This is an HTML version of an attachment to the Official Information request 'Percentage of roads over design life'.
   
50 Victoria Street 
Private Bag 6995 
 
Wellington 6141 
 
New Zealand 
T 64 4 894 5400 
 
F 64 4 894 6100 
 
www.nzta.govt.nz 
 
 
18 November 2022 
 
 
 
 
 
 
Rhys Lewis 
 
 [FYI request #20846 email] 
REF: OIA-11208 
 
Dear Rhys 
 
Request made under the Official Information Act 1982 
 
Thank you for your email of 13 October 2022 requesting the following information under the 
Of icial Information Act 1982 (the Act): 
 
Could you please tell me the percentage of roading maintained by NZTA that is currently 
over the design life duration for the seal grade and traffic volumes that apply to that 
section of road. 

 
The attached document OIA-11208 Results falls within the scope of your request. 
 
By square meterage of major surfaces, 32% of the network is overdue for renewal based on 
the design life (where available) or the default/modified life (where design life is 
unpopulated). For context, please note that design lives are approximations only and that 
results with an overdue status are subjective.   
 
As an industry, we use the NZ Chip Sealing Manual to set our expectation around design 
lives. These design lives have not been adjusted for some time but are the defaults we 
general expect to achieve if traffic volumes and traffic mix stayed constant over time.   
 
It is important to highlight that the design life is indicative only and that our renewals and 
resurfacing programmes are reviewed and refined annually.  We do this using asset data, 
high speed data collection tools, surfacing data and best practise, to identify highest priority 
and need.  There are instances when a pavement may exceed design life but condition is 
meeting standards and level of service, therefore a treatment is unnecessary. 
 
Significantly, our 2021-22 resurfacing and renewal programme successfully achieved 2,119 
lane kilometres, our most achieved in one season, and we are aiming even higher in 2022-23 
with a programme target of 2,587 lane kilometres across Aotearoa. 
 
 
 
 
 
  


If you would like to discuss this reply with Waka Kotahi, please contact us by email to 
[NZTA request email]. 
 
 
Yours sincerely 
 
 
 
 
Vanessa Browne 

National Manager Programme and Standards