Savings Summary 
Year 1 Report 
Auckland Council 
Moana Nui a Kiwa – Gas Boilers to Heat Pumps 
 
Sep 2022 
 
 
www.esphq.com   /   [email address]     
+64 9 309 9482  /  Level 1  /  20-22 Gundry Street  /  Auckland 1010  /  New Zealand 
 


 
Executive Summary 
Purpose 
This document reports on the year to date savings made as a result of gas boilers replaced with heat pumps at the Moana Nui 
a Kiwa Leisure Centre. 
Savings Summary 
This M&V Report relates specifically to verification of ECM performance across the period between 1st of Aug 2022 to 31st July 
2023. The following table summarises the annual proposed and guaranteed savings from electricity as well as the verified 
savings for this reporting period.   
Total Energy Savings 
Consumption 
Cost Savings* 
GHG Emissions 
Savings 
($/a) 
Savings* 
(kWh) 
(tonne.CO2-e) 
Year to Date Verified Savings (Aug 22 – Jul 23) 
1,444,239 
$109,918 
307.42 
Total Verified Savings Year 1 
1,444,239 (+/- 
$109,918 
307.42 
160,935 at 85% 
CI) 
* Note that the savings verification only applies to energy consumption savings (not cost or emissions savings) 
 
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     2 
 

link to page 2 link to page 2 link to page 2 link to page 3 link to page 4 link to page 4 link to page 4 link to page 4 link to page 4 link to page 5 link to page 5 link to page 5 link to page 5 link to page 7 link to page 7 link to page 7 link to page 7 link to page 8 link to page 8 link to page 9 link to page 10
 
Contents 
Executive Summary .............................................................................................................................. 2 
Purpose 

Savings Summary 

Contents ................................................................................................................................................ 3 
Project Information ............................................................................................................................... 4 
Contact Details 

Project Details 

Confidentiality Statement 

Disclaimer Statement 

Project Background ............................................................................................................................... 5 
Project Information 

M&V Information 

Savings Information 

Project Savings Verification................................................................................................................... 7 
Measurement and Reporting Periods 

Analysis Overview 

Routine Baseline Adjustments ................................................................................................................................................. 7 
Non-Routine Baseline Adjustments ......................................................................................................................................... 8 
Observed Data and Energy Savings Analysis 

Appendix A: Baseline Year Observed Data ........................................................................................... 9 
Appendix B: Year1 Observed Data ...................................................................................................... 10 
 
 
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     3 
 



 
Project Information 
Energy Solution Providers (ESPNZ) was engaged by Auckland Council to complete a measurement and verification report for 
the Moana Nui A Kiwa to quantify and verify savings for the gas boiler replacement to heat pumps. 
This M&V Report is based on the principles of measurement and verification outlined in the International Performance 
Measurement and Verification Protocol (IMPVP) Volume 1, EVO 10000 – 1:2012. The measurements in this report were 
obtained from the ESP’s electricity and gas metering data and an Option B (Retrofit Isolation with all parameter measurement) 
measurement strategy was employed. 
Contact Details 
Postal  
Physical  
PO Box 109501 
Level 1 
Newmarket 
20-22 Gundry Street 
Auckland, 1149  
Auckland, 1010 
PH: + 64 9 309 9482 
Web: espnz.co.nz 
Project Details 
Project Ref: 
Moana Nui A Kiwa – Boiler to Heat Pump Replacement 
Issued: 
26/09/2023 
Company: 
Auckland Council – Moana Nui A Kiwa Leisure Centre 
Site Location: 
66R Mascot Avenue, Māngere, Auckland 2022 
Site Activity: 
Leisure Centre 
Compiled by: 
Mannat Choksi 
Position: 
Services Manager 
Approved by: 
Mannat Choksi – CMVP 
Position: 
Services Manager 
 
Confidentiality Statement 
The content of this report is the intellectual property of Energy Solution Providers Ltd. Any copying, republication or 
redistribution of this report in whole or part is expressly prohibited without the prior written consent of Energy Solution 
Providers Ltd. 
Disclaimer Statement 
While all effort has been taken to ensure the accuracy of the content of this report, Energy Solution Providers Ltd. shall not be 
liable for any errors in content or for action taken in reliance there on. 
© Energy Solution Providers Limited 2020 
 
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     4 
 


 
Project Background 
Project Information 
Project 
Client Name 
Auckland Council – Moana Nui a Kiwa 
Site Location 
66R Mascot Avenue, Māngere, Auckland 2022 
Activity Description 
Leisure Centre 
Funding Partner 
 
M&V Information 
Framework 
IPMVP Option 
Hybrid Option B (Retrofit Isolation with all parameter measurement) + Option C 
(Whole Site) 
Measurement 
Measured Parameter 
Gas Usage before and after the upgrade + Electricity usage of heat pumps 
Measurement Strategy 
Energy usage data from ESP Metering  
Measurement Boundary 
Natural Gas Usage at the Site Location and Heat Pumps submeters 
Measurement Periods 
Jan 2019 to Dec 2019 (12 month-baseline) 
Analysis 
Savings Determination 
Avoided Energy  
Basis of Routine Adjustments 
Multi-linear Regression Model 
Basis of Non-Routine Adjustments 
None Applied 
Analysis Methodology 
Comparison of predicted energy use and actual usage during reporting periods  
Target Uncertainty 
As per IPMVP practice, the uncertainty should not be more than 50% of the 
reported savings 
Reporting Schedule 
Year 1 
Verified energy savings to end Jul 2023 
Savings Information 
Total Energy Savings 
Consumption 
Cost Savings* 
GHG Emissions 
Savings 
Savings* 
($) 
(kWh) 
(tonne.CO2-e) 
Year to Date Verified Savings (Aug 22 – Jul 23) 
1,444,239 
$109,918 
307.42 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     5 
 


 
Total Energy Savings 
Consumption 
Cost Savings* 
GHG Emissions 
Savings 
Savings* 
($) 
(kWh) 
(tonne.CO2-e) 
Total Verified Savings To Date 
1,444,239 (+/- 
$109,918 
307.42 
160,935 at 85% CI) 
* Note that the savings verification only applies to energy consumption savings (not cost or emissions savings) 
The greenhouse gas emission rates were calculated in tonnes of carbon dioxide equivalent, using the Ministry for the 
Environment’s emission factors summary: Measuring Emissions: A Guide for Organisations – 2022 Summary of Emission 
Factors.
 
Total Carbon Savings 
Emissions for Natural Gas 
kg.Co2-eq per kWh 
Energy Generation 
0.195 
Total Emission Factor for Electricity 
0.120 
 
 
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     6 
 


 
Project Savings Verification 
Measurement and Reporting Periods 
The baseline period was selected to be calendar year 2019 spanning over 12 months to provide a complete annual gas 
consumption profile during normal operation. This was selected mainly to exclude any COVID lockdown periods. 
The heat pumps were commissioned on the 19th of July 2022. The savings start date is taken to be 1st of Aug 2022. This report 
is a part year report, and a complete year 1 report will be completed in Aug 2023. 
Analysis Overview 
Adjustments 
Routine Baseline Adjustments 
None Applied 
Non-Routine Baseline Adjustments 
None Applied 
Data Corrections 
None Applied 
Valuing Savings 
Average variable Gas costs 
8.0704 c/kWh 
Average Variable Electricity Costs 
10c/kWh 
Routine Baseline Adjustments 
Routine Baseline Adjustments Normal fluctuations in the key factors that influence energy use have been recorded as an 
independent variable throughout the reporting period. These data points are applied to the baseline model, as shown below, 
to predict energy use under the same conditions prevailing during this reporting period. The following equation describes the 
regression model for the total gas consumption for the site’s main incomer: 
𝑷𝑴𝑮𝑪 = 𝟑𝟕𝟏, 𝟓𝟓𝟖. 𝟓𝟓 + 𝟎. 𝟎𝟓𝟑𝟔𝟖 ∗ 𝑴𝑷𝑽 − 𝟏𝟑, 𝟑𝟕𝟓. 𝟓𝟓𝟖 ∗ 𝑴𝑨𝑻 
PMGC = Predicted Monthly Gas Usage 
MPV = Monthly Pool Visits 
MAT = Monthly Mean Ambient Temperature (NiWA Station ID 43711) 
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     7 
 


 
 
Non-Routine Baseline Adjustments 
None yet. Changes to any static factors can affect the level of savings achieved by the ECMs which would require non-routine 
baseline adjustments. 
Observed Data and Energy Savings Analysis 
As part of the data analysis carried out, see below the baseline and reporting period. The graph below shows the sum of total 
gas main incomer usage and the heat pump submeters. 
Gas and heat pump electricity consumption (Jan-19 to Jul-23)
 300,000
)
 250,000
(kWh
 200,000
age 
 Us  150,000
rgyenE   100,000
ly
th
n
 50,000
Mo
 -
-19
-19
-19l
-19
-20
-20
-20
-20
-21
-21
-21
-21
-22
-22
-22
-22
-23
-23
-23
p
v-19
l
p
v-20
l
p
v-21
l
p
v-22
l
Jan
Ju
e
o
Ju
e
o
Ju
e
o
Ju
e
o
Ju
Mar
May-19
S
N
Jan
Mar
May-20
S
N
Jan
Mar
May-21
S
N
Jan
Mar
May-22
S
N
Jan
Mar
May-23
Gas Main Incomer (0001393692QT-85E)
Total Heatpumps Electricity Usage (kWh)
 
In the graph above, we can see the reduction in gas users as the heat pump units were commissioned in July 2022. 
*Note that the savings verification only applies to energy consumption savings (not cost or emissions savings) 
.  
 
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     8 
 


 
Appendix A: Baseline Year Observed Data 
Month 
Gas Main Incomer (0001393692QT-85E) 
Jan-19 
108,282 
Feb-19 
125,140 
Mar-19 
163,415 
Apr-19 
184,730 
May-19 
217,663 
Jun-19 
241,450 
Jul-19 
242,716 
Aug-19 
135,267 
Sep-19 
171,709 
Oct-19 
135,066 
Nov-19 
115,701 
Dec-19 
115,108 
 
 
 
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     9 
 


 
Appendix B: Year1 Observed Data 
Date 
Gas Main Incomer 
Pool Visit 
Mean Air 
Predicted 
Total Heat 
Savings 
(0001393692QT-85E) 
Temperature 
Usage 
Pump 
Usage 
(kWh) 
Aug-22 
55,480 
7403 
13.5 
191385.9 
33,178 
102,728 
Sep-22 
22,870 
9269 
15.2 
168747.6 
43,418 
102,460 
Oct-22 
15,406 
10735 
17.7 
135387.4 
40,100 
79,882 
Nov-22 
15,190 
452 
19.7 
108084.3 
31,466 
61,428 
Dec-22 
20,867 
823 
16.8 
146893.4 
24,754 
101,272 
Jan-23 
 16,844  
14704 
20.1 
103499.1 
 24,263  
 62,392  
Feb-23 
 81,114  
7586 
18.2 
128530.6 
 8,546  
 38,870  
Mar-23 
 18,170  
10200 
17.7 
135358.7 
 29,994  
 87,194  
Apr-23 
 56,075  
6676 
15.8 
160583.1 
 24,466  
 80,042  
May-23 
 62,746  
4485 
12.4 
205942.3 
 28,065  
 115,131  
Jun-23 
 113,627  
7482 
12.4 
206103.2 
 25,676  
 66,800  
Jul-23 
 98,362  
7887 
10.8 
227525.9 
 30,063  
 99,101  
 
www.esphq.com   /   [email address]     
M&V Report / MNAKLC – Heat Pump project / Dec 2022     10