This is an HTML version of an attachment to the Official Information request 'Simpler Fares - Consultation Results'.

Integrated Fares
Project Control Group Meeting
Monday 13th July 2015
Family offering – options analysis
Day Pass – technical decision – impact on proposition
Orakei station
Technical solution status



2
Decisions required
1. Family offering- Select preferred technical 
option/proposition
2. Day pass – approve changed proposition due to technical 
approach
3. Orakei train station – stay within Isthmus zone or move to 
City Zone



3
Family offering - proposition

Proposition – in our public consultation, the family offering was described as:
Family weekender
2 children free with every AT HOP paying adult on weekends and public holidays

Proposition very positively received during the consultation

Important we don’t refer to this as a “pass” as this has connotations that you have 
to purchase something

What is a “AT HOP paying adult”

Does this apply to Super Gold passengers (Grandad travelling with grand-
children on weekends)?

Does this apply to Students (uni student with brother/sister)?

Does this apply to a Day Pass or Month Pass user?

Does this apply to a cash ticket purchaser?

No specific development is being done by Thales for a family offering, so we must 
utilise existing (or upcoming) system capabilities



4
Family offering – options (1)
• 3 potential technical approaches have been identified:
#
Option
Description
1
Children off system
Children travel with an adult
-
Bus – adult tags on, child gets “count key”
-
Rail – adult goes through gate, kids go around
2
Kids free with AT HOP
Children must have an AT HOP card, with child profile 
loaded (registered) – then can use PT
3
Paper ticket
Purchase paper ticket which allows 1 adult and 2 
children.



5
Family offering – options (2)
• Each of the 3 options has some benefits and issues
#
Option
Positive
Negative
1
Children Off system
 Consistent with messaging in public 
×
Problems with gates
consultation
×
Difficult to capture patronage (non-gated to 
non-gated train station)
×
Increased risk of abuse – “that’s my dad 
there!”
2
Kids free with AT HOP
 Promotes uptake of AT HOP – on-going 
×
Different proposition than what was 
“customer lifecycle” benefits
consulted on
 Fully capture patronage and origin-
×
Revenue leakage of unaccompanied
destination data
children travel on PT ($100-$300K p.a)
 No issues with gate lines in train stations
×
Having to purchase a card ($10) and put 
$5 on it may be a barrier for infrequent PT 
users (and can we call it free travel?)
3
Paper ticket
 Simple proposition for existing or new users  ×
No origin-destination data
of PT
×
No ability to limit availability of the ticket to 
 Consistent with messaging in public 
just weekends and public holidays
consultation
DECISION – Select preferred option.



6
Day Pass – changed proposition
• As you know, we are going from the current 2 day passes to a single all-
zone bus/rail and inner harbour ferry pass for $18 per day
• The current day passes have fixed apportionment at sale – all revenue 
is apportioned according to agreed percentages

This method of apportionment does not support PTOM
• We are proposing to change the current day pass to utilise the same 
apportionment/settlement functionality as current month passes –
scheme-based apportionment based on actual travel
• This will require a change to the proposition as the day pass will need to 
be limited to the day when it is first activated, not a sliding 24 hour 
timeframe as with the current pass

See in the next slide likely impact on users




7
Day Pass – usage analysis
• 2,180 day passes sold on 1,136 cards between 1 May and 15 June
• 72% activated in the morning, 83% last tag on in the afternoon
• 25% of cards are used on 2 days
DECISION – Approved change proposition



8
Orakei Station

During the consultation we received substantial feedback on the increase in fare from Orakei train 
station (1 stage to 2 zone)

Barry Mein has written a paper outlining this issue, potential options to resolved (attached).
Option
Simplicity
Equity
Impact on 
Impact on travel 
Revenue impacts
existing 
behaviour
customers
1. Current proposal (Orakei in 


X


Isthmus Zone)
2. Orakei station in City Zone 

X
X

X
X
3. Shift City Zone boundary east 
X
X

X
X
4. Orakei Station as a zone overlap
X
X

X
X

The 3 main reasons supporting leaving Orakei in the Isthmus zone are:
1.
Simplicity and equity – Orakei is clearly outside of the city boundary and the boundary 
cannot easily be moved without creating inequity between bus and train
2.
Orakei is not a destination or a transfer point – unlike Newmarket passengers are not 
travelling to Orakei to work or to transfer between services
3.
Only 400 passengers per day will be negatively effected while other passengers will be 
“winners” for travel on bus, or travel south from Orakei station
DECISION (Recommendation): Retain Orakei Train Station in Isthmus Zone



9
Technical work-stream update
• Technical design
o
Draft technical design documents have now been received from TCS (2 July) and 
OSL (7 July).
o
Both these documents are under technical review with an aim to provide 
feedback to Thales this month.
o
The technical designs will form the basis of test plans which will then be used to 
assess and test the quality of the software delivered by Thales
• The only matters outstanding from Thales relate to the TCS release 7.1:
o
Changes to the BDC to support display of zones for each stop
o
TCS changes to support paper ticket apportionment 
• During August these should be confirmed with the full budget and schedule 
impact then locked down. Budget provision has now been made for TCS 
release 7.1
• We are also still technically assessing the feasibility of fully integrating ferry 
into our zonal solution, but initial findings look promising



10
Schedule and Budget status
SCHEDULE
BUDGET
Projected Go-live 6 June 2016
Under budget to date, projecting ON-
BUDGET


Release 7.0 (zone lite ticketing) on-

$1M spent 14/15 fiscal against 
track for delivery by Thales 31 
budget of $2M due to Thales costs 
October
moving to current fiscal

Release 7.1 estimated delivery by 

$6M provisioned this fiscal – need 
Thales (for commencement of UAT) 
$1M carry-over from last fiscal to 
31 Mar 2016.
ensure $7M available

Projected go-live below ideal as it 

Some budget risk around TCS 
allows completion of CRL bus stop 
release for 7.1 (provision made)
changes and March madness

NZTA funding approval imminent

Integrated Fares still not on critical 

Capex and opex codes setup for 
path for New Network launch in the 
design (non-funded) and 
South (Aug/Sep 2016)
development (funded)