.MEMO 
1982
Act 
 
Hi James, 
 
Table below is a summary of the 2016 RSA issues, the 2016 “Safety Engineer/Client Decision”, and my 2020 Comments and recommendation for close-out. GREEN is where I believe the 2016 decisions are still appropriate, BLUE may require 
some extra analysis by designer. RED is where I think the 2016 decision should be re-visited. 
 
RSA Item  Issue Summary 
2016 Comments & Decisions 
2020 RLL Comment and 
2020 JRH Decision 
2020 Designers Response 
Summary 
Recommendation 
3.1.1 
MINOR – Ohinewai – Curved W-section at 
No room to provide flare for 
Not clear on the pre-implementation 
I’m assuming that the accessway 
W-section curved trailing end terminals 
Information 
Entranceways is essentially “non-gating” 
continuous protection and RSB-2 
plans, but appropriate clear areas for 
requires the vehicle to decelerate and 
at entranceways to remain. The barrier 
from TM-2008 is considered 
both the W-section and WRSB must be 
accelerate on the shoulder before 
is offset 3.5m from the edge line either 
 
acceptable solution. 
provided to mitigate the gating risk. 
turning into the accessway or merging 
side of the entranceways which provides 
into the live lane. 
sufficient room for 
 
Individual driveways to be assessed 
deceleration/acceleration. 
whether flared WRSB could be provided  This manoeuvre will increase 
Considered Acceptable. 
to mitigate risk further. 
risk@110km/h. We should ensure that 
there is sufficient shoulder for the 
 
acceleration and deceleration 
manoeuvres to be undertaken clear of 
the live lane. 
Official  If there are no alternatives available, 
then this is a risk that will perpetuate.  
I consider this to represent a much 
greater risk than the curve of the 
the 
guardrail or safety barrier configuration. 
under 
Released 



1982
RSA Item  Issue Summary 
2016 Comments & Decisions 
2020 RLL Comment and 
2020 JRH Decision 
2020 Designers Response 
Summary 
Recommendation 
3.1.2 
MODERATE – Off Ramps - insufficient sight 
• Ohinewai – Increase barrier offset 
• Ohinewai – Agree with 2016 
As a rule, we try and limit barrier offsets 
  Ohinewai off ramp – no change 
distance for 10s of travel time to taper & nose  from 3.0 to 3.5m => 335m SD 
Decision 
to 4.0m max to manage impact angles 
required. 
(desirable need 335m =120km/h design 
provided. Client Decision = Yes 
and also to discourage use as an 
• TR S’Bnd - Small concern that going 
  TR S’Bnd off ramp – no change 
Act 
speed) 
additional lane. 
• TR S’Bnd – Barrier offset could be 
beyond 4.0m offset increases the risk of 
required. 
• Ohinewai Northbound off-ramp 
increased from 3.0 to 4.5m to 
bigger impact angles. Would like to 
 I don’t believe that it is worth providing 
  TR N’Bnd off ramp – no change 
achieve 335m SD. Would require 
know how much extra SD we can get 
the additional SD for 120km/h. I would 
• Te Rapa SH39 Southbound Off-Ramp 
required. 
additional berm & swale works. 
from going to 4.0m offset instead of 
recommend leaving the barrier offset at 
• Te Rapa SH39 Northbound Off-Ramp 
Current Design SD = 288m = 8.6s 
4.5m. If this can get us to 305m SD 
3.0m at the first location and accept the 
@120km/h or 9.4s@110km/h. Client 
(=10.0s @ 110kmh) this would be a 
288m SD for the second. 
 
Decision = Accept 288m SD. 
good outcome. 
 
 
• TR N’Bnd – 335m Achieved, no 
• TR N’Bnd – Agree with 2016 
change required 
assessment. 
 
3.1.3 
MODERATE – Deficient WRSB laps with 
1.  Remove existing flared 
1.  Agree with 2016 Decision 
Agreed 
All WRSB terminals and overlaps to be 
existing barrier systems. 
terminals and install as per 
consistent with TM-2013 RSB-7A. 
2.  Agree with 2016 Decision 
TM-2013 detail RSB-7A. 
Information 
1.  New Leading WRSB terminal in front 
Client Decision = Yes 
3.  Agree with 2016 Decision. 
of existing Trailing Terminal [1 
location – Cambridge 3800 LHS] 
2.  All laps to be as per RSB-7A. 
Client Decision = Yes 
2.  New Trailing WRSB terminal behind 
existing leading terminal [14 location, 
3.  Plans diagrammatic only, All 
3xOhinewai, 7xNgaruwahia, 4xTe 
terminals and laps to be as 
Rapa] 
per RSB-7A. Client Decision 
= Yes 
3.  WRSB terminals have insufficient 
lateral clearance and overlap [3 
locations, 2xOhinewai, 1x 
Official 
Cambridge] 
3.1.4 
MODERATE – Ohinewai – Deficient 
Existing flax considered frangible and  Agree lower risk, but still see merit 
Agree with RLL. 
Design has been amended to provide 
Armitage Road Diverge. Recommend install 
serves a purpose as a headlight 
installing barrier down Armitage 
for extension of barrier and crash 
crash cushion & extend barrier down 
screen. Armitage Road considered a 
Road fence to cover off the Expressway 
cushion down Armitage Rd. 
the 
Armitage road to cover Expressway length of 
flat run-out area. 
LON. As a loss-of-control vehicle is 
 
need.  
unlikely to pul  up in time. This appears 
that it would be easy to do. 
In addition, the deceleration lane has 
 
been extended by 30m to meet 110kph 
 
design requirements. 
under 
 
 
WAKA KOTAHI NZ TRANSPORT AGENCY 
DOCUMENT TITLE // 2
 
Released 

1982
RSA Item  Issue Summary 
2016 Comments & Decisions 
2020 RLL Comment and 
2020 JRH Decision 
2020 Designers Response 
Summary 
Recommendation 
3.1.5 
MODERATE – Conflict with new barriers & 
1.  Existing poles have shear 
1.  Prefer all poles are relocated, 
Locating the poles outside the tested 
All poles in project site to be relocated to 
Existing light poles. 
bases, no change proposed. 
but as a minimum - as per 2016 
deflection may require excessive 
1.5m behind new barrier to achieve 
Client Decision = Acceptable. 
Safety Engineer Comment, all 
outreaches to achieve the appropriate 
lighting consistency. All shear bases 
1.  Existing poles within the dynamic 
Act 
shear bases within the 
lighting levels. This needs to be 
within deflection zone to be tested to 
deflection of the WRSB 
2.  All poles will be relocated 
dynamic deflection zone 
checked. 
ensure correct torque settings. 
behind barrier. Client 
2.  Existing poles in front of new barriers 
should be checked for correct 
Decision = must be outside 
 
torque settings 
dynamic deflection zone. 
If this is an issue, then the offset to the 
2.  Agree with 2016 Decision, any  columns may be brought down to 1.5m. 
relocated poles must be clear of 
dynamic defection. 
 
3.1.6 
MODERATE – Te Rapa – Deficient WRSB 
Design modified. Client Decision = 
Agree with 2016 Decision, note 2016 
It is my understanding that the Te Rapa 
No action required at this time. 
break for cyclists. 25m gap in barrier for 
Yes 
Safety Engineers comments that the exit  section of the WEX is not being 
cyclists to exit. Recommend install parallel 
must not be too tight (Some negative 
considered for 110km/h speed limit. 
barrier system (similar to Cambridge section) 
feedback received on Cambridge 
to cover Expressway LON. 
example). Review exit geometrics for Information 
appropriateness. 
3.1.7 
MINOR – General conflicts/omissions with 
In process of obtaining designs, 
Agree that co-ordination and match-
Agree with RLL 
Rangiriri and Huntly sections are now 
committed/in progress WEX works. 
design will be amended as necessary  ins with adjacent sections should be 
complete and the Ohinewai design has 
Recommend co-ordinate with Rangiriri & 
to provide continuity though entire 
achieved. 
been amended to match into these 
Huntly works. 
expressway. 
sections. Note that RS/RP has changed 
as a result and this is evident on the 
amended drawings. 
 
To be considered further in the 
Official 
refinement of the Ngaruawahia section 
design. 
3.1.8 
MINOR – Maintenance bay conflicts. 
1.  Moved 15m North to avoid 
Agree with 2016 Safety Engineer 
Agree with RLL 
1.  The northbound maintenance 
Proposed maintenance bays appear to 
embankment 
Comment that Maintenance bay 
bay has been relocated further 
conflict with existing topography 
locations also need to be checked for 
north, clear of the overbridge 
the 
2.  Moved south to provide 
sightlines. 
embankment. The sightlines to 
1.  Ohinewai 7980 RHS – fil  
regular spacing between 
each of the three proposed 
embankment for overbridge. 
maintenance bays. 
maintenance bays meet the 
Recommend move north. 
minimum 210m requirement.  
2.  Ngaruawahia 4170 LHS – Existing 
However, contractors should 
drain & headwall. Recommend move 
ensure that appropriate TM is 
North. 
used for maintenance activities 
and vegetation in the vicinity of 
under 
the bays is kept clear to 
maintain sightlines. 
2.  To be considered further in the 
refinement of the Ngaruawahia 
section design. 
WAKA KOTAHI NZ TRANSPORT AGENCY 
DOCUMENT TITLE // 3
 
Released 

1982
RSA Item  Issue Summary 
2016 Comments & Decisions 
2020 RLL Comment and 
2020 JRH Decision 
2020 Designers Response 
Summary 
Recommendation 
3.1.9 
MODERATE – Ngaruawahia Section – 
1.  Electronic Setout data to be 
1.  Agree with 2016 Decision 
Agree with RLL comments 
No change required for Ohinewai 
Deficiencies associated with future-proofing 
supplied to Contractor 
section. 
2.  Agree with 2016 Decision 
Hamilton Section Integration. 
2.  Drawing amended 
 
Act 
3.  Agree with 2016 Decision 
1.  Setout is based on ultimate 
3.  Drawing amended 
To be considered further in the 
configuration, risk that Contractor 
4.  Agree with 2016 Decision 
refinement of the Ngaruawahia section 
sets out based on existing 
4.  Barrier moved to 3.0m offset 
5.  Agree with 2016 Decision 
design.  
configuration 
5.  This barrier is being 
6.  Agree with 2016 Decision 
 
2.  5750-5850 LHS incorrectly labelled 
relocated as part of the 
as WRSB, should be W-section. 
Hamilton Section works 
7.  If Safe Hit posts are still there, 
 
assess any forward sight 
3.  5890 LHS transition cannot be 
6.  Wide expressway shoulders 
visibility issues. 
achieved as drawn. 
not suitable for Police 
enforcement. Client Decision 
4.  6430-6510, barrier closer than 3.0m 
= Police enforcement 
=> adversely affect SSD 
provisions to be provided as 
5.  0060-6350 – Median barrier 
part of ‘Weigh Right’ project. 
incorrectly located => tie-ins 
7.  This wide shoulder is to 
therefore incorrect 
accommodate future 
6.  0600-6100 Existing wide shoulder 
Hamilton Section, Safe hit 
Information 
used by NZ Police for enforcement 
posts have been installed to 
purposes, need to ensure 
discourage vehicles pulling 
enforcement provision is still 
off. These wil  be ultimately 
provided for. 
be removed as continuous 
barrier protection is provided. 
7.  Northbound (north of Lake Road 
CLIENT DECISION: Safe Hit 
Overbridge) WRSB proposed some 
posts installation not agreed 
distance from median edgeline – risk 
as considered unnecessary 
that vehicles may then park on the 
and can impede sight 
RHS instead of the usual LHS. 
distance 
Official 
3.1.10 
SIGNIFICANT – General – OGPA Conflict 
Drawings to be clarified – OGPA only  Consider 500mm offset doesn’t go far  I consider 500mm is close enough to 
No change required for Ohinewai 
with cyclists. OGPA lip wil  be in the centre of  on Ngaruawahia & Te Rapa. 
enough to fully mitigate cyclists 
provide shy-distance to the barrier for 
section. 
the shoulder available to cyclists. 
Drawings amended to show OGPA 
preferred path. Agree with 2016 
cyclists and vehicles using the shoulder.   
Recommend extend OGPA to barrier face. 
extended to within 300mm of barrier 
Designer & Safety Engineer 
Assuming that the shoulder is 3.0m to 
the 
face. Client Decision: 500mm Offset 
recommendation to go with 300mm. 
the barrier face. 
To be considered further in the 
to be used. 
refinement of the Ngaruawahia and Te 
Rapa Sections.  
 
 
under 
WAKA KOTAHI NZ TRANSPORT AGENCY 
DOCUMENT TITLE // 4
 
Released 

1982
RSA Item  Issue Summary 
2016 Comments & Decisions 
2020 RLL Comment and 
2020 JRH Decision 
2020 Designers Response 
Summary 
Recommendation 
3.1.11 
MINOR – General – Various Barrier 
1.  Drawings amended 
1.  Agree with 2016 Decision 
I do not understand how these were 
No change required for Ohinewai 
Deficiencies 
omitted in the first instance but, given 
section. 
2.  Existing barriers are 2.8-
2.  Agree low-risk, recommend 
that they are missing, why this is 
1.  >3.0m offset observed in several 
2.9m offset in a few 
check that existing barrier 
 
Act 
considered out of scope. 
locations 
locations, considered low-
position is not causing any 
To be considered further in the 
risk 
SD issues which need to be 
Agree with RLL - A standard WRBS to 
2.  Existing barriers less than 3.0m 
refinement of the Ngaruawahia and Te 
rectified. 
rigid transition should be considered in 
offset (Te Rapa 1700-1850 RHS) 
3.  Outside of scope of project. 
Rapa Sections.  
all locations. Where this is not 
3.  This seems an unacceptable 
3.  Ngaruwahia section - Various leading 
practicable, a departure should be 
 
risk, if there is no appropriate 
end terminals missing from existing 
sought. 
transition from WRSB to Rigid 
 
median rigid barriers (i.e. at Bridge 
barrier, then this should be 
piers). These are near existing 
rectified. 
WRSB. Recommend installing rigid 
barrier terminals to address issue 
from dynamic deflection. 
Information 
Official 
the 
under 
WAKA KOTAHI NZ TRANSPORT AGENCY 
DOCUMENT TITLE // 5
 
Released 

1982
RSA Item  Issue Summary 
2016 Comments & Decisions 
2020 RLL Comment and 
2020 JRH Decision 
2020 Designers Response 
Summary 
Recommendation 
3.2.1 
MODERATE – General forward sight 
Graham Taylor (NZTA) decision that 
1.  Agree with 2016 commentary, 
1.  Limit the barrier offset to 4.0m – 
1.  Barrier through curve to be 
Distance deficiencies 
210m SSD is acceptable. 
trim vegetation, move barrier 
which provides 197m of SSD. 
offset 4.0m and vegetation to be 
and achieve 210m SSD 
cleared.  This will provide a SSD 
• Review all sight distances on the basis of 
Two locations where 210m SSD has 
2.  Agree with RLL 
Act of 210m for 0.2m object height 
120km/h design speed. 
been compromised by installation of 
2.  Agree with 2016 Client Decision, 
3.  Agree with RLL 
(stationary object on road) and 
new barriers. 
assess what can be achieved 
• Review all existing safety barriers for 
210m for 0.8m object height (car 
for a 0.2m & 0.8m scenarios. 
 
conformance for 120km/h design speed. 
1.  Ohinewai Northbound Curve 
tail light). 
2.8-3.2. 3.0m Barrier offset 
3.  Agree with 2016 commentary, 
2.  To be considered further in the 
gives 180m SSD, needs to 
use available berm, move 
refinement of the Ngaruawahia 
be 4.75m to achieve 210m. 
barrier to achieve 210m SSD. 
Section. 
Could be achieved by 
trimming vegetation. 
3.  To be considered further in the 
refinement of the Ngaruawahia 
2.  Ngaruwahia Northbound 
Section. 
ramp to future WEX Hamilton 
Bypass Connection. 3.0m 
offset barrier is on top of high 
embankment and at bridge, 
would require significant 
earthworks and bridge 
Information 
widening. 
3.  Ngaruwahia Southbound 
720mR curve to future WEX 
Hamilton Connection, 
Sufficient Berm width to 
achieve 210mSSD. Drawings 
to be amended. 
Client Decision: Please advise 
• What can be achieved with 0.2m 
Official 
object height 
• What can be achieved with 0.8m 
object height 
• What is available seal width for 
the 
manoeuvring at WEX Hamilton 
connection (Sec.5.5.1 of AGRD 
3) 
under 
WAKA KOTAHI NZ TRANSPORT AGENCY 
DOCUMENT TITLE // 6
 
Released 

1982
RSA Item  Issue Summary 
2016 Comments & Decisions 
2020 RLL Comment and 
2020 JRH Decision 
2020 Designers Response 
Summary 
Recommendation 
3.2.2 
MODERATE – General – Acceleration 
On Ramps at Ohinewai, SH18 
From AGRD, Ramp Length = 585m x 
Agree with RLL 
No change necessary. 
Distances on On-Ramps. Check all on-ramp 
Gordonton, Te Rapa Drive & Koura 
0.6 correction factor for 3-4% 
lengths are appropriate for the predicted 
Road all have lengths ranging from 
downgrade = 350m. 
Act 
higher merge speeds. 
300m to 430m. 
 
With an entry speed of 30km/h and 
Shortest ramp is 300m 
typical 3-4% downgrade, 350m 
required to achieve 110km/h. 
300m / 0.6 => 500m flat grade 
acceleration length 
Safety Engineer: For ramps <350m 
request widening in the merge area 
 
to allow for additional manoeuvre 
425m Equivalent flat grade length 
space. 
required for 100km/h. 
Client Decision: Shoulder widening 
 
changes the ramp configuration and 
is considered unacceptable. Low 
Calculated merge speed: = 105.6km/h 
volumes on Expressway, no design 
=> Acceptable 
changes. 
Recommend no design change 
necessary. 
Information 
3.2.3 
MINOR – General – Various Sign 
1.  9m wide median with 
1.  Agree with 2016 Decision 
Agree with RLL 
No change necessary for Ohinewai 
Deficiencies 
frangible posts proposed. 
section. 
2.  Agree with 2016 Decision 
Given frangible posts 
1.  Speed threshold signage in medians 
 
additional median protection 
3.  Agree with 2016 Decision 
– may be large & non-frangible for 
not considered necessary. 
1.  No change necessary. 
wind loading. Recommend install 
4.  Agree with 2016 Decision 
appropriate protection to prevent 
2.  Signs relocated 
2.  No further changes necessary. 
5.  Ngaruwahia – Agree with 2016 
vehicle interaction with median 
3.  Drawings amended 
Decision 
3.  No further changes necessary. 
signage. 
4.  Proposed signs are 
Te Rapa – Agree with 2016 
4.  To be considered further in the 
2.  Rangiriri Section – Advanced 
1200x1200 or 900x900 
Safety Engineer Comments – 
refinement of the Ngaruawahia 
Official 
warning speed signs at CH.15150 
Has Review from Mike P 
Section. 
may be obscured by Bridge 
5.  110km/h at Ngaruwahia, lane 
occurred? 
piers/abutments. Recommend 
gain situation, no driver 
5.  No change necessary for the 
relocate signs. 
decision. Safety Engineer & 
Ngaruawaia section.To be 
Client Decision => OK 
considered further in the 
3.  Cambridge section – 100km/h 
the 
refinement of the Te Rapa 
threshold to southbound on-ramp 
110km/h at Te Rapa located 
Section. 
missing. Recommend install. 
at start of two lanes, consider 
very minor driver decision. 
4.  Ngaruwahia section – Advance 
80km/h warning sign at 1860 
Safety Engineer prefers 
inappropriately sized. Recommend 
location is downstream, and 
900x900mm. 
requires liaison with Mike 
Pilgrim to ensure 80/110 
5.  General – Proposed 110km/h signs 
change is in appropriate 
at 4.71 (Te Rapa Northbound) and 
under 
place. 
0.73 (Ngaruwahia Southbound) are 
located at or near areas of multiple 
decision making. Recommend 
relocate to 4s of travel time beyond 
commencement of dual lanes. 
 
WAKA KOTAHI NZ TRANSPORT AGENCY 
DOCUMENT TITLE // 7
 