Integrated Fares
Project Control Group Meeting
Monday 13th July 2015
Family offering – options analysis
Day Pass – technical decision – impact on proposition
Orakei station
Technical solution status
2
Decisions required
1. Family offering- Select preferred technical
option/proposition
2. Day pass – approve changed proposition due to technical
approach
3. Orakei train station – stay within Isthmus zone or move to
City Zone
3
Family offering - proposition
•
Proposition – in our public consultation, the family offering was described as:
Family weekender
2 children free with every AT HOP paying adult on weekends and public holidays
•
Proposition very positively received during the consultation
•
Important we don’t refer to this as a “pass” as this has connotations that you have
to purchase something
•
What is a “AT HOP paying adult”
•
Does this apply to Super Gold passengers (Grandad travelling with grand-
children on weekends)?
•
Does this apply to Students (uni student with brother/sister)?
•
Does this apply to a Day Pass or Month Pass user?
•
Does this apply to a cash ticket purchaser?
•
No specific development is being done by Thales for a family offering, so we must
utilise existing (or upcoming) system capabilities
4
Family offering – options (1)
• 3 potential technical approaches have been identified:
#
Option
Description
1
Children off system
Children travel with an adult
-
Bus – adult tags on, child gets “count key”
-
Rail – adult goes through gate, kids go around
2
Kids free with AT HOP
Children must have an AT HOP card, with child profile
loaded (registered) – then can use PT
3
Paper ticket
Purchase paper ticket which allows 1 adult and 2
children.
5
Family offering – options (2)
• Each of the 3 options has some benefits and issues
#
Option
Positive
Negative
1
Children Off system
Consistent with messaging in public
×
Problems with gates
consultation
×
Difficult to capture patronage (non-gated to
non-gated train station)
×
Increased risk of abuse – “that’s my dad
there!”
2
Kids free with AT HOP
Promotes uptake of AT HOP – on-going
×
Different proposition than what was
“customer lifecycle” benefits
consulted on
Fully capture patronage and origin-
×
Revenue leakage of unaccompanied
destination data
children travel on PT ($100-$300K p.a)
No issues with gate lines in train stations
×
Having to purchase a card ($10) and put
$5 on it may be a barrier for infrequent PT
users (and can we call it free travel?)
3
Paper ticket
Simple proposition for existing or new users ×
No origin-destination data
of PT
×
No ability to limit availability of the ticket to
Consistent with messaging in public
just weekends and public holidays
consultation
DECISION – Select preferred option.
6
Day Pass – changed proposition
• As you know, we are going from the current 2 day passes to a single all-
zone bus/rail and inner harbour ferry pass for $18 per day
• The current day passes have fixed apportionment at sale – all revenue
is apportioned according to agreed percentages
•
This method of apportionment does not support PTOM
• We are proposing to change the current day pass to utilise the same
apportionment/settlement functionality as current month passes –
scheme-based apportionment based on actual travel
• This will require a change to the proposition as the day pass will need to
be limited to the day when it is first activated, not a sliding 24 hour
timeframe as with the current pass
•
See in the next slide likely impact on users
7
Day Pass – usage analysis
• 2,180 day passes sold on 1,136 cards between 1 May and 15 June
• 72% activated in the morning, 83% last tag on in the afternoon
• 25% of cards are used on 2 days
DECISION – Approved change proposition
8
Orakei Station
•
During the consultation we received substantial feedback on the increase in fare from Orakei train
station (1 stage to 2 zone)
•
Barry Mein has written a paper outlining this issue, potential options to resolved (attached).
Option
Simplicity
Equity
Impact on
Impact on travel
Revenue impacts
existing
behaviour
customers
1. Current proposal (Orakei in
√
√
X
√
√
Isthmus Zone)
2. Orakei station in City Zone
X
X
√
X
X
3. Shift City Zone boundary east
X
X
√
X
X
4. Orakei Station as a zone overlap
X
X
√
X
X
•
The 3 main reasons supporting leaving Orakei in the Isthmus zone are:
1.
Simplicity and equity – Orakei is clearly outside of the city boundary and the boundary
cannot easily be moved without creating inequity between bus and train
2.
Orakei is not a destination or a transfer point – unlike Newmarket passengers are not
travelling to Orakei to work or to transfer between services
3.
Only 400 passengers per day will be negatively effected while other passengers will be
“winners” for travel on bus, or travel south from Orakei station
DECISION (Recommendation): Retain Orakei Train Station in Isthmus Zone
9
Technical work-stream update
• Technical design
o
Draft technical design documents have now been received from TCS (2 July) and
OSL (7 July).
o
Both these documents are under technical review with an aim to provide
feedback to Thales this month.
o
The technical designs will form the basis of test plans which will then be used to
assess and test the quality of the software delivered by Thales
• The only matters outstanding from Thales relate to the TCS release 7.1:
o
Changes to the BDC to support display of zones for each stop
o
TCS changes to support paper ticket apportionment
• During August these should be confirmed with the full budget and schedule
impact then locked down. Budget provision has now been made for TCS
release 7.1
• We are also still technically assessing the feasibility of fully integrating ferry
into our zonal solution, but initial findings look promising
10
Schedule and Budget status
SCHEDULE
BUDGET
Projected Go-live 6 June 2016
Under budget to date, projecting ON-
BUDGET
•
Release 7.0 (zone lite ticketing) on-
•
$1M spent 14/15 fiscal against
track for delivery by Thales 31
budget of $2M due to Thales costs
October
moving to current fiscal
•
Release 7.1 estimated delivery by
•
$6M provisioned this fiscal – need
Thales (for commencement of UAT)
$1M carry-over from last fiscal to
31 Mar 2016.
ensure $7M available
•
Projected go-live below ideal as it
•
Some budget risk around TCS
allows completion of CRL bus stop
release for 7.1 (provision made)
changes and March madness
•
NZTA funding approval imminent
•
Integrated Fares still not on critical
•
Capex and opex codes setup for
path for New Network launch in the
design (non-funded) and
South (Aug/Sep 2016)
development (funded)