew has undertaken a number of NZTA, 
local government and private sector projects.  This has included WCC cycling, walking and road 
safety assessments such as the Porirua Stream Shared Path and the Adelaide Road Growth Node 
Transport Options Assessment. He assisted WCC in the preparation of recent road safety funding 
applications. This work has required a detailed understanding of NZTA’s Economics Evaluation 
Manual, Pedestrian and Cyclist forecasting and NZTA’s funding assessment criteria. 
2.3  Peter Kortegast – Walking and Cycling Specialist 
BE (Civil), ITE member, Member of the IPENZ Transportation Group  
Peter is a sustainable transportation specialist with over 25 
years of international experience and perspective to 
sustainability discussions.  As well as New Zealand, he has 
worked in Australasia, United Kingdom and North America. 
He has worked for both the public service as well as in the 
private sector.  
Peter is the immediate past president of the Living Streets 
Aotearoa national walking advocacy organisation of New 
Zealand.  Examples of the projects for which he has provided 
transportation advice include: 
• 
the Nelson City Cycle network; 
• 
Safer Routes Studies; 
• 
the Alps to Ocean National Cycle Trail; and 
• 
cycling infrastructure upgrades in Canada.  
 
Peter is recognised as being a leader in cycle infrastructure and pedestrian facility design and 
specialises in designing sustainable schools. Earlier in 2012 he presented and attended the 
International Velocity Conference in Vancouver, British Columbia, Canada. Peter has a passion for 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 

 
liveable communities and engaging urban form, which provides human scale framework that 
encourages health life choices. He is a regular speaker at national and international conferences. 
2.4  Opus Support Team 
In order to deliver the three projects, the core team will draw support from other Wellington-based 
staff with experience of walking and cycling assessment and design. 
2.4.1 
Cathy Crooks – Transport Planner 
BA (Hons) Geography 
Cathy has 13 years’ experience working in the planning and transport sectors in New Zealand and 
the United Kingdom, and has a particular interest in active and sustainable modes of transport. 
Whilst working for Opus in the United Kingdom, Cathy completed Cycle Route Inspection and 
Stakeholder Plans (CRISPs) for three busy cycling routes in West London. This work included 
assessing existing facilities, consulting with stakeholders and prioritising improvement options. 
2.4.2 
Sarah Baxter – Transport Engineer 
BE (Civil), GIPENZ, Member of the IPENZ Transportation Group 
Sarah is a transportation engineer and has 7 years’ experience working in New Zealand and the 
United Kingdom. She has worked on a variety or cycling projects in the UK, including managing 
the implementation of London Cycling Network (LCN+) Routes in the London Borough of 
Hammersmith and Fulham.  She was also involved in investigating, designing and implementing 
individual schemes within the borough. 
2.4.3 
Other Support Staff  
The team will also draw on the other support staff as follows: 
• 
David Dunlop: Project Director (14 Years); 
• 
Jasmin Callosa-Tarr: Geographical Information Systems Analyst (17 Years); 
• 
Nick Cooper: RMA Planning Consultant (11 Years); and 
• 
Ron McFadyen: Civil Engineer (31 Years). 
 
 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 

 
3  Methodology 
The underlying objective of this study is to identify cycleway options that will meet the NZTA’s 
funding criteria as well as meeting the project objectives.  We propose a value-engineering 
approach starting from the NZTA funding criteria and working backwards to find options that best 
meet them.  The NZTA are looking for projects that: 
• 
give effect to the Government’s Policy for Land Transport Funding (e.g. safety improvement 
and congestion relief on busy urban corridors); 
• 
take account of any relevant local or regional strategies or policies; 
• 
contribute to the objectives of the Land Transport management Act; 
• 
have been assessed against other options and alternatives; 
• 
comply with the consultation requirements of the LTMA; and 
• 
achieve the above in the most economically efficient way (i.e. Benefit to Cost Ratios) 
We’ll identify what it takes to meet the above criteria for each cycleway corridor and use the 
findings to guide and optimise our option identification process.  We’ll then update and add detail 
to our final assessment for the option that best meets the above criteria.  We’ll use additional 
selection criteria (e.g. cost, level of service, etc.), agreed with stakeholder organisations in advance, 
to choose between options or routes. 
The following is an overview of the tasks we’d complete: 
• 
preliminary assessment of each corridor against NZTA funding criteria to identify opportunities 
(including preliminary demand forecast and monetised user benefits evaluation); 
• 
confirm objectives for each cycleway proposal; 
• 
route information gathering and desktop analysis; 
• 
prepare draft option assessment framework / criteria; 
• 
option identification and bicycle-based site visit involving WCC officers; 
• 
meeting with WCC officers and stakeholders to: 
»  present the study methodology, 
»  confirm the cycleway objectives, 
»  gather user information, and 
»  seek feedback on proposed option assessment criteria; 
• 
analyse and compare options, where appropriate using GIS (e.g. CBD to Island Bay) to 
distinguish between route options; 
• 
identify the preferred route based on NZTA funding and project option evaluation criteria; and 
• 
report the findings. 
 
The following sections elaborate on the tasks  
3.1  Preliminary Funding Assessment 
The NZTA Planning, Programming and Funding Manual (2008) provides detailed guidance on the 
criteria that should be met before projects are funded.  Roger and Andrew are familiar with the 
requirements, and particularly those for walking and cycling projects.  They will review each of the 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 

 
three projects to determine the extent to which it will be able to meet the NZTA criteria.  This will 
involve both a policy assessment as well as a preliminary demand forecast.  Initial effort will be 
placed on identifying the potential for each project to: 
• 
address an existing road safety problem; and 
• 
provide congestion relief (mode-shift). 
3.1.1 
Preliminary Assessment of Historic Crash Record 
This task will review the crash history for each corridor and determine the crashes that could be 
avoided or reduced in severity if the projects were implemented.  Using the values presented in the 
NZTA’s Economic Evaluation Manual (EEM) we will determine a preliminary cost for these crashes 
and estimate the potential saving from different types of intervention. 
3.1.2 
Preliminary Demand Forecasts 
The team will adopt and combine various methods of forecasting demand for the various types of 
user the project is likely to attract.  Roger and Andrew will start by considering the possible types of 
user (e.g. commuter, utility and leisure / experienced and new-users / age).  Different forecasting 
methods may need to be adopted for each user-type.  They will qualitatively assess the extent to 
which these are new cyclists or existing cyclists that have adjusted their route.  Josephine Draper of 
the NZTA Highways Network Operations has agreed to supply information regarding user 
preferences for cyclists that currently travel along SH2 between Petone and Ngauranga as an input 
to our forecasting.  These will help the project team understand how existing cyclists would 
respond to potential infrastructure changes. 
Previously Roger and Andrew have successfully applied commuter based cycling demand forecast 
models to projects in Wellington (i.e. Porirua Stream Shared Path).  This method is based on 
guidance from the EEM.  The Greater Wellington Regional Council TDM team have agreed to 
provide business travel survey information to the project team.  This may be useful in 
understanding suppressed demand for cycling.  
They will also assess the likely use of each project for utility trips.  This forecasting method will be 
more subjective and based on the size of the trip ends within cycling distance of each project.  We 
will use GIS analysis to aid the development of the utility and commuter cyclist forecasts.  
The projects would also attract some types of leisure cyclist.  Our methodology for forecasting 
leisure users will be largely reliant on historic data collected for other trails.  Following his 
contribution to the business case for the Tararua Traverse (mountain bike route) in 2012, Roger 
has access to datasets for various types of cycling routes (some urban) throughout New Zealand.  
We will seek to compliment this with additional data from Simon Kennett and /or the National 
Cycle Trails Programme.  We also have access to continuous monitoring datasets for similar routes 
in Nelson City.  Other datasets that we anticipate will be available include: 
• 
2006 Census Travel to Work Data; and 
• 
Wellington City Council CBD Cordon and Cycling Monitoring Data. 
3.1.3 
Preliminary Assessment Outcomes 
This preliminary assessment will allow the project team to understand the funding potential for 
each route.  More importantly it will identify any weaknesses and opportunities associated with 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 

 
each project that need to be exploited.  This understanding will guide the development of options 
and feed into options assessment. 
3.2  Confirm Scheme Objectives 
Work undertaken by Boffa Miskell on behalf of the Great Harbour Way Steering Group presents 
Guiding Principles / Objectives.  We will review existing documentation relating to each project in 
order to identify and confirm the objectives for each project.  Limited resource is required for this 
task however we will spend a little time confirming how we will assess the extent to which the 
projects are aligned with these objectives.  
3.3  Information Gathering and Desktop Analysis 
This task involves gathering data necessary to identify possible route options and assess the 
alternative facility types.  We anticipate that our assessment will rely predominantly on existing 
data, some of which is referred to in section 3.1.  We anticipate that much of this data will be 
readily available from WCC officers through the use of existing GIS layers, databases and WCC 
officers commissioned reports.  Table 1 lists these datasets and includes information held by Opus.  
We will manage the data collected in GIS.  This will allow us to visually manipulate the data to 
identify appropriate routes and / or pinch-points on predefined routes.  
Table 1: Data Requirements 
Data 
Availability 
Existing 
We are aware that WCC officers have completed a number of cycle and pedestrian 
Pedestrian and 
counts in 2012.  There are some count sites where cyclist numbers have been recorded 
Cycling Volumes 
for the past ten years.  We request that this information is provided. 
We anticipate that we will also be able to use counts undertaken for other projects (for 
example the Basin Reserve Scheme Assessment).  In the unlikely event that additional 
count data is required, we will agree a fee before they are initiated. 
Vehicle Volumes 
Estimated 2011 traffic volumes can be extrapolated from the Wellington Transport 
Model (WTM). Opus currently manages this SATURN based traffic model.  If required, 
the modelled traffic flows can be validated by comparing them against actual counts. 
It is noted that the SATURN network may not represent all the roads required for the 
cycle lane analysis. This is particularly true for some low volume, local streets or cul-de-
sacs. In such instances it is proposed that traffic volumes are extracted from NZTA’s 
Crash Analysis System or WCC’s RAMM dataset to supplement the SATURN results in 
isolated instances. 
Mesh-Block Data 
Commuter mode use and other demographic information will be extracted from the 
readily available 2006 census. While it is accepted the information may out of date, no 
2011 census occurred. The 2006 data is therefore the most recent and is widely used on 
other cycleway analysis projects. 
Road Length 
GIS layer already available. 
Gradient 
Contour GIS layers available. All average and maximum gradients of the road network 
will be calculated.  We will also investigate the potential for using information from 
Google maps (see Figure 1) 
  |  2 November 2012 
Opus International Consultants Ltd
 



 
Cycling Feasibility Studies Offer of Service 

 
Data 
Availability 
Crash History 
Will be taken from NZTA’s Crash Analysis System for the five year period between 
06/2007 to 06/2012. This is the most recent data that is applicable. 
Road Reserve 
GIS layer already available.  Where appropriate, we will also use aerial photographs to 
Boundaries 
evaluate the existing carriageway and footway widths.  These measurements will, to a 
certain extent be verified during a site visit (refer to section 3.5.3). 
 
Figure 1: Example of Level Change and Gradient Plots from Google Maps (From left to right: Basin 
Reserve to Island Bay via Adelaide Road and The Parade) 

 
 
 
3.3.1 
Cyclist Counts 
The business case for funding feasibility of projects is influenced by the extent to which they reduce 
the numbers of existing users involved in crashes as well as the potential for future users to be 
involved in crashes.  It would therefore be necessary to develop an indicator such as crashes per 
cyclist- km.  
The business case is also influenced by the extent to which the projects address congestion.  
Understanding the times of day when existing cyclists use each corridor provides a baseline for 
forecasting the different types of potential future users.   
We therefore believe that cycle count data is required if the feasibility assessment is to be taken 
seriously.  Counts may be undertaken manually or using automatic counting equipment.  Assuming 
a survey (two days minimum) of one location on each route corridor is undertaken, we recommend 
including a provisional sum for data collection of $6,000 (for the three routes).  The exact 
methodology and pricing will be agreed with WCC officers at inception. 
3.4  Confirm Option Assessment Criteria 
Draft option assessment criteria should be developed and agreed with WCC officers before routes 
and options are developed.  This will prevent preconceptions from influencing their formation.  
Possible assessment criteria are listed in Table 2, below.  These will be developed further in 
collaboration with WCC officers before being tested with stakeholders.   
For sections of the Great Harbour Way, there is little route choice and options assessment will be 
predominantly focused on facility type.  The assessment of Island Bay to the CBD will require 
consideration of both route and facility type.  Table 2 provides a preliminary indication of which 
criteria are applicable in each situation. 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 

 
Table 2: Possible Assessment Criteria 
Possible Assessment 
Comment 
Route 
Criteria 
Selection or 
Facility Type? 

Route Length 
Indicator for assessing how direct a route is.  Requires 
Route & Facility 
understanding of possible trip ends. 
Available Width 
The ability of new cyclists to be safely and comfortably 
Route & Facility 
accommodated. 
Topography 
Cycling facilities with minimal level changes and low 
Route 
gradients are more attractive, particularly for new cyclists. 
(Level Differences / 
Grades, Lengths of 
Maximum Grades) 
Crime Prevention 
Subjective assessment by Urban Designers of route 
Route 
Through Environmental 
attributes such as amenity and sense of personal security 
Design (CPTED) 
(existing lighting etc). 
Directness / Continuity / 
Direct routes with fewer corners or turns are easier to 
Route 
Legibility 
cycle on, more convenient and more intuitive.  
Proximity to Major / 
e.g. schools, hospitals, shopping areas etc 
Route 
Identified Trip Generators 
Traffic Volume 
Routes with lower motorised traffic flows will reduce the 
Route 
safety hazard for cyclists and improve the amenity, 
particularly for new users.  
Pedestrian / Cyclist Crash 
The number and location of crashes along the selected 
Route & Facility 
History 
routes.  Indicator for the safety of a route except that 
pedestrian and cyclist crashes are often unreported.  
Hazardous Intersections 
Engineering assessment to identify intersections with high  Route (& Facility) 
traffic volumes and / or significant crash histories.  Refer 
to Work completed for WCC by Abley Transportation 
Engineers. 
Consents Required 
The need for, ease and likely costs associated with 
Route & Facility 
obtaining consents. 
Cost 
Feasibility Estimate for route sections and / or options. 
Route & Facility 
Cycling Level of Service 
 
Route & Facility 
(LOS) 
Effect on Other Road 
Consider Traffic Effects or Parking Supply 
Route & Facility 
Users 
 
In consultation with WCC officers, we will divide each project into mutually exclusive sections.  
This was very useful for the Porirua Stream Shared Path and ensured that the assessment was well 
structured.  When undertaking the assessment we will present findings for each option / route 
section using an appraisal summary table.  We will also use GIS to present the whole route analysis 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 
10 
 
visually.  Whole route criteria, such as route consistency will be an important factor where 
confirming the assessment and may to a certain extent over-ride route section criteria.  
When applying the assessment framework we will also need to keep in mind the NZTA funding 
criteria.  Except value engineering / economic efficiency (BCR), these are most relevant for the 
whole route, rather than individual sections. 
3.5  Option Identification & Site Visits 
Each of the three cycleway proposals may be achieved with different facility types and to a much 
lesser extent by alternative route options.  Of the three, the Island Bay to CBD proposal has the 
most scope for alternative routes and will require the most resource for developing options and 
assessing them. 
3.5.1 
Routes 
Initially this will be a desk-top, map based exercise.  We’ll be able to streamline the route 
identification process by reviewing the work of others.  The Island Bay to CBD cycleway could be 
accommodated on a range of different routes: both on-road and off-road.   
We will divide the routes down into mutual-exclusive sections as was adopted for the Porirua 
Stream Shared path. In this way an optimised performance achieving the maximum value for 
money and practicality can be achieved.  
For each of the three projects, the feasibility of different possible routes will be analysed under the 
assessment criteria attributes listed in Table 2. Using GIS, the interaction between these attributes 
will allow for the preferred route alignments to be easily identified.  GIS will enable the results to 
be displayed visually, greatly assisting the justification of one route over another to key community 
groups and stakeholders. 
The Great Harbour Way proposal between Ngauranga and Bunny Street has limited route choice. 
Either the route must cross underneath the motorway and tie into an improved version of the 
current facility down Hutt Road and Thorndon Quay.  Alternatively the cycleway could follow the 
waterfront, go through the ferry terminal and re-emerge down Aotea and Waterloo Quay. Either 
route will encounter difficulty in achieving the desired link around the waterfront. There will be 
major complications around the ferry terminal which will need to be accounted for.  The 
assessment criteria will help to determine the most appropriate route and facility type.  This is 
where well defined project objectives will aid the assessment. 
Only one route is possible on the Great Harbour Way project from Stewart Duff Drive to the car 
park at the western end of Owhiro Bay Parade. In following the south coast there is barely any 
scope for alternative routes.  The options will be the type of on or off-road facilities than can be 
accommodated. 
3.5.2 
Type of Facility 
Our project team has implemented a range of different cycling facilities around the country and 
overseas. As well as considering options we’ve previously implemented and those presented in NZ 
guidance, we’ll also look to our network of offices around the world.  We’ll draw on the experience 
of specialists such as Peter Kortegast, who earlier this year attended and presented at the 
International Velocity Conference in Vancouver. 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 
11 
 
The type of facility will be guided by the type of user that: 
a.  would be naturally be attracted to the route (e.g. is it a commuter route); 
b.  needs to be attracted to the route in order to meet the NZTA funding criteria; and / or 
c.  can feasibly be constructed (e.g. land and / or cost constraints may limit the type of facility that 
is possible). 
The options development work will focus on cycleway and / or road cross sections and consider the 
need and ability to: 
• 
separate cyclist by direction; 
• 
separate cyclists from other road users (pedestrians, motorised traffic or parked cars); and 
• 
provide adequate width for overtaking cyclists. 
We do not believe in a “one size fits all” approach and will seek to determine practical options that 
can be implemented cost effectively. This could mean different facilities are provided on different 
sections of the cycleway routes as long as is not to the detriment of the route in terms of 
consistency.  We may also identify opportunities to stage implementation. 
Analysis of facility types will be based on the road reserve cross-sections. This will be heavily 
influenced by features such as property, existing road widths, parking demands and coastal edge 
lines.  We anticipate that the outputs to this analysis will be predominantly visual. 
3.5.3 
Site Visits 
Following the desktop analysis we propose to undertake a site-visit to view the proposed corridors.  
This is largely intended to confirm some of the more qualitative attributes of the different routes.  
We propose to undertake the site visit in the form of a “cycle over’.  We envisage that the site visit 
will involve WCC officers.  It will provide the opportunity to: 
• 
clarify issues identified during the information gathering and desktop analysis stage; 
• 
pick-up issues that were not identified during the desktop analysis; 
• 
view the physical and environmental constraints;  
• 
observe pinch-points or problem areas; and  
• 
where appropriate, view the most promising route options. 
The site visit will, except where current terrain prevents, be undertaken by bicycle.  The main 
benefit of the visit will be to provide the team with a much a greater appreciation of the “feel” of the 
ride and the difficulties specifically associated with travel by bicycle.  This is particularly true for 
tight narrow roads, conflicts at major intersections and any grade issues that might make the 
routes less practical than they initially appear.  
While Opus will manage all aspects of the site visits (including health and safety), we will also 
encourage WCC officers to attend.  An agenda and timing will be developed before the visit so that 
most effective use of time will be made.  While not currently anticipated, further site visits may be 
required where more detailed information is required.   
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 
12 
 
3.6  Stakeholder Meetings 
Following inception we will draft a letter which can be sent by WCC to interested stakeholders.  The 
letter will inform stakeholders the study is underway, advise of the aim of the study and the 
methodology adopted.  Stakeholder meetings are proposed after the project team has had the 
opportunity to: 
• 
collate and understand the background data; 
• 
develop a draft evaluation framework; 
• 
identify possible options; and 
• 
travel the corridors by bicycle.  
The purpose of the meetings is to report on progress.  It will also provide the opportunity for the 
project team to listen to and take account of feedback from the project team on the proposed 
evaluation method and, where appropriate, on the possible routes. 
We envisage that the meetings will be attended by WCC officers with inputs or a presentation from 
Roger Burra.  To help the meetings function effectively we will provide an agenda explaining the 
purpose and meeting outline.  This can be circulated in advance.  We have allowed for three 
stakeholder meetings.  A separate meeting with: 
• 
Great Harbour Way Steering Committee;  
• 
Cycle Aware Wellington;  
• 
a representative of the Architectural School / Newtown Residents Association; and 
• 
GWRC. 
3.7  Options Assessment 
Our starting point will be to identify every conceivable possibility at a high level and then quickly 
narrow the list down to options that: 
• 
are achievable given the physical and environmental constraints; 
• 
have most potential to meet the NZTA funding criteria; 
• 
best meet the achieve the project objectives (i.e. Great Harbour Way Vision); and 
• 
provide the optimal level of service for the available funding (value for money). 
The options assessment will rely on the application of the assessment framework described in 
section 3.4.  It will be evidence based.  We will summarise our assessment using Appraisal 
Summary Tables that allow quick and easy comparison of options.  Wherever possible we will use 
visual outputs (e.g. colour coded plans and / or cross sections) to present our findings. 
3.8  Feasibility Cost Estimate(s) 
We will, in consultation with WCC officers, develop unit cost estimates (e.g. per metre).  These will 
be used to distinguish between alternative options which provide the same or a similar level of 
service.  We will develop feasibility estimates with assessed risk profiles, only for the preferred 
options.  These will be needed for the NZTA funding applications.  We have identified Ron 
McFadyen, who brings more than 20 years construction experience to lead these tasks. 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 
13 
 
3.9  Finalise Funding Assessment & Reporting 
The final output of this study will be a report structured to support an application to the NZTA for 
funding support.  The main audience of the report will be the NZTA.  It will be structured to quickly 
and easily provide the information needed within the application.   
After the preferred option is identified and before finalising the funding application it will be 
necessary to re-visit and update the forecast (referred to in section 3.1): 
• 
new users; and 
• 
user benefits ($). 
We will use the LTP on-line forms as a guide to structuring our final report.  
 
 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 
14 
 
4  Fee Proposal & Programme 
Table 3 shows the fee (excluding GST) for each element of the projects.  The table shows the fee for 
undertaking each project independently as well as the fee for undertaking all of the projects 
together as one.  If the projects are undertaken separately we believe there will be a significant 
amount of duplication in terms of management, scoping and reporting.  This is highlighted in the 
right hand column of the table.   
Should the work be procured as one study, we propose to prepare three reports as a final output.  
Table 3 – Fee Proposal Schedule (Excluding GST)  
Task / Activity 
Proj 1: CBD to 
Proj 2: 
Proj 3: Lyall to 
All Projects 
Saving 
Island Bay 
Ngauranga to 
Owhiro Bay 
CBD 
Project Management (incl. 
$3,100.80  
$2,907.00  
$2,907.00  
$5,059.20  
$3,855.60  
Progress Meetings / Reports) 
Internal Technical Review & 
$5,344.00  
$3,129.00  
$3,129.00  
$9,604.80  
$1,997.20  
Verification 
Preliminary Funding 
$9,960.00  
$7,038.00  
$5,214.00  
$15,422.40  
$6,789.60  
Assessment 
Data Collation & Preliminary 
$15,616.80  
$3,782.00  
$3,782.00  
$20,080.80  
$3,100.00  
Evaluation Framework 
Option Identification and Site 
$4,293.20  
$2,600.00  
$2,600.00  
$8,590.80  
$902.40  
Visit 
Stakeholder Meeting (include. 
$3,288.00  
$3,082.50  
$3,082.50  
$4,376.00  
$5,077.00  
Preparation and Notes) 
Options Assessment & Cost 
$5,494.40  
$5,151.00  
$6,987.00  
$10,771.20  
$6,861.20  
Estimating 
Develop Funding Application 
$8,508.80  
$4,677.00  
$4,677.00  
$15,440.00  
$2,422.80  
 
 
 
 
 
 
Total 
$55,606.00 
$32,366.50 
$32,378.50 
$89,345.20 
$31,005.80 
 
 
 
 
 
 
Provisional Sum:  
$2,000.00  
$2,000.00  
$2,000.00  
$6,000.00  

Pedestrian / Cyclist Surveys 
Total with Provisional Sum 
$57,606.00 
$34,366.50 
$34,378.50 
$93,845.20 
$31,005.80 
 
This fee proposal assumes that there will be an inception meeting, weekly progress reports or a 
short meeting.  It also assumes that the WCC project manager will attend each of the three 
technical reviews at 10%, 50% and 90% completion. 
If the three studies are procured separately, it will be important for WCC officers to consider the 
consistency of each methodology.  This will be particularly important if funding applications are 
submitted to the NZTA at the same time. 
  |  2 November 2012 
Opus International Consultants Ltd
 

 
Cycling Feasibility Studies Offer of Service 
15 
 
Table 4 shows the hours we have allowed for each staff member as a proportion of the total 
resource.  It relates to the allocation of hours if all three projects are awarded.  For the most part 
the balance of hours is similar for each of the projects except that a greater allowance is made for 
data collation and GIS analysis for the Island Bay to CBD proposal.  
Table 4 – Total Hours by Team Member as a proportion of Total Hours 
Team Member 
Project Role 
Proportion of Total Hours 
David Dunlop 
Project Director 
1% 
Roger Burra 
Project Leader 
22% 
Andrew Martindale 
Transportation Engineer 
42% 
Peter Kortegast 
Internal Challenge / Technical Review 
5% 
Jasmin Calossa-Tarr 
GIS Specialist 
17% 
Ron McFadyen 
Cost Estimating 
6% 
Other Support Staff 
7% 
Total 
100% 
 
Our hourly charge out rates (excl. GST) for additional services beyond the scope outlined in this 
report are: 
Team Member 
Hourly Charge-out Rate for 
Additional Services (excl. GST) 
David Dunlop 
$265 
Roger Burra 
$190 
Andrew Martindale 
$135 
Peter Kortegast 
$210 
Jasmin Calossa-Tarr 
$160 
Ron McFadyen 
$190 
Technician Support 
$110 
 
4.1  Programme 
We confirm that we will be able to deliver the final reports before the end of February.  We will 
organise the stakeholder workshops in the week commencing 4th February 2011. 
.
  |  2 November 2012 
Opus International Consultants Ltd
 

 
 
 
 
Opus International Consultants Ltd 
L7, Majestic Centre, 100 Willis St 
PO Box 12 003, Wellington 6144 
New Zealand 
 
t:  +64 4 471 7000 
f:  +64 4 471 1397 
w:  www.opus.co.nz