This is an HTML version of an attachment to the Official Information request 'Pacific Development and Conservation Trust'.

Minutes of Meeting of the Advisory Trustees of the 
PACIFIC DEVELOPMENT AND CONSERVATION TRUST 
Held online  
on Wednesday 1 July 2020 commencing at 1.10pm 
PRESENT 
Jannitta Pilisi (Acting Chairperson) 
Barbara Hayden 
Sai Lealea (from 1.30pm due to technical difficulties) 
Ruth Sio-Lokam 
Kim Wright 
IN ATTENDANCE 
Joe Grace – Manager Regional Services, Lottery and Trusts 
Joanne Becker – Advisor, Lottery and Trusts 
 Rosie 
Henley 

Interpreter 
Wenda Walton – Interpreter 
Lynne Dowling – Advisor, Lottery and Trusts 
Prior to the beginning of the meeting those present agreed that Jannitta Pilisi would be the 
Acting Chairperson for the purpose of this meeting. 
1.
Welcome and apologies
The meeting was opened by Jannitta Pilisi with a prayer.
The two new Advisory Trustees were welcomed and all those present at the meeting
introduced themselves. Kim’s experience as a former Foundation North trustee and
Ruth’s accounting experience were noted with enthusiasm.
Apologies were received from Brenda Wraight.
2.
Confirmation of previous minutes
The minutes of the Pacific Development and Conservation Trust (Trust) meeting held
on 25 November 2019 were confirmed as a true and accurate record.
Barbara Hayden/Jannitta Pilisi 
3.
Matters Arising
There were no matters arising from the minutes of the previous meeting.
4.
Accountability reports received – separate spreadsheet

One of the longer-serving Advisory Trustees explained the purpose of the 
Accountability Reports. The Advisory Trustees noted the accountability reports 
received and those not yet due.  
One of the Advisory Trustees asked if there had been any negative feedback form 
groups declined at the last meeting. Joanne said there had not been any negative 
feedback but several groups had contacted her for further clarification of the decision 
reason and that had been provided. 
The Advisory Trustees commented on one grant where numerous attempts to contact 
the group had been unsuccessful and asked what the next steps were. Joanne Becker 
and Joe Grace explained the Department of Internal Affairs process for grant write-
offs. It was suggested by the Advisory Trustees that a Pacific Head of Mission may be 
in a position to provide some project feedback. 
ACTION: Sai Lealea to contact the appropriate Solomon Islands Pacific Head of Mission 
for feedback on the progress of the Ngwaelalida Water Tank Project. 
5.
Funds available for distribution
The Advisory Trustees noted that $155,497 unspent from the previous financial year
(2019/2020) was carried over to the new financial year (2020/2021) which starts
today. That $155,497 was due to be allocated at the meeting scheduled to happen in
March 2020 but was postponed due to COVID-19.
This $155,497 has been added to the normal allocation of $250,000 that would have
been available for the allocation meetings in 2020/2021.
This means that this year there are technically three allocation meetings.
6.
Declarations of Conflicts of interest
There were no declared conflicts of interest.
7.
2019/20 PDCT second funding round requests
The Advisory Trustees considered 45 applications for funding. Of the 45 applications,
10 applications were recommended for funding totalling $160,424 and 35 applications
were recommended for decline. The Advisory Trustees’ recommendations and
comments are set out in the Recommendation Schedule, attached as an Appendix to
these minutes.
8.
Date of next meeting – before 25 November 2020
The date of the next meeting would be confirmed by early October 2019 following the
appointment of another Advisory Trustee. However, those present confirmed they
would likely be available to meet on Friday 6 November 2020.

9.
General Business
At 3.00pm two former Advisory Trustees, Peter Kiely and Bevan Killick joined the
meeting so they could be farewelled by those Advisory Trustees present at the
meeting. The former Advisory Trustees welcomed the new Trustees, spoke of the
good work done by the Trust and thanked staff. Current Trustees praised the
leadership of the former Chairperson and Bevan’s specialist accounting knowledge.
The Secretariat flagged these items for discussion at this meeting.
a. Online system
b. Future meetings
The future meetings issue was discussed earlier in the meeting. 
Joe Grace explained that, due to former Advisory Trustees’ frequent travel to places 
with poor, unstable or very expensive internet connections PDCT has been using work-
arounds instead of the full functionality of the online system.  
He wondered whether the Advisory Trustees would like, after training, to utilise all the 
features of the online grants and customer management system. The Advisory 
Trustees agreed to this, with the proviso that the current work-around would still be 
an option if required. Joe agreed and advised that DIA staff would be in touch to set 
up training later in the year. 
ACTION: DIA Staff to train Advisory Trustees to use the review features of the grants 
and customer management system before the November 2020 meeting.  
The meeting concluded at 5.10pm after participants were thanks for their contributions and 
a karakia from Jannitta. 
Chair: _____________________________ 
Date:_______________ 

APPENDIX 1

 
of 
en 
 
of 
 On 
to 

t.
to 
ned 
to 
 
ere 
he
erit 
on 
on 
the 
the 
erit 
f the 
e Trust 
e Trust 
a low
re w
nger 
rities.
e m
e m
o
o
 chosen 
t wis
h
occasi
lication. 
nment 
h
ith 
est alig
ties and 
has chos
The Trust
ith 
h
occasi
lication. 
nment 
h
t o
 t
 t
el is 
 the
the projec
on bu
ess w
est. 
ess w
th 
 see
ur app
er alig
Trust 
 see
ur app
er alig
trav
on this 
s priori
on this 
g and
 with str
Trust has
yo
yo
in
licati
s wi
 succ
 your requ
 succ
 could

ered that other 
the fund. T

ered that other 
the fund. T
 has 
trong
 The 
 could
 has 
trong
on 
ver, 
d
tes the meri
 the fund’s pri
 the 
nsid
of 
 Trust’
of 
 your requ
nsid
eas
we
d
 no
r fun
to
ur app
ct, it
ct, it
o
 Trust
 co
ties 
ted that
 Trust
 co
ties 
n r
 fo
oje
to declin
o
oje
to declin
io
t. Ho
ccasion
ts had a s
t. 
g criteria.
y fun
t. 
ts had a s
is
Trust
Trust
with the
Trust
 full
Dec
The 
projec
priority
other applications
alignment 
this o
decline y
you every succes
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
It was n
well 
fundin
to
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
 



$

.0

$
$
$0
ed 
$14,245
ount 
ov
Am
appr
 
 
 
 


o
30
st 
7,

$47,304
$4
$32,800
$24,611
$31,016
l Co
ta
To

Projec
 
 
 
IA
 
ew
t Benefit 
AL

o
 
 
m
a N
ea
stralia
u
 
Projec
Area 
AUSTR
Au
Solo
Islands
Pap
Guin
Fiji
 
 
 
 a 
ce 
ce
u
one 
 
cial 
line
d
es and 
 
vin
ve
n
 
 o
r So
 re
t and 
eph
to
 
tel
 to fi

fan
p
 the
ng fo
ersity,
actions,
erator and
n
the pro
le 
to
ti
relic sit
ational park.
er 
and Vatulele 
f u
 
WII 
attr
cre
efrig
s in 
 Guinea.
tu 
arke
 Univ
 
erilis
 enab
ok
 W
e and i
ew
ova
 
oup o
 M
6
urist 
8
Co
o
ent st
te to
ary
 Vanuatu in
1
of the
r t
e, and re
accine r
m
ality rate
t Naut
bia Island.
ted gr
3
m
mes 
o
a v
apua N
o
o
 Australia.
ent 
d f
satelli
centr
of 
mort

 Cik
selec
of BX

 equip
ville,
pm

o
etlan
ect Summ
ernal 
adang, P
oj
wns
vel
stalling 
202
f M
Pr
Enrol a 
students fr
deliver
Change at Ja
To
De
the w
research 
Purchase 
medical
the burden of diseas
mat
o
In
and internet a
Village in
019/
 
 
llege
an 
 

 
 Co
er

 Urb
i Outreach
D TWO 2
m
ma 
es Coo
sto
ventist
uth Club
Cu
Jam
Universit
 
Betika
Ad
Cabrin
Cirikalia
Yo
 ROUN
T

 
ESIA
 
 
 
-
67
-
45
-
97
-
59
 
20
77
20
77
20
77
20
60
PDC
Request 
ID
20
13
MELAN
20
13
20
13
20
13

 
to 
 
of 

o
ned 
en 
 

 On 

t. 
to 

o
on 
 
ted 
the 
ere 
erit 
the 
t, th
this 
s your 
ver
ith 
osen t
f your
 is a l
re w
nger 
rities.
e m
e Trust 
e Trust 
o
o
 chosen 
t wishe
h
occasi
lication. 
nment 
h
ith 
f your
e, and due 
ojec
h
h
ith 
est alig
ties and 
has chos
ard
t o
 t
t o
w
 you e
 
 the
the projec
the limi
ady been 
o
t.
ess w
arch
on c
n. T
on bu
ess w
ess w
th 
 see
ur app
er alig
ailabl
ven 
o
Trust 
on t
rese
 alre
wi
on this 
r this pr
s priori
ojec
 succ
g and
 with str
Trust has
yo
g av
ccasi
wishes
in
licati

 succ
 succ
 your requ
pr
 could

ered that other 
the fund. T
 fo
 o
licati
 has 
trong
in
 The 
on 
ver, 
d
ver, gi
d
tes the meri
 the fund's pri
 the 
nsid
of 
tes the meri
 Trust’
ntributi
Trust 
eas
we
we
 no
r fun
to
ur app
ct, it
 fun
ur app
co
o
 Trust
 co
ties 
 no
oup having
on this
o
ted that
n r
 fo
oje
to declin
o
e a 
io
t. 
t. Ho
ccasion
ts had a s
t.  
t. Ho
e y
t.  
g criteria.
t. The 
is
Trust
Trust
Trust
in
with the
ojec
ount of
 the gr
 mak
Dec
wishes you every
pr
The 
projec
priority
other applications
alignment 
this o
decline y
you every succes
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
The 
projec
am
to
awarded a grant
Trust has 
decl
wishes you every
projec
It was n
well 
fundin
to
projec
success with the 
 



$
$
$
ed 
25,000
$
ount 
ov
Am
appr
 
 
 
 

o
st 


$47,045
$75,636
$94,254
$40,940
l Co
ta
To

Projec
 
 
 
 
ew
ew
ew
t Benefit 
 
 
 
a N
a N
a N
u
ea
ea
ea
 
u
u
Projec
Area 
Pap
Guin
Fiji
Pap
Guin
Pap
Guin
 

 
on 
om
ent 
-
 arts, 
 the 
me 
o
ent and 
 
 and
ver 
on fr
icr
f the 
pm
by
f the
o
ws 
and 
tify curr
es that
an inco
 language 
ategy,
ble m
 
ucation 
epik Ri
and dry 
vel
llo
o
kills o
trict 
re, undertakin
et 
on o
3
 f
le S
st 
 de
e 1
 iden
 str
d
 Dis
vati
o
erpris
 earn 
taina
oject.
m
cent
mark
o
able
which
enous s
of th
 
-ent
arket
 
g pr
Mid
ig
g a 
o
 
 m
to harve
t.
in
 preser
es 
ary
earch t
the 
 ec
able t
of a sus
tion, 
p a
plan.
ay 
 ind
vid
 res
o
 mass public ed
ojec
ent 
 housin
t w
r sustain
g the
o
erva
 pr
in
will be 
vel
ent a 
e the
pm
 130
s along 
ns
9
m
o
ld
n
rrec
th f
ch, pro
ect Summ
le 
co
le of the Markha
p
; de
o
o
p
oj
vel
 h
owcas
ups. 
Pr
Undertake
and potential
peo
from
imple
De
enterprise
To
sessio
the c
hyacin
river 
the 201
Sh
peo
establishing a cultural 
outrea
encourag
crafts and cultur
gro
 
 

o
e and
 
g-
 f
 
es 
 
 
n

ent, Inc
n
er
 Trad
m
unit
pm
-Pacific
 
le and
m
o
en Oldi
ifer Bain
sto
undatio
op
vel
ternational 
undatio
Cu
Fo
Pe
Com
De
Gold
Mission
Aid Fiji
HEAPS 
In
Fo
Jenn
Waiko
 
 
 
 
-
86
-
92
-
85
-
71
 
20
77
20
77
20
59
20
74
Request 
ID
20
13
20
13
20
13
20
13

of 
of 
of 
of 
of 
to 
to 
to 
to 
erit 
on 
on 
on 
on 
on 
the 
erit 
the 
erit 
the 
erit 
the 
erit 
e m
e Trust 
e m
e Trust 
e m
e Trust 
e m
e Trust 
e m
h
lication. 
nment 
h
ith 
h
occasi
lication. 
nment 
h
ith 
h
occasi
lication. 
nment 
h
ith 
h
occasi
lication. 
nment 
h
ith 
h
occasi
lication. 
 t
 occasi
 t
 t
 t
 t
 see
er alig
ess w
 see
er alig
ess w
 see
er alig
ess w
 see
er alig
ess w
 see
on this
ur app
ur app
ur app
ur app
ur app
yo
on this 
on this 
on this 
on this 
 succ
yo
 succ
yo
 succ
yo
 succ
yo
 could

ered that other 
the fund. T

ered that other 
the fund. T

ered that other 
the fund. T

ered that other 
the fund. T

 has 
trong
 could
 has 
trong
 could
 has 
trong
 could
 has 
trong
 could
 has 
on 
nsid
of 
nsid
of 
nsid
of 
nsid
of 
eas
 Trust
ct, it
 co
ties 
 Trust
ct, it
 co
ties 
 Trust
ct, it
 co
ties 
 Trust
ct, it
 co
ties 
 Trust
ct, it
n r
oje
to declin
oje
to declin
oje
to declin
oje
to declin
oje
to declin
io
ts had a s
t.  
ts had a s
t.  
ts had a s
t. 
ts had a s
t.  
is
Trust
Trust
Trust
Trust
Dec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
While the
your pr
chosen 





$
$
$
$
$
ed 
ount 
ov
Am
appr
 
 
 
 
 

o
st 

$3,000

$50,000
$27,417
$38,034
$15,931
l Co
ta
To

Projec
 
 
 
ew
ew
t Benefit 
 

 

 
a N
o
a N
o
u
ea
m
u
m
 
uinea 
Projec
Area 
Pap
Guin
Solo
Islands
Pap
G
Solo
Islands
Fiji
 
 
 
 
the 

o
 t
s.
d

rtant
 
e of
 
ort 
s,
o

ween 
 
p
te
ve
t an 
 which 
e of
o
 is an 
rkin
 bet
of 
sup
est 
o
n Islan
o
angr
rical si
eir imp
ent
rtanc
m
r to 
g permanen
protec
o
which
e For
 
o
th
 of w
em
ku and to
ral reefs
p
untain rang
o
 m
each which i
pacts 
e.
to 
o
o
 b
m
rde
ildin
es 
ve 
sts
 im
m
 o
o
e c
s and
so
mm
ral Ha
 in Sol
o
 in
r bu
und hist
eser
e c
est 
ce
 
ra
ill
o
famili
stainabl
o
h
to the i
og
 pr
g an agre
of the
vin
ary
 ar
enerat
 
wm
e Su
vin
 in cent
ss 
 hig
warenes
sa
Pro
mber f
target 
nces
oups in Haku, 
el 
y a
 the Naqir
n
erable 
f ti

rest
g the
o
of th
ect and

 
o
g towards th
s achie
 gr
t and reg
warene
vin
ect Summ
om
agement Pr
und Haku.
ard
of f
ting o
ly vuln
oj
ndin
w
nser
mmunit
h
Pr
Purchase a 
milling o
houses f
outc
Man
Building fe
help prot
history.
Fu
to
the clan
area 
protec
surro
Raise a
co
Santa Isab
Co
plan
hig

ita

 
 
 

unit
ru
 
vin
o Hab
ent
er
mm
m
m
o
p
o
ey Hab
lyn Ha
esh Prasad
sto

vel
Cu
Kgwan Ec
In
Letei C
De
Mari
Priestl
Ravin
 
 
 
 
 
-
39
-
95
-
92
-
58
-
21
 
20
79
20
78
20
75
20
77
20
77
Request 
ID
20
13
20
13
20
13
20
13
20
13

of 
 
to 
to 
ned 
en 

to 

to 

on 
 On 
t.  
 On 
t. 
your 
 


o
 
o
the 
erit 
the 

ver
ere 
ere 
wishe
nment 
e Trust 
e Trust 
h
ith 
e m
h
occasi
lication. 
nment 
h
ith 
est alig
ard
f your
 is a l
re w
nger 
rities.
t wishe
projec
f your
 is a l
re w
nger 
rities.

 t
ties and 
has chos
o
o
 chosen 
o
o
 chosen 
ri
w
 you e
to
t o
t o
t. 
arch
 the
arch
 the
the projec
er alig
ess w
 see
er alig
ess w
Trust 
on bu
th the 
on bu
th 
on this 
ur app
on 
yo
s prio
wishes
ojec
rese
g and
 with str
rese
g and
 with str
wi
ered that other 
 succ
 succ
 your requ
pr
Trust has
Trust has
trong
the fund. T
s wi

 could

ered that other 
the fund. T
licati
licati
 has 
trong
 The 
in
in
on 
ver, 
d
ver, 
d
nsid
of 
nsid
of 
 Trust’
ntributi
Trust 
tes the meri
 the fund's pri
 the 
tes the meri
 the fund's pri
 the 
eas
we
we
 co
to
to
ties 
 Trust
ct, it
 co
ties 
succes
ted that
the
r fun
ur app
r fun
ur app
a co
 no
o
 no
o
n r
oje
to declin
o

 fo
 fo
io
ts had a s
t.  
ts had a s
t.  
g criteria.
t. The 
t. Ho
ccasion
t. Ho
ccasion
is
Trust
Trust
Trust
every 
Trust
 mak
Dec
The 
projec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
It was n
well with 
fundin
to
projec
success with the 
The 
projec
priority
other applications
alignment 
this o
decline y
you 
The 
projec
priority
other applications
alignment 
this o
decline y
you every succes
 



$
$
$
0,000
ed 
$3
ount 
ov
Am
appr
 
 
 
 

o

80
st 

$19,5
$20,000
$33,000
l Co
$250,000
ta
To

Projec
 
 
ew
ew
t Benefit 
 

 
 
a N
o
a N
u
ea
m
ea
 
u
Projec
Area 
Pap
Guin
Solo
Islands
Fiji
Pap
Guin
 
 

ew 

y to

on 
 Cook
og
 
 
o
unitie
ta.
 
vati
m
 and
ysiol
m
-led 
h
ea can be 
o
n
nser
in
unities at N
d James
o children'
hin
ri Del
 of the
e Arnav
o
 based 
u
damages 
e c
rt
w
lp
o
 th
ral p

o
o
o
w G
 th
p
e t
Kik
ent
and c
 c
 
p
tre an
 d
o
m
e in
ysian
r th
o
 
 
g o
 the 
irst wome
lore
 Cen
n.
ted t
’ f
xp
Mala
o
ary
 produc
search 
re in
 e
 culture. 

Papua Ne
o
establish
o
e island and
tati
 trainin
atang
s rela
 enterpris
 a re
e to
ral
untable f
y; and
lkl
slands
e h
o
 th
res
ok
m
n I
 
at
o
cc
o
e change, 
ect Summ
ea Bin
mo
 def
gramm
mise co
oj
ry bo
pport the 
lo
vestig
Pr
climat
Undertake
Guin
Universit
sto
dugong fo
Su
So
ecotouris
Islands.
Undertake
pro
opti
In
companies in 
made a
caused t
from

rust 
of 

Ne
 
 
lphin 
o
 
er
ersit
y of 
 
 
m
vancy T
d
ect
sto
nser
ckland
lan
Cu
Snubfin D
Proj
The Nature
Co
The Univ
Au
Universit
Eng
 
 
 
 
-
72
-
04
-
11
-
57
 
20
63
20
69
20
75
20
76
Request 
ID
20
13
20
13
20
13
20
13

of 
of 
ned 
en 
 

 On 
to 

t. 
to 
to 
your 
 

o
on 
on 

ver
ere 
erit 
erit 
the 
est alig
nger 
rities.
e m
e Trust 
e m
e Trust 
ties and 
has chos
ard
f your
 is a l
re w
t wishe
h
lication. 
nment 
h
ith the 
h
lication. 
nment 
h
ith 
w
o
o
 chosen 
occasi
occasi
 you e
 t
w
 t
to
 
t o
t.
arch
 the
the projec
ess 
Trust 
on bu
ess w
th 
 see
er alig
 see
er alig
s priori
on 
ur app
ur app
ojec
rese
wi
on this 
on this 
 your requ
wishes
g and
 with str
Trust has
yo
yo
 The 
pr
in
licati

 succ
 succ
 could

ered that other 
the fund. T

ered that other 
the fund. T
 has 
trong
 could
 has 
trong
on 
d
 Trust’
ver, 
ntributi
Trust 
tes the meri
 the fund's pri
 the 
nsid
of 
very
nsid
of 
eas
we
to
ct, it
ct, it
ted that
r fun
ur app
a co
 no
o
 Trust
 co
ties 
 Trust
 co
ties 
n r
o

 fo
oje
to declin
oje
to declin
io
g criteria.
t. The 
ct. Ho
ccasion
ts had a s
t.  
ts had a s
t.  
is
with the
Trust
je
Trust
Trust
 mak
Dec
It was n
well 
fundin
to
projec
success with the 
The 
pro
priority
other applications
alignment 
this o
decline y
you every succes
While the
your pr
chosen 
The 
projec
the priori
wishes you e
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
 
 



$
00
 $
$
,000
5.
ed 
$12
24
1,

ount 
ov
$8
Am
appr
 
 
 
 
 

o

35
,6

st 
$5,001

30
 $48,246
$55,000
l Co
$322,370
,1
ta
 $1
To
Projec
 
 
 
ew
t Benefit 
 
esia
esia 
a N
u
ea
on
on
 
Projec
Area 
Pap
Guin
Fiji
Federated 
States of 
Micr
Federated 
States of 
Micr
 
 

 
h
 
 
ter 
ks in
 
o
uth 
th 
 ‘The 
 the 
 the 
ent and 
 nig
ary 
n
m
Yo
r bo
, and
 wrec
ard
rk
es of
ife 
ugh a 
which
egu
u
monial
y in Fiji t
ased o
al

ro
velop
al, cultural and 
g L
uld generate if
acific Islands.
on fo
 legend
and a Disas
r ship
 v
h
tiv
ci
o

ere
o
stud
un
 P
ati
vey wo
y f
le t
Yo
e w
m
p
e so
initia
ue c
on the
ility 
h
m
 
e and saf
o
iq
the 
m
 
trateg
ary
ot
g pe
 cultural de

asib
ed in the
our ani
ment 
and t
n S

om
pact 
-h
hnpei Island, b
n
y led
age
 our un
m
n
 a fe
 required sur
g progra
wo
elen’.
f Po
ctio
e, pr
 Bainin
 o
ic i
Lu
agoo
e cultural heritage
r underst
rin
 establish
 a t
 management plan
edu
ect Summ
erv
u
om
o
ry o
n
k of 
oj
te
Pr
Pres
uniq
Uramat
communit
youth eng
focuses
and day dances
Undertake
bet
eco
ment
it was
Create
adults and children, 
histo
Boo
Undertake
create
Risk R
Chuuk L

 

 
esia 
td 
 
 L
 
oup
n
ects 
n
er
 Bainin
us 
ife Ne
oj
m
d Trust
 Pr
sto
entity Gr
ung L
 
undatio
undatio
Cu
Uramat
Indigeno
Id
Yo
Zealan
Care Micron
Fo
Major
Fo
ESIA
 
 
N
 
 
-
57
-
15
O
R

-
31
-
59
 
20
77
20
77
C
20
79
20
76
Request 
ID
20
13
20
13
MI
20
13
20
13

 
of 
of 
 
of 
to 
to 
to 
erit 
on 
on 
on 
the 
erit 
the 
erit 
the 
e m
e Trust 
e m
e Trust 
e m
e Trust 
h
occasi
lication. 
nment 
h
ith 
h
occasi
lication. 
nment 
h
ith 
h
occasi
lication. 
nment 
h
ith 
 t
 t
 t
 see
er alig
ess w
 see
er alig
ess w
 see
er alig
ess w
on this 
ur app
ur app
ur app
yo
on this 
on this 
 succ
yo
 succ
yo
 succ
 could

ered that other 
the fund. T

ered that other 
the fund. T

ered that other 
the fund. T
 has 
trong
 could
 has 
trong
 could
 has 
trong
on 
nsid
of 
nsid
of 
nsid
of 
eas
 Trust
ct, it
 co
ties 
 Trust
ct, it
 co
ties 
 Trust
ct, it
 co
ties 
n r
oje
to declin
oje
to declin
  
oje
to declin
io
ts had a s
t. 
ts had a s
t.  
ts had a s
t.  
is
Trust
priori
Trust
Trust
Dec
While the
your pr
chosen 
The 
projec
the 
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec 9(2)(b)(i)
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec


$

.0

$0 
$0 
$
$0
ed 
ount 
ov
Am
appr
 
 
 
 
 

o

46
,7

st 

$36,500
39
$12,000
9(2)(b)
(i)
$85,000
l Co
$1
ta
To

Projec

d
 
 
 
 
 
t Benefit 
 
Projec
Area 
Guam/
Northern
Mariana Islan
Nationwide
9(2)(b)(i)
Southland
 
 
 
of 

 
 
 
Guam,
 
m
asin
tion 
ss 
 
o
anoe
elling 
cation.
enta
f c
y-t
m
larships, 
or
edu
ect acr
n o
 of incre

the Chatha
ailug Seafaring 
ple
o
sts

scho
o
tati
ital st
o
 
e Pi
e c
 peac
es f
 
te; im
men
 dig
ote
tuary.
ary
of Th
m
an, with 
 and
eehiv
ent 
 websi
 docu
 
 pro
 Saip
tion;
 
of b
 and
 to
ailug Seafaring Proj
g and
g towards th
ect Summ
ect
 and
shops.
oj
nstruc
rk
ndin
Pr
Establishm
Proj
The Pi
Rota
filmin
co
wo
Fu
capacity
9(2)(b)(i)
Purchase 
Islands Bee Sanc
 
 
 and
ies 
 
ew 
 
 
 
tud
er
ery
m
oa N
d Peace
sto
 
Cu
Sylvia Frain
AND
Aotear
Zealan
Conflict S
Centre Trust
9(2)(b)(i)
Kaai Silb
 
EAL
 
 
 
-
02
-
51
-
63
-
79
 
20
70
20
77
20
76
20
75
Request 
ID
20
13
NEW Z
20
13
20
13
20
13

 
of 
of 
ned 
en 
ned 
en 
 

 On 
to 

t. 
to 
to 
your 
 

o
on 
on 

ver
ere 
erit 
the 
erit 
est alig
nger 
rities.
e m
e Trust 
e m
ties and 
has chos
The Trust
ith the 
est alig
ard
f your
 is a l
re w
t wishe
lication. 
nment 
h
ith 
lication. 
nment 
w
ties and 
has chos
h
h
w
o
o
 chosen 
occasi
occasi
 you e
t o
 t
 t
est. 
to
 the
str
the projec
ess 
t. 
arch
Trust 
priori
Trust 
on bu
ess w
th 
 see
er alig
 see
er alig
s priori

on 
ur app
ur app
ojec
rese
wi
on this 
on this 
 your requ
wishes
g and
 with 
Trust has
yo
yo
 The 
 succ
 your requ
 The 
pr
in
licati

 succ
 could

ered that other 
the fund. T

ered that other 
 has 
trong
 could
 has 
trong
on 
d
 Trust’
ver, 
sid
of 
 your requ
very
 Trust’
ntributi
Trust 
tes the meri
 the fund's pri
 the 
n
nsid
eas
d
we
to
ct, it
o
ct, it
ted that
ted that
r fun
ur app
a co
 no
o
 Trust
 c
ties 
 Trust
 co
n r
o
 
o
plications

 fo
oje
to declin
oje
to declin
io
g criteria.
y fun
g criteria.
t. The 
t. Ho
ccasion
ts had a s
t.  
ts had a s
is
with the
ject.
with the
Trust
er ap
Trust
 full
 mak
Dec
It was n
well 
fundin
to
wishes you e
pro
It was n
well 
fundin
to
projec
success with the 
The 
projec
priority
oth
alignment 
this o
decline y
you every succes
While the
your pr
chosen 
The Trust
projec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
 
 


$0 
$
$
0,000
ed 
$30,000
$1
ount 
ov
Am
appr
 
 
 
 
 

o
st 


$60,137
$30,000
$95,000
$50,000
l Co
$171,806
ta
To

Projec
 
 
 
-
 
n
 
 
t Benefit 
gto
ganui
ckland
Projec
Area 
Au
Wellin
Taranaki
Manawatu
Whan
Northland
 
 
 
 in 

 
ater
unity
ms or 
 
 blu
ātua
ting 

i, 
ith 
m
te
unity
or
w
astal 
ys and
m
m
ttle
ese birds 
p
with 
com
osys
kau
ups w

of li
ga 
ed co

terwa
lymouth, and 
for th
r Free Ne
cate 
s with i
th
the Upper 
h
bsonville
k com
ease 
 gro
 t
o
P
g mobile 
s of 
 of sup
o
age ec
 own freshw
 
 in 
wa
tus 
ran
 
vo
 H
ree
u
rin
e.
sts
y of 
 incr
ek 
o
o
link
o
edat
unity
cus in
 
e sta
 New 
āta
 change 
e c
 
y man
of their
/Pr
ationship
g threaten
tion Ad
s Cre
undary.
mm
ect.
f th
ve
a m
 monit
owledg
o
ary
vel
ecifically
th fo
aches in
earch t
rā) in
capabilit
ent 
g o
ro
ests
erva
ecti
Cannon’s C
 and
ns
cal c

ā (wi
ellyer
pm
 res
city bo
o
ko
e positi
ent of 
(includin

ems) sp
at
/H
on proj
h
re e
m
o
vel
pm
g towards th
g closer rel
o
ment
g their kn
d Co
ect Summ
o
rati
syst
t). 
o
oj
crease the 
 m
pport the 
vel
ndin
Pr
In
to
species 
eco
Waite
Oruam
shell barrier be
Poin
Su
the de
rest
Undertake
understandin
penguins (
encourag
within t
De
assess
application, with vlog 
sharin
Fu
Northland For
Zealan
buildin
hapu and lo
 
 

 
 
 
 
ject
 
ety
tuary
tion
 
 
ted
ci
o
est And 
f New
er
tu Marin
m
ve S
rotec
y O
d Inc
ātiki Pro
rpora
 
 For
sto
co
Cu
Kaip
In
Karori Sanc
Trust
Nga Mo
Reser
Ngati Rangi Trust
Royal
Bird P
Societ
Zealan
 
 
 
 
 
-
08
-
73
-
63
-
40
-
78
 
20
61
20
67
20
77
20
74
20
59
Request 
ID
20
13
20
13
20
13
20
13
20
13

of 
of 
 
of 
to 
to 
to 

on 

on 
 

 On 
t. 
o
on 
the 
erit 
erit 
ere 
erit 
 th
the 
e Trust 
e Trust 
e Trust 
h
ith 
e m
e m
e m
h
th
occasi
lication. 
nment 
h
h
occasi
lication. 
nment 
h
ith 
f your
 is a l
re w
nger 
rities.
t wishe
h
occasi
lication. 
 t
o
 chosen 
 wi
 t
o
t o
 t
 the
the projec
ess w
arch
 see
n bu
er alig
ess
 see
er alig
ess w
o
th 
 see
on this 
ur app
ur app
ur app
yo
on this 
yo
rese
on this 
g and
 with str
ati
Trust has
wi
yo
the fund. T
 succ
 succ
 succ

 could

ered that other 
the fund. T

ered that other 
the fund. T

ered that other 
 has 
trong
 could
 has 
trong
in
 could
 has 
on 
d
of 
ver, 
nsid
of 
nsid
of 
tes the meri
 the fund's pri
 the 
nsid
eas
we
to
ties 
 Trust
ct, it
 co
ties 
 Trust
ct, it
 co
ties 
 no
r fun
ur applic
 Trust
ct, it
 co
n r
 
oje
to declin
 
oje
to declin
 fo
oje
to declin
io
t. 
ts had a s
t. 
ts had a s
t.  
t. Ho
ccasion
is
Trust
Trust
Trust
Trust
ojec
Dec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
pr
The 
projec
priority
other applications
alignment 
this o
decline yo
you every succes
While the
your pr
chosen 
The 




$
$
$
$
ed 
ount 
ov
Am
appr
 
 
 
 

o
st 

$2,479

$20,000
$80,500
$15,000
l Co
ta
To

Projec
 
 
 
nia
 
 
 
edo
t Benefit 
rbury
 Zealand/ 
 Cal
ckland
stralia/
Projec
Area 
Au
Cante
Nationwide
New
Au
New
 

of 
 
 is 
o
 
vel
 
ss 
ity


aim
 
of 
 fairy 
nia 
erm
 
o
el cla
ctiv
 a
obial, t
m
o
 to acti
d
icr
mber 
o
within
n linkages
of the
unds are 
em
rk 
Fairy Tern 
e long-t
a nov
go
RSA), the 
o
areas in th
rder to 
light the 

ers 
ity fr
w Caled
antim
f a nu
h
llutio
egional polic
un
g th
of 
ant 
M
mpo
r th
l w
o
 o
mb
 in o
 hig
acifi
m
 fo
 
ery 
o
c po
P
ntr
ew
 

me
m
o
 
werin
ka.
ov
xhibited 
-resist
mised 
o
 natural 
ch t
es.
th
ct 
these co
 
vents
ealand, Ne
ary
po
rests
at e
 aureus (
opti
 
-plasti
onal and r
nne
on c
m

SA.
ekape
t disc
h
o
R
eed c
ificant
and revi
p
ccus
 w
esear
trict.
ons e
ent of 
 co
vati
ew Z
to e
eir fo
ethicillin
o
 nati
 strategi
ecen
p an 
o
to
t th
unds t
ine h
 dis
nser
o
oa N
ting M
e change
ork 
o
ect Summ
iew 
p
st M
hyloc
vel
bi
s and
oj
 de
erm
hi
 existing
Pr
the v
protec
survival of 
After a r
com
again
Stap
to
det
in
Undertake
lowland sign
Timaru
Attendance 
United Nati
undertake r
climat
in
plan
Establishm
Netw
tern c
Aotear
of 

ct 

 
 
 
er
ersit
y of 
 Distri
 
on
m
rbury 
ch & 
sto
ckland
uncil
novati
Cu
The Univ
Au
Timaru
Co
Trisia Farrell
Universit
Cante
Resear
In
 
 
 
 
-
79
-
51
-
08
-
78
 
20
69
20
71
20
76
20
76
Request 
ID
20
13
20
13
20
13
20
13

 
of 
 
of 

to 
to 
en 
to 
ns 
in
ake
on 
on 
d
ct. 
the 
erit 
the 
aligned 
the 
erit 
the 
nment 
e Trust 
e Trust 
h
ith 
e m
e m
h
occasi
lication. 
nment 
h
ith 
est 
ith 
h
occasi
lication. 
nment 
ith 
est alig
nd fun
en to m
r proje
 t
ties and 
has chos
The Trust
 t
os
est. 
es a
er alig
ess w
 see
er alig
ess w
nd. The Trust 
Trust 
ess w
 see
er alig
ess w
s you
on this 
ur app
s priori
on this 
ur app
riti
o
ard
 succ
yo
 succ
 your requ
 succ
yo
 succ
 your requ
trong
the fund. T
t has ch
w
 could

ered that other 
the fund. T

ered that other 
the fu
 has 
trong
 The 
 could
 has 
trong
o
on 
of 
nsid
of 
 Trust’
of 
 your requ
nsid
on t
eas
d
e Trus
ties 
 Trust
ct, it
 co
ties 
ct, it
ted that
 Trust
 co
ties 
ted that
n r
 
oje
to declin
o
oje
to declin
 
o
 Trust's pri
io
ts had a s
t. 
ts had a s
t.  
g criteria.
y fun
t. 
ts had a s
t. 
is
Trust
with the
Trust
ntributi
ojec
 full
Dec
projec
the priori
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
pr
It was n
well 
fundin
to
wishes you every
projec
While the
your pr
chosen 
The 
projec
the priori
wishes you every
projec
It was n
with the
criteria. Th
a co
 
 
 


$
$
00
0.

7,000
ed 
$4,000
00
$
4,
ount 
ov
$4
Am
appr
 
 
 
 
 

o

33
,2

st 
$5,460

$30,151
$11,700
64
$23,854
l Co
$7
ta
To

Projec

 
 
 
ga
n
t Benefit 
o
 
To
Projec
Area 
Bay of Plent
Waikat
Otago
Niue/
 

on 
 
ts 
sts 
es: 
on 
 
ain
m
taki
g co
 
 
ent in 
vati
in
 
m
and
e change 
pm
o
nser
 
ein 
nga; and
 and 
 constr
sal and insect
am
ka; 
the Wai
Forest.
 and
o
at
co
ers, includin
 legal, 
program
ot
o
n
m
evel
ern.
m
io 
of 
od 
tio
cli
ve 
Pr
ogr
 in T
y t
gists
lo
tional
 disp
ent 
 Fo
tec
ery d
pro
ct far
o
acy
eef 
 
sect 
m
cuss the
the pr
pm
 im
o
o
ens'
voc
ral r
ary
o
waste
 nurs
the fair
 dis
 institu
asifika rad
ati. 
al pro
o

o
g, 
vel
m
o
a, K'Aute Pasifi
ther inse
f the In
in
o
m
 o
wards 
y Gard
y and
m
o
ey P
on ad
on c
m
es f
on, ent
ers, t
l. 
ma
ee k
Sa
ver Kirib
vati
o
ect Summ
om
lator
o
shop 
oj
mbers
sect far
ntr
pport t
mmunit
nser
rk
Pr
and Australia t
outc
Bring toge
me
Associati
research
regu
in
co
Su
of thr
Talofa 
Cross
Continued de
Co
Marine 
co
wo
adaptation and


-
Ne
 
nd
o
 


ting 
er
y of 
 

m
d
unit
unit
m
m
ens Trust
sto
lan
 
Cu
Universit
Eng
Waikat
Com
Broadcas
Charitable Trus
Waitaki 
Com
Gard
 
Alana Richm
Rex
 
 
 
ESIA
 
-
33
-
77
-
46
-
38
 
20
75
20
76
20
77
20
77
Request 
ID
20
13
20
13
20
13
POLYN
20
13

 
 
of 
of 
of 
 On 
to 

t. 
to 
to 
to 
 
ere 
erit 
on 
on 
on 
the 
erit 
the 
erit 
 success
f the 
e Trust 
e Trust 
e Trust 
a low
re w
nger 
rities.
e m
e m
e m
o
o
 chosen 
t wishe
h
occasi
lication. 
nment 
h
ith 
h
occasi
lication. 
nment 
h
ith 
h
occasi
lication. 
nment 
h
t o
 t
 t
 t
 the
the projec
every
el is 
on bu
 see
er alig
ess w
 see
er alig
ess w
 see
er alig

th 
ur app
ur app
ur app
o
trav
on this 
on this 
on this 
 
g and
 with str
Trust has
wi
yo
yo
yo
licati

 succ
 succ
 could

ered that other 
the fund. T

ered that other 
the fund. T

ered that other 
the fund. T
 has 
trong
 could
 has 
trong
 could
 has 
trong
on 
es y
ect. 
ver, 
tes the meri
 the fund’s pri
 the 
nsid
of 
nsid
of 
nsid
of 
eas
we
 wish
 no
r fundin
to
ur app
ct, it
ct, it
ct, it
o
 Trust
 co
ties 
 Trust
 co
ties 
 Trust
 co
ties 
n r
 proj
oje
to declin
oje
to declin
oje
to declin
io
t. Ho
ccasion
ts had a s
t.  
ts had a s
t.  
ts had a s
is
Trust
Trust
Trust
Trust
ojec
ojec
Dec
The Trust
with the
The 
projec
priority fo
other applications
alignment 
this o
decline y
you every succes
While the
your pr
chosen 
The 
projec
the priori
wishes you every
pr
While the
your pr
chosen 
The 
projec
the priori
wishes you every
pr
While the
your pr
chosen 
The 
projec
the priori




$
$
$
$
ed 
ount 
ov
Am
appr
 
 
 
 

o
st 


$98,779
$22,000
l Co
$104,000
$250,080
ta
To

Projec
 
 
 
t Benefit 

 
a/ 
 Zealand/ 
k Islands
nga
stralia
Projec
Area 
Samo
To
Samo
New
Au
Coo
 
 

-
 
 
m
we
 
 
staff 
0
 and
eir 
 
o

a 1
n
; and
p
 and
 th
 and
g o
will 
m
unities.
f three 
sin
owledge
at 
 o
m
ral and
 deliver 
cu
kn
y Union
h
e island o
ting 
istorical
ks, fil
o
and 
m
o
ce and 
on
o
b
 h
fo
y of curriculu
e t
tional and 
m

 co
f c
tal

 
in
r th
 
o
ien
 
o
ence 
ver
o
 o
odati
e Rug
es.
eng
duca
of the
with 
 
 Apia t
at f
nga.
o
arenes
rksh

o
f e
Pacific
ss 
ugh sc
mm
ts sci
 elit
tiviti

rtance
ry, 
ary
o
e t
o
ro
w
o
 t
boa
y bo
s o
o
h
e in T
rkshops pr
tal aw
po
 acc
rie
castl
ve 
g spor
ant
ent and deli
unit
n
o
m
en
warene
ev
m
 se
m
ve workshops.
 and
tensi
pin
pm
o
m
e a
ect Summ
 New
o
ystems t
el
elo
'unga'o
logical i
-s
oj
o
eliver a
 rais
digenous histo
teracti
Pr
Niue. 
Travel
from
day in
dev
skills rel
dev
and practical ac
Purchase of a 
the c
M
D
practical w
environ
sustainability f
To
eco
eco
in
in
 
 
o
 
 
 
ller
er
combe
mili
o
m
a Fa
 M
sto
Cu

Ben Das
Bianca Tukukin
Failo
Myra
 
 
 
 
-
21
-
56
-
91
-
90
 
20
75
20
65
20
75
20
78
Request 
ID
20
13
20
13
20
13
20
13

 
ned 
en 
 

ned 
en 
 On 
to 

t. 
your 
 

o
the 

ver
the 
ere 
ith 
est alig
nger 
rities.
ties and 
has chos
ard
est alig
ith 
f your
 is a l
re w
t wishe
w
has chos
The Trust
o
o
 chosen 
 you e
ties and 
to
t o
t. 
 the
the projec
ess w
iori
est. 
arch
Trust 
Trust 
ess w
on bu
th 
s priori
on 
ojec
s pr
rese
wi
 succ
 your requ
wishes
g and
 with str
Trust has
 The 
pr
 your requ
 The 
 succ
in
licati

on 
d
 Trust’
ver, 
ntributi
Trust 
 Trust’
 your requ
tes the meri
 the fund's pri
 the 
eas
d
we
to
ted that
r fun
ur app
a co
ted that
 no
o
n r
o

o
 fo
io
t.  
g criteria.
t. The 
g criteria.
y fun
t. 
t. Ho
ccasion
is
with the
with the
Trust
ojec
 mak
 full
riority
Dec
wishes you every
pr
It was n
well 
fundin
to
projec
success with the 
It was n
well 
fundin
to
wishes you every
projec
The 
projec
p
other applications
alignment 
this o
decline y
you every succes
 
 
 
 

$
00
24
,000
9.
,4
ed 
$10
$18,179
17
60
5,
$1
ount 
ov
$3
Am
appr
 
 
 
 
 

3
o
55
,6

57
st 

$25,000
$18,179
$53,763
95
77,
6

l Co
$5
ta
$2,
To
Projec
 
 
t Benefit 
 
esia

oa
yn
Projec
Area 
Sam
French 
Pol
Samo
 
 
o

 t
-

ess 
ves
of th
 at 
 
 
 
e an in
 
d
as well as 
 
ata'a
n
o
g and
 a
ent in th
crease 
pm
and busin
 alternati
sage, 
tice and
edge.
is species
 provid
f M
lationship. This
u
sessment 
h
o
nnin
rism
o

u
ers 
o
ce 
and in
of t
will
vel
ve re
-t
knowl
o
e pla
er, 
ss 
 th
e de
 
 redu
nal 
 that 
al farm
o
m
ary
u
to
igenous prac
pulation as
o
 
-mangr
ture eco
eld sit
vid
warene
e.
onal analysi
 infor
fu
di
th biodegradable
 a p
esearch
e ind
y a
man
e traditi
e in
s wi
in order 
 
uesan Kingfish
f declin
out r
ect Summ
e hu
e.
cational fi
oj
vid
lag
Pr
Pro
owner
plastic 
encourag
celebrat
Undertake
Marq
communit
risk o
Carry 
depth situati
villag
analysis will
direction of 
edu
vil

 de 
of 

 of 
gie
 
men'
o
lo
 

er
on
 
ersit
m
 W
ers
é 
ésie
sto
moa
yn
Cu
Sa
Associati
Grow
Sociét
d'Ornitho
Pol
The Univ
Newcastl
 
 
 
-
95
-
85
-
04
 
20
77
20
77
20
75
Request 
ID
20
13
20
13
20
13


Minutes of Meeting of the Advisory Trustees of the 
PACIFIC DEVELOPMENT AND CONSERVATION TRUST 
Held at M1.01, 45 Pipitea Street, Wellington  
on Thursday 6 November 2020 commencing at 10.00am 
PRESENT 
Sai Lealea (Chair) 
Jannitta Pilisi 
 Ruth 
Sio-Lokam 
 Kim 
Wright 
 Barbara 
Hayden 
 
 Patrick 
Holmes 
Brenda Wraight (via Zoom) 
IN ATTENDANCE 
Joe Grace – Manager National Funds 
 Joanne 
Becker 
– 
Advisor 
 Linda 
Waasdorp 
– 
Funding 
Administrator 
1.
Welcome and apologies
Meeting was opened by Ruth Sio-Lokam with a prayer.
The new Advisory Trustees were welcomed and all those present at the meeting
introduced themselves.
House Keeping
Joanne advised the Advisory Trustees of emergency procedures in the case of an
earthquake or fire, and advised of where the bathrooms were.
2.
Confirmation of previous minutes
The minutes of the Pacific Development and Conservation Trust (Trust) meeting held
on 1 July 2020 were confirmed as a true and accurate record.
Barb Hayden/Jannitta Pilisi 
3.
Matters Arising
3.1 GCMS 
Trustees discussed the issues they had had in using the GCMS system.  The following 
issues were identified: 
x  Order of the applications 
 

x  Not been able to find the next application on the list after submitting a 
reviewed application.  This resulted in some applications not been reviewed by 
some Trust members. 
x  The preview function did not work well. 
x  Some of Brenda’s comments had been recorded against the wrong application. 
x  Difficulty of not been able to identify the application locality or region. 
The Trustees appreciated seeing a spreadsheet of members comments before the 
meeting. 
ACTION: DIA staff to enquire whether it was possible to list the applications by region 
in GCMS.   
Where groups provided a scanned version of their application with pages in separate 
files, DIA staff were asked if it was possible to combine pages so they are viewing the 
application in one file, instead of across several files.  
Sai suggested a refresher on GCMS could be organised before the next Advisory 
Trustees meeting. 
4.
Accountability reports received – separate booklet
The Trustees acknowledged the reports received, and discussed the following:
4.1    9(2)(b)(ii)
The contact for the project had not replied to a number of requests from the
Department for an update on the projects progress.  Four weeks ago contact was
made with the Solomon Islands High Commission to see if they were aware of the
project.
ACTION: DIA staff to inform the Trust as soon as a response from the Commission had
been received.
a.
9(2)(b)(ii)
A request had been received from the 9(2)(b)(ii)
.  The Trust 
approved the extension. 
Barb 
Hayden/Ruth 
Sio-Lokam 
5.
Funds available for distribution
The Advisory Trustees noted that there was $245,073 available to allocate for the
2020/21 funding rounds.
 

A hard copy of the Finance Report on investments was available for the Trustees to 
look at.  Janine Legarth was available to attend the meeting should any questions 
arise.   
The Trustees sought assurance that the fund investments were safe and secure.  This 
assurance was given by DIA staff. 
6.
Declarations of Conflicts of Interest
Sai Lealea and Barb Hayden identified conflicts of interest as follows:
x  Barb Hayden – PAU3 Industry Association Incorporated 
x  Sai Lealea – Pam Fergusson Charitable Trust 
7.
2020/21 PDCT first funding round requests
The Advisory Trustees considered 37 applications for funding. Of the 37 applications,
ten applications were recommended for funding totaling $122,702 and 27 applications
were recommended for decline. The Advisory Trustees’ recommendations and
comments are set out in the Recommendation Schedule, attached as an Appendix to
these minutes.
8.
Date of next meeting – before 27 May 2020
Joanne confirmed that the meeting needs to be held before 27 May 2020. The
Advisory Trustees confirmed their availability for a meeting on 6 May 2021.
Meeting concluded at 2.00pm with a prayer from Jannitta. 
Chair: _____________________________ 
Date:_______________ 
 

APPENDIX 1 
 

 
 
ts 
ere
en 
 
ct, 
ever, 
os
ojec
the 
w
 you 
The 
oje
o
to the 
es
e Trust's
ect.
the 
t has 
er pr
of 
 there w
ect. 
 with 
ent 
 your 
th
ect. H
t has ch
m
 wish
e proj
with th
your pr
 o
ties 
cess
g and
e Trus
of 
ns 
 proj
in
ur
d
 
s your proj
with th
erit 
 priori
y suc
er
nger align
ered that
est alig
ia. The Trus
ard
e m
 the
of yo
r fun
o
casion th
lication but
ect.
cess 
h
en to decline
o
 ev

ro
oj
w
 t
os
y f
oc
o
nsid
 suc
o
 you
rit
ent t
ur app
 see
 c
 
meri
 this 
ur requ
g criter
on t
 with st
yo
the pr
in
sion ch
the 
 prio

 yo
d
every
w
 could
 Trust
wishes
rding
o
 with 
o
tes 
 fun
ntributi
you 
occa
 W
 no
s a l
cess
co
ted that
es 
 and
 Trust
nger alignm
to declin
o
o
 
ion
e a 
on this 
y suc
er
ject.
 mak
Decis
The Trust
research i
other applications
fund's priorities. On
chosen 
ev
It was n
priorities
to
Trust wish
While the
it has 
application. The
had a str
fund. The Trust 
pro
 
 
 
 
 
ed
$0
$0
$0
206
$17,
ount 
m
A

Recommend
 

 
 
 
 
 
82
82
846
499
ested
$6,4
$6,4
 
ount 
$27,
$35,
m
A

Requ
TRALIA
 
AUS

 by 
n


t, 
ys 
rder 
MELANESIA 
er, 
p
er 
tio
ed 
 use 

 
tic 
ip
w
 
y, 
 in o
s (Kai

o
y in 
ciat
 enabl
o
eliver
o
mio)
ern wa
f their 
 build 
 
 ch
o
 d
o
y
w Guinea
ens held
 
od
ersit
 o
lar p
s t
P
ers t
out ho
ar
er gene
f Ne
o
tcher
e produc
; and
all-scale
cim
seums,
rm
m
 mod
odiv
le
m
f Ne
u
a w
 East 
bi
itality
p
 s
 bett
ed so
reas
wo
tion and
 far
ries ab
es and clan
g spe
of 
t and ass
o
y and
o
anding o
 
to
 peo
 in the ha
 inc
ar
tain 
ct Summ
ks t
typing o
ean wild dogs
ase 
m
mpos
m
 and
stralian m
o
 obtain a
rch
sects and 
crease
 main
d
Proje
apua New Guinea 
Undertake
geno
native d
Au
to
underst
Guin
Pu
and upgrad
syste
order to
of c
in
the produc
of chic
in
Gather s
P
communiti
Wanang and
custo
to
health and v
lan
gs 
 
o
e, 
of 
 
y of 
en 
e
ks, 
 and
 
ild D

eitei 
entit

 Centr
 Chick
ery,
capes 
 insights 
g Floc
rs
ct Nam
e id
rt fo
g at T
acultur
oods
 th
 Guinea
in
21 
m
 
to
 
Proje
20/
Genetic
in
New
Highland W
Suppo
Hatchery,
Breedin
Tree Nu
Per
Train
Livelih
Fiji
PNG Lands
Life
0
 
 
O 2
 

on
er
lo

f the 
stralia
m
u
o
vati
kas 
ungo
Custo
Lou
Ko
Corals f
Conser
Friends o
Earth Au
 
 
 
est 
-
27
-
51
-
28
21
49
21
52
21
52
PDCT ROUND TW
Requ
ID 
20
15
20
15
20
15

 
ts 

ts 
ct, 
es 
en 
 
ct, 
oje
ojec
the 
t has 
os
of 
oje
ojec
the 
the 
with th
 wish
e Trust's
ts 
every
the 
r pr
er pr
of 
e
of 
 your 
th
 with 
e Trus
you 
 your 
th
 with 
your pr
 o
ties 
well 
t has ch
with th
 aspec
es 
your pr
 o
ties 
of 
cess
 Th
e Trust
of 
cess
ned 
 
t.
ns 
es and 
erit 
 priori
y suc
erit 
 priori
y suc
er
est. Th
s some
er
e m
ered that
e m
ered that
h
en to decline
 the
ev
est alig
g criteria.
projec
est alig
ia. The Trus
ard
tage sit
Trust wish
h
en to decline
 the
ev
 t
o
equ
o
os
nsid
in
w
 
 t
os
nsid
o
d
o
t.
o
 see
 c
ent t
 you 
 The 
ent t
 you 
 fun
th the 
 see
 c
 
g criter
on t
the heri
ol.
ojec
sion ch
in
o
 your requ
s wi
 your requ
d
pr
sion ch
 could
 Trust
wishes
 and
 could
 Trust
wishes
rding
o

occa
 fun
ntributi
 being 
occa
rities
tal sch
 W
 Trust
nger alignm
o
succes
co
ct,
nger alignm
o
 Trust 
ted that
ted that
 and
en
 Trust
 
o
to fully fund your r
o
m
o
 
ion
oje
on this 
e a 
on this 
ject.
 every 
r pr
ject.
 mak
Decis
While the
it has 
application. The
had a str
fund. The
pro
It was n
Trust’s pri
chosen 
you
It was n
priorities
to
you
environ
success with the 
While the
it has 
application. The
had a str
fund. The Trust 
pro
 
 
 
 
 
ed
$0
20
00
$0
$6,7
$5,0
ount 
m
A

Recommend
 

 
 
 
 
1
000
20
000
,87
ested
$6,7
 
ount 
$35,
$50,
m
$293
A
Requ

 
 
h

ps 
 
o

 
o
-
o
 
o
 a
le

r t
es 

uses 
 
n. 
unity 
 for 
fo
o
 
 non
rksh
tage 
m
with 
viab
 
 nurser
o
tati
m
will als
ss 
rld
med
 Ialibu t
 and
 
e and 
 
 
i villag
alisin
mber t
o
o

y

men, in 
it
 and
es
 the 
in
es
nal Fijian
table 
 ti
y; and
res
W
y ai
 the villag
ar
slat
ri
terials 
ellite
ev
o
o
eas;
s of w
 wo
por
of c
tions 
ay 
unit
trengthening 
 along 
rser
to
within
sto
f vanilla and 
tion and
us
warene
 D
 tran
ent and 
Taveun
 at r
r building ho
m
med at
speci
 provid

traditi
 enable
m
anisa
out,
y a
es on 
ent
es 
 to
ose 
tion of tw
mber 
 ai
on o
 serie
ve 
o
 cultural heri
m
of 
o
ugh ref

 t
o
m
ct Summ
 fi
 th
rati
o
ill
e c
re a
g and
o
ver a
vin
illed fo
o
t on degraded
ted land ar
nstruc
r indigeno
 Fiji aimed
stitutional s
Proje
capacity
share
Purchase of ma
establishm
co
sustainable sat
centres,
rest
native tre
Deli
fo
four t
in
the art 
wea
Purchase of a 
sawm
be m
for th
rest
site thr
In
with a nu
based org
be carried 
communit
program
Environ
Establish a nu
raisin
tree seedlings 
communiti
plan
fores
the rehabilita

 
 
e

 
 
 

e
art 
on o
 Ward
 
ent
 
tion & 
ea.
 
m
m
 
we
reste
ct Nam
ain
m
e S
ood
vem
u
ilitati
ra
h
resta
-fo
stainable 
stainable 
itiative
n
Proje
Lamar
Su
Farming
Woven Villag
Prog
Climat
Su
Liveli
Impro
In
Mt Gil
Refo
Rehab
No
Logged Ar
 
 
ga 
ent

ent 
 
er
 

eids 
m
m
m
p
p
o
-Man
o
gar 
vel
o
vel
ency Inc
Custo
Henry R
Bay 
De
Ilil Lunkry
Kgwan Ec
Habitat In
Lin
Imbou
De
Ag
 
 
 
 
est 
-
56
-
57
-
14
-
84
21
52
21
41
21
52
21
45
Requ
ID 
20
15
20
15
20
15
20
15

of 
ts 
ts 
ts 
ct 
ta 

ct, 
ct, 
ct, 
er 
es 
oje
ojec
the 
ojec
the 
ojec
the 
r da
oje
oje
oje
o
riti
oth
o
the 
the 
the 
to declin
er pr
of 
er pr
of 
er pr
of 
 your 
th
 with 
 your 
th
 with 
 your 
th
 with 
your pr
ones f
 that 
your pr
 o
ties 
your pr
 o
ties 
your pr
 o
ties 
of 
osen 
of 
cess
of 
cess
of 
cess
ered
to the pri
erit 
of dr
erit 
 priori
y suc
erit 
 priori
y suc
erit 
 priori
y suc
nsid
er
er
er
e m
e m
ered that
e m
ered that
e m
ered that
h
e use 
co
nment 
h
en to decline
 the
ev
h
en to decline
 the
ev
en to decline
 the
ev
 t
casion ch

o
o
o
 th
 t
os
nsid
 t
os
nsid
 th
os
nsid
o
 oc
o
o
o
 see
 you 
 you 
 you 
er alig
 see
 c
ent t
 see
 c
ent t
 see
 c
ent t
 
The Trus
sion ch
sion ch
sion ch
 could
on this
egards t
trong
 could
 Trust
wishes
 could
 Trust
alignm
wishes
 could
 Trust
wishes
rding
 r
o
tion. 
occa
occa
occa
 W
 Trust
 
 Trust
nger alignm
 Trust
nger 
 Trust
nger alignm
g, it has 
lica
o
o
 
o
ion
ts had a s
on this 
t. 
on this 
on this 
t. 
ject.
Decis
While the
particularly in
gatherin
your app
projec
the fund. 
While the
it has 
application. The
had a str
fund. The Trust 
projec
While the
it has 
application. The
had a str
fund. The Trust 
pro
While the
it has 
application. The
had a str
fund. The Trust 
projec
 
 
 
 
 
ed
$0
$0
$0
$0
ount 
m
A

Recommend
 

 
 
 
 
892
000
000
000
ested
 
ount 
$13,
$40,
$50,
$50,
m
A

Requ
 
al 
 
we 
n
 
es 
o
 
ts 
sly 
 
 
es 
ts
on 
of 
u
o
 
 
jec
 spati
uniti

o


t Gilu
est 
es t
ts, and
m
u

o
enable
 
 
o
orest
 o
ation 
y
revio
-f
e W
opulati
m
p
ta
ment
e turtl
o
a web 
ovid
m
ivisi
ar
p
Turtles,
d
 of 
tches 
 non
thin M
f dron
habi
datable
k th
o
sub
al c
 pr
on th
ck 
their habita
o
on

 to be dug
ean 
 trac
 loc
ent of 
cal sub
 
r their 
 to
ct Summ
yed pa
p an up
pm
estati
o
scapes wi
the us
to
m
 with
al cleaning up pr
 in Fiji
d
eatherba
elo
rk
 Vanuatu to carry
ast
vel
gregated infor
d
Proje
refor
destro
degraded and
lan
Test 
gather data 
Pacific oc
of L
moni
dev
database manage
syste
and analyse   
Wo
in
co
De
application t
ag
the politi
lan
Purchase of tools to 
the airstrip
st 

 
ons 
 o
e

 
n
and 

ys 

ve and 
plicati
vin
ck 
 
 
iggin
chel
ives 
 

 D
 
ct Nam
pulatio
o
t, Sa
lture 
e Ap
nser
o
ea)
u
rc
angered We
m
y Health
u
ect
riac
tec
arine L
Proje
Dron
for C
Critically
End
Pacific Ocean
Subpo
Leatherba
Turtles 
(Der
co
Pro
Enjo
M
Benefits
Yasa! A Fijian land 
and c
reso
Airstrip
Proj
 

 
 
 
ent 

ent
er
m
spir
rewa
 
m
m

p
 
p
b
o
ko
unit
o
o
ed
 
m
vel
ji Asi
vel
Custo
Mor
De
Foundation Inc
Pacific In
Limit
Peni
Kama
Pin
Com
De
 
 
 
 
est 
-
41
-
27
-
04
-
74
21
52
21
52
21
52
21
53
Requ
ID 
20
15
20
15
20
15
20
15

 
ts 
-
 
ts 
ts 
en 

 
ct, 
 re
 
ct, 
ct, 
os
o
m
 o
The 
oje
ojec
the 
anne

 
oje
ojec
the 
oje
ojec
the 
e Trust's
ect.
the 
u t
o
the 
ur 
ect. 
er pr
of 
yo
 with 
vance
er pr
er pr
of 
u were able 
ng ter
es n
 with 
 with 
t has ch
 your 
th
o
o
 your 
th
 yo
th
e proj
ntact Jo
 ad
with th
your pr
 o
ties 
 like 
 yo
e l
 February 
o
vailable.
your pr
 o
ties of the 
your pr
 o
ties 
of 
cess
th
of 
cess
of 
cess
ns 
uld
0
e c
o
1
-apply d
decline
s your proj
with th
erit 
 priori
y suc
w
erit 
y suc
erit 
y suc
leas
vt.nz) in
e
made a
 priori
e priori
ered that
er
ens 
o
 r
ered that
h
er
ered that
er
est alig
ia. The Trus
ard
e m
ided that
p
e m
e m
h
en to decline
 the
ev
n about th
to
 be 
h
en to decline
 t
ev
h
en to 
 the
ev
w
cess 
o
tees 
ia.g
o
o
 t
os
nsid

 t
os
nsid
 t
os
nsid
 suc
o
atio
arch. P
o
o
o
 see
 c
ent t
 you 
Trus
m
und o
 you 
 you 
o
g will
ent t
er@d
tati
 see
 c
 see
 c
 
g criter
on t
in
the 
und prov
for
th M
vi
 your requ
d
every
sion ch
o
4
sion ch
sion ch
 could
 Trust
wishes
2
e in
 could
 Trust
wishes
 could
 Trust
wishes
rding
ver, 
ext r
e next r
t fundin
o
 fun
ntributi
you 
occa
ses 
occa
occa
we
h
mor
lo
 W
co
e n
ted that
es 
 and
 Trust
nger alignm
h

anne.Beck
 Trust
nger alignment to
 Trust
nger alignm
o
o
es. T
o
o
ion
e a 
on this 
t. Ho
tee tha
t. 
t. 
ovid
m
 and c
r (Jo
on this 
on this 
0
 mak
ojec
 pr
tco
2
-applying. This in
Decis
u
0
It was n
priorities
to
Trust wish
While the
it has 
application. The
had a str
fund. The Trust 
pr
apply in t
to
o
2
Becke
re
guaran
While the
it has 
application. The
had a str
fund. The Trust 
projec   While the
it has 
application. The
had a str
fund. The Trust 
projec
 
 
 
 
 
ed
$0
$0
$0
000
$30,
ount 
m
A

Recommend
 

 
 
 
 
680
000
920
000
ested
 
ount 
$49,
$47,
$49,
$45,
m
A

Requ
 
 
 

 
d
e
e.
h
us 
 
als 
 of 
of 
m
 
 


erly 
 

 
te
le;
sts
p

ed 
o

to 
g o
 Islan
, ritu

ng t
ces,
ducing 
igeno
o
unities
in
 


gi
osin
e c
g, 
m
m
ea 
y
ga
ces
 re
 prop
 ind
 
ological
bedd
 Ducks
m
ar
arin
of th
ce b
n
tand
of 

mmunit
 disp
ec
e practi
etting up th
o
com
 m
of Gizo
em

d
vin
d e
ce 
o
n
unity;
e; and
g existing wast
Bitakapuk
wledge sys

o
tiv
 s
e Wild
w Guin
en
an
y with 
e is 
ngs, dan
mances
 a c
s progra
astal 
m
o
mm
g h
 and
r th
ct Summ
e isl
enting the
g towards th
o
ern Pr
o
ting and
unit
edg
 crea
 co
portan
ance the
 th
ating a
recyclin
m
e Gunantuna pe
 as s
m
d
uc
local kno
apua Ne
cal c
llec
pport the 
ndin
 P
crease unders
Proje
Enh
environ
an
West
ed
lo
plastic usag
co
and 
Su
com
docum
eco
of th
explorin
knowl
within
such
and perfor
Fu
making, transportin
locating
nests f
Undertake
awarenes
across
in
in
the i

 
tal 
 
 
 
m
m


 
as
n
men 
ew 
e
o
tec
 c
 for
onal 
yste
yste
tu
 
 
o
ves 
cure 
o
on and
ons 
apua 
e s
e s
an
 
mon 
n
f P
 
tion

digenous
ck
apua N
ct Nam
vati
 
o
edg
 Buai 
edg
u
rting w
 P
agement
ersati
e Gu
le o
 Guinea
 D
erva
ea to pro
 inclusive and 
p
nser
logical 
tergenerati
nv
Proje
An
sustainable 
approach t
co
waste
man
the Sol
Islands.
Curatin
in
co
about in
eco
knowl
of the
knowl
of th
peo
New
Wild
Pres
Suppo
across
Guin
their mangro
and build se
 
 
 
 
n
 
er
gy
 
y of 
m
 
lo
vancy
ve
e Life 
o
ti
n
ed
 
Custo
Posi
Change for 
Mari
Limit
Queensland 
Universit
Techn
Siuai Cultural 
Heritage 
Foundatio
The Nature
Conser
Trust
 
 
 
 
est 
-
54
-
98
-
06
-
20
21
52
21
51
21
39
21
49
Requ
ID 
20
15
20
15
20
15
20
15

 
ts 
ts 
en 
 
ct, 
ct, 
os
The 
oje
ojec
the 
oje
ojec
the 
e Trust's
ect.
the 
ect. 
er pr
 with 
er pr
of 
 with 
t has ch
 your 
th
 your 
th
e proj
with th
your pr
 o
ties of the 
your pr
 o
ties 
of 
cess
of 
cess
ns 
s your proj
with th
erit 
y suc
erit 
y suc
e priori
e priori
ered that
h
er
ered that
h
er
est alig
ia. The Trus
ard
e m
e m
h
en to decline
 t
ev
h
en to decline
 t
ev
w
cess 
o
 t
os
nsid
 t
os
nsid
 suc
o
o
 see
 c
 you 
 see
 c
 you 
 
g criter
on t
in
 your requ
d
every
sion ch
sion ch
 could
 Trust
wishes
 could
 Trust
wishes
rding
o

 fun
ntributi
you 
occa
occa
 W
co
ted that
es 
 and
 Trust
nger alignment to
 Trust
nger alignment to
o
o
 
o
 
ion
e a 
on this 
on this 
ject.
ject.
 mak
Decis
It was n
priorities
to
Trust wish
While the
it has 
application. The
had a str
fund. The Trust 
pro
While the
it has 
application. The
had a str
fund. The Trust 
pro
 
 
 
 
 
ed
$0
$0
876
802
$34,
$93,
ount 
m
A

Recommend
 

 
 
 
 
4
 
776
,20
000
800
ested
ount 
$39,
$50,
$13,
m
$834
A
Requ

 

 
 

d

te 
ly
 

 
 
us
el
 
 to
NEW ZEALAND
o
ent of 
te 
 livin
ve
e a ne
mad
-base
enera
 
Ruru
 
lture 
men, 
ility Stu
at
es
ed at
ic
y
o
 
ose
sib
 reg
om
 tall 
ar
to crea
 w
 th
valu
vic
o
 aim
n
 to be 
anagem
ose
o
 t
multane
agricu
 for
co
 
e t
 a Fea
on si
 metre
order 
ncept
ent and natural
 Zealand nati
ves
ment
e and e
ems ser
o
 
ct Summ
p the 
erty 
ping e
pm
 Sculpture
gro
o
vantaged women,
yst
or in 
loy
g incom
eat
el c
arian zone,
three
 New
vel
-s
elo
elo
 pov
 cr
Proje
sustainable m
man
De
sect
emp
particularly th
disad
brin
in
Undertake
to
eco
mod
a rip
dev
dev
regenerati
Purchase of structural ste
for a 
Living
from
grasses

 

o
 
 
o

e

 
ect
r their
es
or 
roj
o
 a 
ct Nam
uniti
pment f
ility Stud
m
elo
 
arian Fores
eruru P
Proje
futures f
com
Rural sect
dev
creating
sustainable Fiji f
all
Rip
Feasib
Hin
 
 
 
 
 
 
ted
er
ent
ers
m
m
ork 
rpora
co
Custo
Zonah United
Environ
Netw
Manawatu
In
Kylie Rog
 
 
 
est 
-
32
-
65
-
60
21
52
21
52
21
48
Requ
ID 
20
15
20
15
20
15

 
 
ts 
ts 
ts 
ct, 
en 
 
en 
ct, 
ct, 
oje
ojec
the 
os
os
of 

oje
ojec
the 
oje
ojec
the 
the 
The 
e Trust's
ect.
e Trust's
ts 
s: 
the 
the 
er pr
of 
ver
ect. 
er pr
of 
er pr
of 
 your 
em
th
 with 
 your 
th
 with 
 your 
th
 with 
your pr
 o
 it
ties 
t has ch
e proj
t has ch
with th
with th
 aspec
your pr
 o
ties 
your pr
 o
ties 
of 
cess
 you e
of 
cess
of 
cess
ns 
ns 
owing
rapping lines; and 
erit 
 priori
y suc
 t
with th
erit 
 priori
y suc
erit 
 priori
y suc
er
s your proj
s some
er
er
e m
ered that
e foll
ting;
e m
ered that
e m
ered that
h
en to decline
 the
ev
est alig
ia. The Trus
ard
est alig
ia. The Trus
ard
h
n
h
en to decline
 the
ev
h
en to decline
 the
ev
 t
o
cess 
ust wishes
o
o
os
nsid
w
w
 
 t
os
nsid
 t
os
nsid
o
o
o
Tr
 suc
 t
t.
o
o
 see
 c
ent t
 you 
 see
 c
ent t
 you 
 see
 c
ent t
 you 
 
g criter
on t
g criter
on
ticular t
The 
ojec
sion ch
in
in
 your requ
d
every
 your requ
d
pr
sion ch
sion ch
 could
 Trust
wishes
 par
 could
 Trust
wishes
 could
 Trust
wishes
rding
ation. 
o
occa
 fun
ntributi
you 
 fun
ntributi
occa
occa
 plants, and pla
 W
 Trust
nger alignm
co
es 
ct, in
nger alignm
nger alignm
o
ted that
 and
ted that
 and
 Trust
 Trust
 
o
o
a co
orest
o
 
o
 
ion
oje
on this 
e a 

on this 
on this 
ject.
ject.

ject.
 mak
 mak
Decis
While the
it has 
application. The
had a str
fund. The Trust 
pro
It was n
priorities
to
Trust wish
It was n
priorities
to
your pr
purchase of
kauri ref
success with the 
While the
it has 
application. The
had a str
fund. The Trust 
pro
While the
it ha
application. The
had a str
fund. The Trust 
pro
 
 
 
 
 
 
ed
$0
00
00
$0
$0
$5,0
$5,0
ount 
m
A

Recommend
 

 
 
 
 
 
230
000
000
000
125
ested
ount 
$24,
$15,
$15,
$30,
$20,
m
A

Requ

at 



 

n
 

ed 
 
gs
u
 

o
r's 
the 
g o
ting, 
 
The 
 
 
med 
 
Maor
e, an
the 
al 
whic
-guided 
earnin
thods
to
cts 
rkin
ic
ss 
y, 
 deplet
 back,
 the 
ificant
 
t ai
isi
o
y and
huri to 
on it. 
y
nal 
me
oje
g, kauri 
 Whana
self
o
 

felled l
 v
 w
olog
ro

ds near
ar
ojec
s-on l
vitalise
 cultur

wards 
rin
o
 a 
rt, which
e culturall
y sign
d
re
in
 o
o
o
e Te
re the
e the
 t
Trail at
ous pr
; ec
warene
e R
to
ent
 a pr
 
nit
etlan
o
on
y a
Maitai Ba
i placed 
m
ent of 
f thre
g han
 area
ari

u
 W
 Airpo
 in traditi
kills and
ea
currently
g riparian replan
on, nurser
 
tany 
 me T
o
n
 o
ct Summ
in
mplet
f v
ts
to res
ple
pm
o
shops to 
 o
estati
rati
 alongsid
re it
o
pik
ilt
rk
o
rk
o
o
terest
sts
cludin
vel
nsists
Proje
Undertake
provid
wo
in
crafts, s
traditional fish
Clear the
and co
arrival ar
Contribution
co
Trust is 
in
trapline m
refor
rest
communit
projec
Wo
Moana
rest
had a rah
aim is 
areas, bring balance
and im
sustainability plan
De
Ethnobo
Rot
Ham
co
and scientificall
sts 
 
 
 
 
e

ts
in
Rahui 
 
en

ay 
on 
m
 
o
ct Nam
 Fish
ve 
vem
m
pik
botany Trail
ET Annual Co
orati
ra
o
B
hno
Proje
Maori
Wananga
Reser
impro
M
Maitai B
Matauranga and
Rest
Prog
Rot
Et
 

al 
 

 
on 

s to
on 
er
mau

ent
 
m
an
vati
y Ba
m
vati
d
aku Poin
tain
ofi Sa
 
 
 
ri-L
n
ew 
Custo
Leal
Pou
Mam
Conser
Trust
Mercur
Environ
Trust
Mou
Sea 
Conser
Trust
National 
Wetland Trus
of N
Zealan
 
 
 
 
 
est 
-
40
-
74
-
13
-
10
-
28
21
51
21
46
21
43
21
51
21
46
Requ
ID 
20
15
20
15
20
15
20
15
20
15

 
 
ts 
ts 
ct, 
en 
 
en 
 
ct, 
oje
ojec
the 
os
os
oje
ojec
the 
the 
The 
The 
e Trust's
ect.
e Trust's
ect.
the 
er pr
of 
ur 
ect. 
 th
ect. 
o
er pr
of 
 your 
th
 with 
h
 y
th
 with 
your pr
 o
ties 
t has ch
e proj
t has ch
e proj
with th
wit
your pr
 o
ties 
of 
cess
of 
cess
ns 
ns 
erit 
 priori
y suc
with th
with th
erit 
 priori
y suc
er
s your proj
s your proj
er
e m
ered that
e m
ered that
h
en to decline
 the
ev
est alig
ia. The Trus
ard
est alig
ia. The Trus
ard
h
en to decline
 the
ev
 t
o
cess 
cess 
o
os
nsid
w
w
 t
os
nsid
o
o
o
 suc
 suc
o
 see
 c
ent t
 you 
 see
 c
ent t
 you 
 
g criter
on t
g criter
on t
sion ch
in
in
 your requ
d
every
 your requ
d
every
sion ch
 could
 Trust
wishes
 could
 Trust
wishes
rding
o

occa
 fun
ntributi
you 
 fun
ntributi
you 
occa
 W
 Trust
co
co
this 
nger alignm
es 
es 
nger alignm
o
ted that
 and
ted that
 and
 Trust
o
o
o
ion
on 
t. 
e a 
e a 
on this 
t. 
 mak
 mak
Decis
While the
it has 
application. The
had a str
fund. The Trust 
projec
It was n
priorities
to
Trust wish
It was n
priorities
to
Trust wish
While the
it has 
application. The
had a str
fund. The Trust 
projec
 
 
 
 
 
ed
$0
00
00
$0
$4,2
$8,5
ount 
m
A

Recommend
 

 
 
 
 
000
00
998
000
ested
$7,4
 
ount 
$50,
$23,
$50,
m
A

Requ
 
tal 

 
 
 
m
ted
g of 
n
 
en
 

o
m
the 

cia
 
 o
 by 
m
e  t
 
 
 a
 the 
e and 
m
 
o

eedin
t will 
al iwi
ce 
 th
ager to
ogra
y
m
ture 
te
out 
n
oss
 
br
m
th their
viron
mm
mmunit
 and
pr
ar
ma
 into
era
cation
o
shing 
edu

eir ass
f loc
Man
 swa
 r
 a 
p
es tha
rol 
rest.
 o
 
o
ease
ntinue 
ogra
 o
 pest
y.
ers ab
shing o
est 
nt
n Ba
 fo
o
y edu
uth wi
g an en
 an c
ourc
s progra
o
es, th
 and
o
 safe fi
es, t
 P
d
s, and
r rel
ories
u
of fi
ate a
r co
ct Summ
pin
in
o
y a
 and co
ga - Mt Pirongia,
n
o
iq
al res
lo
ntinue t
age y
el
cation pr
cate fish
atross
tipodean Albatr
 Halfmo
Proje
peat lak
peatlan
marg
kahikatea
Co
hatchery for the 
Paua f
wild;
communit
Paua fisher
Eng
mau
dev
edu
visu
share st
Undertake
awarenes
edu
alb
techn
impact 
An
Emp
coordin
predato
in
 
 


 
o
e
y and
ojec
al 

ration
ves f
to
ent
 
 
 Ba
m
n
o
 
ct Nam
ecover
ia 
o
a R
cation Pr
cation
ect
tipodean 
Proje
Pau
Edu
Iwi Narrati
Pirong
Environ
Edu
Save the 
An
Albatross
Halfm
Habitat Res
Proj
 
 
ra 
 
 
 
 

er
RATE
on 
ent
O
s Trust
 
m
 o Kahu 
 
n
m
 
ia Te 
y Inc
unit
3
orati
m
 
DUSTRY
SOCIATION
CORP
 
Custo
PAU
IN
AS
IN
D
Pirong
Aroaro
Rest
Societ
Southern 
Seabird
Solutio
Stewart
Island/ Rakiu
Com
and 
Environ
Trust
 
 
 
 
est 
-
30
-
01
-
26
-
02
21
40
21
52
21
43
21
48
Requ
ID 
20
15
20
15
20
15
20
15

ts 
ts 

ts 
ct, 
ct, 
es 
ct, 
oje
ojec
the 
oje
ojec
the 
t has 
oje
ojec
the 
the 
the 
with th
 wish
the 
er pr
of 
er pr
of 
er pr
of 
 your 
th
 with 
 your 
th
 with 
e Trus
 your 
th
 with 
your pr
 o
ties 
your pr
 o
ties 
well 
your pr
 o
ties 
of 
cess
of 
cess
 Th
e Trust
of 
cess
ned 
 
t.
erit 
 priori
y suc
erit 
 priori
y suc
erit 
 priori
y suc
er
er
est. Th
er
e m
ered that
e m
ered that
e m
ered that
h
en to decline
 the
ev
h
en to decline
 the
ev
est alig
g criteria.
h
en to decline
 the
ev
 t
o
o
equ
o
os
nsid
 t
os
nsid
in
 t
os
nsid
o
o
d
the projec
o
 see
 c
ent t
 you 
 see
 c
ent t
 you 
ent t
 you 
 fun
th 
 see
 c
 
sion ch
sion ch
 your requ
s wi
sion ch
 could
 Trust
wishes
 could
 Trust
wishes
 and
 could
 Trust
wishes
rding
o

occa
occa
occa
rities
 W
 Trust
nger alignm
nger alignm
o
nger alignm
o
 Trust
o
ted that
 Trust
o
to fully fund your r
o
 
ion
on this 
t. 
on this 
t. 
on this 
ject.
Decis
While the
it has 
application. The
had a str
fund. The Trust 
projec
While the
it has 
application. The
had a str
fund. The Trust 
projec
It was n
Trust’s pri
chosen 
you every succes
While the
it has 
application. The
had a str
fund. The Trust 
pro
 
 
 
 
 
 
ed
$0
$0
$0
700
00
$22,
$6,2
ount 
m
A

Recommend
 

 
 
 
 
 
3
0
000
00
,55
,00
406
ested
$6,2
 
ount 
$80,
$45,
m
$379
$225
A
Requ
NESIA 
Y

 
e,



m
 
POL
 

ay 
en
ts, 

med 
m
ra
o
ary
m
 
 ne
ety 
mber 
 par
ect 
m
rap
ed aw
med a
roj

 kits, 
ito
ver 
 
ogra
iwi and 
o
 
mmunit
o
learn 
kits, 
o
 a nu
y
nga to
a, as
pr
e pri
vai Villag
cat
y equip
o
e ai
aid
 c
o
ar
t and 
o
b
m
ce f
 To
and 
n fees, ai
m
rol 
o
e Tap
va C
in
st 
 mosqu
duce K
villag
 Gata
 rel
d path
o
uth and 
fir
; and
cti
within
 Sa
 a pes
nt
 th
 La
o
ygiene 
g health, saf
n
 
of rug
es 
ed Hands P
r co
ogram
 o
 flo
g a spa
gether 
ic h
nne
o
vin
o
es in
ct Summ
-intro
in
ird
 will be
 Gift
ol in the
 the
e Teu
er c
orts pr
villag
Proje
Undertake
predato
and re
Bellb
Peninsula
Rebuild the 
scho
which
from
Purchase 
for th
Sp
provid
struggling y
communiti
come to
rugby 
Purchase of 
pandem
defibrillators,
bench filters
wat
at impr
and hygiene 
of 
of the
rt 
 

 
e
ar
ild
 ai Nga 
 
m
u
ra
ri
y Spo
wai
o
 P
 
ct Nam
va 
unit
ga o 
n
ool Reb
 La
m
ect
Proje
Kia Pua
Tao
Taporap
Gatavai
Sch
Teu
Com
Gifted Hands 
Proj
 
 
 
 
er

mau

 and
liaki
o
m
 
an
 Care 
 
 
ects
ofi Sa
ri-L
Custo
Tapora Land 
Coast
Group
Gatavai
Proj
Fundraising 
Group
Kakau F
Leal
Pou
 
 
 
 
est 
-
72
-
08
-
49
-
98
21
49
21
52
21
49
21
50
Requ
ID 
20
15
20
15
20
15
20
15

ts 
ts 
ts 
ts 
ts 
ct, 
ct, 
ct, 
ct, 
ct, 
oje
ojec
the 
oje
ojec
the 
oje
ojec
the 
oje
ojec
the 
oje
ojec
the 
the 
pr
the 
the 
pr
the 
the 
er pr
of 
er pr
of 
er pr
of 
er pr
of 
er pr
of 
 your 
th
 with 
 your 
th
 with 
 your 
th
 with 
 your 
th
 with 
 your 
th
s with 
your pr
 o
ties 
your 
 o
ties 
your pr
 o
ties 
your 
 o
ties 
your pr
 o
ties 
of 
cess
of 
cess
of 
cess
of 
cess
of 
ces
erit 
 priori
y suc
erit 
 priori
y suc
erit 
 priori
y suc
erit 
 priori
y suc
erit 
 priori
y suc
er
er
er
er
er
e m
ered that
e m
ered that
e m
ered that
e m
ered that
e m
ered that
h
en to decline
 the
ev
h
en to decline
 the
ev
h
en to decline
 the
ev
h
en to decline
 the
ev
h
en to decline
 the
ev
 t
o
o
o
o
o
os
nsid
 t
os
nsid
 t
os
nsid
 t
os
nsid
 t
os
nsid
o
o
o
o
o
 see
 c
ent t
 you 
 see
 c
ent t
 you 
 see
 c
ent t
 you 
 see
 c
ent t
 you 
 see
 c
ent t
 you 
 
sion ch
sion ch
sion ch
sion ch
sion ch
 could
 Trust
wishes
 could
 Trust
wishes
 could
 Trust
wishes
 could
 Trust
wishes
 could
 Trust
wishes
rding
o

occa
occa
occa
occa
occa
 W
 Trust
nger alignm
nger alignm
nger alignm
nger alignm
onger alignm
 Trust
o
 Trust
 Trust
 Trust
 
o
o
 
o
 
ion
on this 
t. 
on this 
on this 
t. 
on this 
on this 
ject.
ject.
ject.
Decis
While the
it has 
application. The
had a str
fund. The Trust 
projec
While the
it has 
application. The
had a str
fund. The Trust 
pro
While the
it has 
application. The
had a str
fund. The Trust 
projec
While the
it has 
application. The
had a str
fund. The Trust 
pro
While the
it has 
application. The
had a str
fund. The Trust 
pro
 
 
 
 
 
 
ed
$0
$0
$0
$0
$0
ount 
m
A

Recommend
 

 
 
 
 
 
000
000
555
640
000
ested
 
ount 
$15,
$50,
$22,
$34,
$50,
m
A

Requ
 
 
 


o
of

 
ke 
 
isi
ur 
eela
 
 the
 
o
ov
 
o
pute
 and
 
est 
e ship 
te
 
th 

 
ans' 
ent 
trol
eness 
y
 
of 
lau
d
 for
at 
 underta
 Fatu Hiv
ement a
e pr
 
h
ar

duca
 the H
ur
 com
 earl
 Oce
 Faleas
 con
pl
cation
ols
further 
ke
ts wi
 
f ro
rk 
 reduc
awar
 e
r t
ugh to
o
 to
Tokelau
 o
 and
o
o
om
o
 run
e ho
n
n
s, and
edu
 Vanuatu t
hr
n
o
a serie
e To
h
o
 pest
e t
e to
e fo
ei and
y on the

 'AI for
 
on w
m
 
d t
y sch
lel
unity 
o
ct Summ
 and
a o
p t
p and im
ducti
shop in 
shops to 
o
m
agement
rati
ilities fr
o
arch
ort studen
de (
rk
rk
elo
ntinuati
gramm
gramm
p
evelo
Proje
Create
Co
intro
science)
wo
Samoan
Carry out 
wo
dev
Language app
Co
man
rest
Malol
Undertake
program
rat number
a com
pro
communit
Mon
D
pro
of inclusiv
practices in
sup
disab
childho
secondar
 

ur 
 
 
 
 
 
va 
 
 
o
ces
 
 
 
ries
tion 
 th
e
Hi
o
ur
 and
 app
 
a’s
 
 its 
ca
 and
ople
o
ement 
m
es in
eso
anguage 
 building 
r all
tes
Fatu 
 and
ceans H
 
Skills

ic Birds by
ct Nam
elau and

anag
t Si
r O
de r
an
on and

o
em
 M
o
arch
eachers
 fo
 Tok
kelau L
 langage game
kelau pe
clusive Edu
mmuniti
Proje
f C
AI
o
in
Samo
To
Game
capability
in
creati
design fo
To
Saving Sam
End
Pest
at Pil
Save the 
Mon
heritage me
In
for T
Co
Pacifi
 
 

 
on 
gie

sie
er
lo
ersit
m
vati

é 
lyné
 

usson 
 
 
usson 
 
wcastl
Ne
Custo
Pam
Ferg
Charitable 
Trust
Pam
Ferg
Charitable 
Trust
Samo
Conser
Societ
Sociét
d'Ornitho
de Po
The Univ
of 
 
 
 
 
 
est 
-
75
-
76
-
56
-
39
-
05
21
52
21
52
21
53
21
52
21
37
Requ
ID 
20
15
20
15
20
15
20
15
20
15

ts 
ct, 
oje
ojec
the 
the 
er pr
of 
 your 
th
 with 
your pr
 o
ties 
of 
cess
erit 
 priori
y suc
er
e m
ered that
h
en to decline
 the
ev
 t
o
os
nsid
o
 see
 c
ent t
 you 
 
sion ch
 could
 Trust
wishes
rding
o

occa
 W
 Trust
nger alignm
o
 
ion
on this 
ject.
Decis
While the
it has 
application. The
had a str
fund. The Trust 
pro
 
 

ed
$0
0
2
$6,

ount 
m
A

Recommend
 

 
 
383
84
,1

ested
70
 
ount 
$21,
m
$4
A
Requ
 

o
 
 f
ric
ork
to
et up a
 the 
 
ew
y
r the 
es in
ar
 fo
 fram
ory
 
f Cultural 
ent, and s
ric sit
 o
ct Summ
p a digital his
vent
pm
 in
o
 histo
istry
agement
k Islands
evelo
vel
Proje
D
sites
Min
De
man
those
Coo

 

e
ojec
ct Nam
ory Pr
k Island Sit
vent
Proje
Coo
In
 
er

y of 
m
 
Custo
Universit
Otago
 
est 
-
74
21
41
Requ
ID 
20
15


Minutes of Meeting of the Advisory Trustees of the 
PACIFIC DEVELOPMENT AND CONSERVATION TRUST 
Held at 45 Pipitea Street, Wellington  
on Thursday 6 May 2021 commencing at 10.00am 
 
 
Date and time of meeting  10.00am, 6 May 2021 
Location 
45 Pipitea Street, Wellington 
Attendees 
Sai Lealea, Jannitta Pilisi, Ruth Sio-Lokam, Kim Wright, 
Barbara Hayden, Patrick Holmes, Brenda Wraight 
 
Joanne Becker (Community Advisor) and Connor 
Taumoepeau (Funding Administrator) 
Apologies 
Joe Grace (Manager National Funds) 
Chair 
Sai Lealea 
 
1.  

Welcome and apologies 
1.1  Ruth welcomed the group and opened the meeting with a Karakia.  
 
House Keeping 
Joanne advised the Advisory Trustees of the emergency procedures, where the 
bathrooms are located and a reminder to scan the COVID QR codes. 
 
2. 
Approval of minutes 
2.1  The minutes of the Pacific Development and Conservation Trust meeting held on 
6 November 2020 were confirmed as a true and accurate record. 
Moved: Brenda Wraight    Seconded: 
Kim Wright 
 
3. 
Matters Arising 
3.1  GCMS 
The Trustees advised they had no issues with GCMS this time around.  
3.2  Ngwaelalida Community Group  
Joanne advised she has continued to try making contact however has heard of no 
response. There is an option to go through the process of recovering the money back. 
This is a last resort though.  Joanne has however tried contacting the water tanker 
suppliers and hopefully will have a reply soon.   

3.3  Fund Amount 
The Advisory Trustees commented on the possibility of extending the $250,000 fund 
allocation as there are large number of requests. The Trustees noted the hardship 
through COVID-19 and environmental changes as reasons to increasing the fund 
amount.  
 
Action: DIA Staff to contact Finance in extending the fund and to provide update at 
the next meeting. 
  
4. 
Accountability reports received 
The Trustees acknowledged the reports received and that there were four overdue 
reports and discussed the following: 
4.1  9(2)(b)(ii)
 
Joanne and the Advisory Trustees commented they are aware of the overdue report 
and are actively following up on this. 
4.2  9(2)(b)(ii)
 
The Advisory Trustees commented on the fact the recent extension for this 
organization was meant to be the last one.  The Secretariat is not concerned and is in 
regular contact with the group, and states a report is likely to be submitted soon. 
4.3  Criteria in extension requests 
The Advisory Trustees commented on the providing criteria for extension requests 
and would find this useful.  Joanne explained that these are considered on a case by 
case basis but that DIA can check whether other trusts have fixed criteria in place. 
 
ACTION: 
DIA Staff to check with other Trust funds for criteria used in extension 
requests.  
 
5. 
Funds available for distribution 
5.1  The Advisory Trustees noted that the Trust has a total of $122,371 available for 
allocation. 
 
6. 
Declarations of conflicts of interest 
6.1  The Trustees identified there were no conflicts of interest. 
 
7. 
2020/21 PDCT third funding round requests 
7.1  The Advisory Trustees considered 37 applications for funding. Of the 37 
applications, 12 applications were recommended for funding totalling $122,364 and 
25 applications were recommended for decline. The Advisory Trustees’ 
recommendations and comments are set out in the Recommendation Schedule, 
attached as an Appendix to these minutes. 

8. 
Date of next meeting 
8.1  The Trustees commented that a date of the next meeting will be discussed in 
due course as some Trustees terms are coming to an end soon.  
 
The Meeting concluded with a Karakia at 1PM. 
 
Summary of action points 
Item   Action 
Date raised  Owner 
Due date 
1.   
Fund amount check with 
6/05/2021 
Joanne 
 
Finance to increase. 
2.   
Criteria for extension requests.  
6/05/2021 
Joanne 
 
 
 
 
 
 
 
 
 

APPENDIX 1  
 


es 
 
ered 
ent 

your 
o
m
you 
nsid
with th
on 
of 
t wish
 Th
es 
sen t
co
 
t.
ns 
erit 
 
e m
h
ion cho
e Trust 
ronger align
. The Trus
est alig
g criteria.
 contributi
ect.
 t
h
 st
in
 a
 Trust wish
oj
the projec
d
 see
occas
on. T
th 
 make
t. The
o
the pr

 this 
licati
ts had a
f the fund
s wi
 your requ
in
 could
n
 o
ojec
en t
rd
s o
ojec
ties and fun
 with 
os
ur app
rities
 Wo
 Trust
o
o
ted that
cess
n
o
s your pr
sio
ject, it ha
t's priori
ard
y suc
 the pri
w
er
Deci
While the
pro
decline y
that other pr
to
you every succes
 
It was n
Trus
Trust has ch
to
ev
 
 
 

$0
$0
0
ended
0,0
$2
mm
ount 
o
Am
Rec
 
 
 
4
5
7
8
6
68
9,6
9,
9,9
ted 
 
$4
$4
$4
ount 
eques
Am
R
TRALIA
 
 
 

5
5
0
8
0
AUS
68
9,6
9,
MELANESIA 
0,0
rojec
$4
$4
$8
 
st

Total P
Co
 
 
to
 
le 
 and
gical 
ib
 
tpot
ea 
 
lo


co
-
o
 
g the 
f the San
 Ho
lti
untr
u

on f
on ar
o
us e
 o
t Name
g: Intang
 C
unit
vati
n
ersity
agement
powerin
ugh m
m
anced 
nser
Projec
Listening Sharing 
Healin
Cultural Heritage
Art o
Em
indigeno
stewards
Mountain Chain
Biodiv
thro
com
cooperati
enh
co
man

ersit
 
/21 
 
0
gy
 
lo
er
o
 202
n
m
ech
REE
sto
an Taman
H
Cu
Queensland Univ
of T
All
 
 
 
-
23
-
76
 ROUND T
21
71
21
71
Request ID
20
16
 
 
20
16
 
 
PDCT
 


 

 
iso
 
es 
es 
es 
ered 
ered 
ered 

ver 
ect 
arily
t.
 
ent 
 
ent 
 
ent 
 Trust
o
m
o
m
your 
o
m
with th
 Adv
your 
your 
 Th
on 
we
rdin
nsid
nsid
nsid
o
CT
ojec
of 
t wish
of 
t wish
of 
t wish
ns 
 proj
s ho
pr
sen t
co
 
co
 
co
 
t.
sen t
t.
sen t
t.
 the
 PD
e. The
erit 
erit 
erit 
n
extra
the 
m
est alig
g criteria.
 contributi
n o
ed 
ith 
e m
ion cho
e Trust 
ronger align
. The Trus
e m
ion cho
e Trust 
ronger align
. The Trus

ion cho
e Trust 
ronger align
. The Trus
in
 Trustee
ct the
efram
h
h
h
h
h
h
d
 a
tio
 t
 st
 t
 st
 t
 st
eem
nta
m
the projec
the projec
the projec
o
t ti
ess w
 see
occas
on. T
 see
occas
on. T
 see
occas
on. T
 make
t. The
rma
g s
th 
th 
th 
o
fo
e c

 your requ
min
ojec
 succ
 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
in
ojec
n
 o
n
 o
n
 o
en t
e in
 could
 could
 could
rd
ties and fun
os
u pleas
s o
ojec
s o
ojec
s o
ojec
mor
the ti
ur app
rities
ur app
rities
ur app
rities
 Wo
ted that

 Trust
o
o
 Trust
o
o
 Trust
o
o
n
o
s your pr
 as 
ss your pr
 lik
e
t, it ha
t, it ha
t, it ha
sio
ard
w
uld
ng. Can yo
 discu
 the pri
 the pri
 the pri
Deci
It was n
Trust's priori
Trust has ch
to
wo
timelin
lo
to
wishes you every
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
you every succes
 
 
 
 

$0
$0
$0
97
ended
$6,
mm
ount 
o
Am
Rec
 
 
 
 
4
5
8
0
0
0
0
02
1,3
8,9
5,0
ted 
$8,
$1
$3
$2
ount 
eques
Am
R
 
 
 
 

4
0
8
7
0
0
4
02
1,3
5,5
3,3
rojec
$8,
$1
$5
$3
 
st

Total P
Co
ve 
 
 
ct 
pro
rts
 
o
 
 
od 
 Im
r-Wise
 Fo
of 
roje
o
 
 P
y Legal 
 T
on Eff
 
en 
t Name
m
o
esia
thening 
unit
vati
an Wate
ening and
m
ritage
stainable and
Projec
Urb
Gard
Melanesian
He
Sea W
Melan
Fiji Oxygen
Streng
Com
Awareness
Su
Conser
es 
 
n

o
omi
 
on
tal La
ted
 
en
 
 
m
ity Ec
 Foundati
er
n
on
m
sto

mmu
stitute Limi
Cu
Co
In
Coral Sea
Cure Kids Fiji
Fiji Environ
Associati
 
 
 
 
 
-
12
-
88
-
95
-
13
21
71
21
44
21
71
21
72
Request ID
20
16
20
16
20
16
20
16


es 
es 
es 

es 
 
ered 
ent 
 
ered 
ent 
 
ered 
ent 
the 
ered 

ver
 
ent 
your 
o
m
o
m
o
m
o
m
nsid
your 
nsid
your 
nsid
with th
on 
u e
your 
nsid
of 
t wish
of 
t wish
of 
t wish
 Th
of 
t wish
sen t
co
 
co
 
co
 
yo
co
 
t.
sen t
t.
sen t
t.
ns 
wards 
sen t
t.
erit 
erit 
erit 
erit 
e m
e m
e m
e m
h
ion cho
e Trust 
ronger align
. The Trus
h
ion cho
e Trust 
ronger align
. The Trus
h
ion cho
e Trust 
ronger align
. The Trus
est alig
g criteria.
 contributi
 used to
 wishes 
h
ion cho
e Trust 
ronger align
. The Trus
 t
h
h
h
h
 st
 t
 st
 t
 st
in
 a
 t
 st
the projec
the projec
the projec
d
 be
t. 
the projec
 see
occas
on. T
o
th 
 see
occas
on. T
th 
 see
occas
on. T
th 
Trust
 see
occas
on. T
 make
t t
th 
o
ojec

 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
 your requ
pr
 this 
licati
ts had a
f the fund
s wi
in
 could
n
 o
 could
n
 o
 could
n
 o
ojec
n
 o
en t
 could
rd
s o
ojec
s o
ojec
s o
ojec
ties and fun
os
s o
ojec
ur app
rities
ha
ur app
rities
ur app
rities
ur app
rities
 Wo
 Trust
o
o
 Trust
o
o
 Trust
o
o
ted that
 Trust
o
o
n
o
t, it ha
t, it 
t, it ha
s your pr
f planting. The 
t, it ha
sio
 has ch
ard
 o
 the pri
 the pri
 the pri
w
sts
 the pri
Deci
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
you every succes
It was n
Trust's priori
Trust
to
co
success with the 
While the
projec
decline y
that other pr
to
you every succes
 
 
 
 
 

$0
$0
$0
0
$0
ended
0,0
$1
mm
ount 
o
Am
Rec
 
 
 
 
 
0
0
0
0
0
5
0
4
0
00
4,7
3,0
1,4
2,3
ted 
00,
$1
$1
$1
$6
$1
ount 
eques
Am
R
 
 
 
 

0
4

0
0
5
9
4
0
00
4,7
3,3
1,4
2,3
rojec
00,
$1
$1
$6
$1
 
$1
st
Total P
Co
 
n


tio
 
p
e Site 

 

o

ababia 
 

 land 
 Lif
of 
stry
ss f
ence 
r Sustainable 
on Trainin
y at L
us perce
o
t Name
pment in Fiji
 Ku Heritag
s f
 
vati
unit
 
elo
jin
del
agement Plan
m
o
m
Projec
Fifty years 
independ
indigeno
on sustainable
dev
Kun
M
Man
Hahalis
Village Fore
Conser
an Awarene
Kamiali Wild
co
Village
 
o
ent 
-
 
m
Maion
us 
 
o
o
p
 C
o
 
ala 
wa
vel
 
m
o
digen
 
er
  L
a Clan
ve
 Earth Inc
m
 Ra
n
e De
b
o
sto
gfort
Cu
Jekope
Lan
Leitana In
Nakarip
operati
Man o
Mor
Foundation Inc
 
 
 
 
 
 
-
20
-
84
-
82
-
43
-
70
21
57
21
71
21
88
21
62
21
58
Request ID
20
16
20
16
20
16
20
16
20
16


ct 
red 
es 
es 
ke 
 
ent 
 
ered 
ent 
 li
ish
the 

o
st 
nta
 The 
your 
o
m
o
m

o
nside
your 
nsid
co

with th
o
of 
t wish
of 
t w
 Th
 this 
sen t
co
 
co
 
n
t.
sen t
t.
ns 
buti
wards 
uld als
ject c
ase 
erit 
erit 
wo
with th
u ple
e m
e m
h
ion cho
e Trust 
ronger align
. The Trus
h
ion cho
e Trust 
ronger align
. The Trus
est alig
g criteria.
 contri
 used to
ees 
 group o
the pro
yo
 t
h
h
s this further.
cess 
 st
 t
 st
in
 a
the projec
the projec
d
 be
 the
cus
 suc
 see
occas
on. T
o
th 
 see
occas
on. T
th 
Trust
m
 make
t t
O. Can 
 dis
o

 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
 your requ
 fro
to

every
in
 could
n
 o
 could
n
 o
ojec
r NG
en t
at indicates 
o
o
rd
s o
ojec
s o
ojec
ties and fun
tion
h
os
 t
you 
ur app
rities
ur app
rities
% f
es 
 Wo
 Trust
o
o
 Trust
o
o
ted that
rma
 Advis
n
o
fo
t, it ha
t, it ha
s your pr
f planting. The 
 item
t. 
sio
ard
 o
e in
 the pri
 the pri
w
sts
Deci
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
you every succes
It was n
Trust's priori
Trust has ch
to
co
mor
budget
includes 10
the PDCT
Trust wish
projec
 
 
 

$0
$0
0
ended
0,0
$2
mm
ount 
o
Am
Rec
 
 
 
0
0
0
0
0
0
5,0
5,0
7,0
ted 
$2
$8
$2
ount 
eques
Am
R
 



0
0
00
00
7,0
rojec
00,
20,
$3
 
$1
$1
st
Total P
Co
 
 
 
ess 
 rural
al 
kers
 
 Kids Fiji
aren
ree
w
soci
ents in
en For
A
 sustainable 
ic 
 
t Name
ng/
m in 
m
pm
rack T
 
o
 T
n
elo
sh
use
u
Projec
Safe Hav
Traini
Progra
issues &
eco
dev
settings
B
Ho
ail 
 
m

d
 
 
ed Is
lan

ent Inc
er
gh
m
pm
o
sto
uhamm
G Hi
ventures
G Rura
vel
Cu
M
PN
Ad
PN
De
 
 
 
 
-
17
-
62
-
58
21
37
21
73
21
65
Request ID
20
15
20
16
20
16




es 
es 
ered 
ered 

ent 
ent 
you 

yo
 
 
o
m
o
m
with th
your 
your 
 Th
on 
es 
with th
 Th
on 
es 
nsid
nsid
of 
t wish
of 
t wish
ns 
ns 
sen t
co
 
co
 
t.
sen t
t.
 
 
erit 
erit 
est alig
g criteria.
 contributi
ect.
est alig
g criteria.
 contributi
ect.
e m
ion cho
e Trust 
ronger align
. The Trus
e m
ion cho
e Trust 
ronger align
. The Trus
in
 Trust wish
in
 Trust wish
h
h
h
h
d
 a
oj
d
 a
oj
 t
 st
 t
 st
the projec
the projec
 see
occas
on. T
 see
occas
on. T
 make
t. The
 make
t. The
th 
th 
o
the pr
o
the pr

 your requ
 your requ
jec
 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
in
ojec
o
n
 o
n
 o
en t
en t
 could
 could
rd
ties and fun
 with 
 with 
os
ties and fun
os
r pr
s o
ojec
s o
ojec
ur app
rities
ur app
rities
 Wo
ted that
cess
ted that
cess
 Trust
o
o
 Trust
o
o
n
o
s your pr
o
s you
t, it ha
, it ha
sio
ard
y suc
ard
y suc
ject
w
er
w
er
 the pri
 the pri
Deci
It was n
Trust's priori
Trust has ch
to
ev
It was n
Trust's priori
Trust has ch
to
ev
While the
projec
decline y
that other pr
to
you every succes
While the
pro
decline y
that other pr
to
you every succes
 
 
 


0
$0
$0
20
ended
0,0
$1,
$1
mm
ount 
o
Am
Rec
 
 
 
 
2
0
0
0
7
0
0
36
6,9
0,0
0,0
ted 
$6,
$4
$2
$5
ount 
eques
Am
R
 
 
 

9
0
0

8
6
0
00
6,2
2,2
0,0
rojec
00,
$9
$4
$4
 
$1
st
Total P
Co


 

s o
o
 
 
out 
gical 
le 
vac
p

 
lo
edge 
onal 
co
stem
nser
ons ab
owl
 
o
us e
g Culture
ge sy
f the 
t Name

d
 o
e Change 
vin
eef C
ersati
le
m
w
angered Species
tergenerati
nv
o
apua New Guinea
Projec
Curatin
in
co
indigeno
kn
the Buai kn
syste
Gunantuna peo
P
Climat
End
Awareness
Conser
Avisi R

ersit
 
 
 
gy
 
 
lo
on 
n
fela
er
o
n
m
ch and 
vati
e Trend
sto
ech
undatio
Cu
Queensland Univ
of T
Resear
Conser
Fo
Te Hin
Wilson Ko
 
 
 
 
 
-
04
-
21
-
68
-
20
21
70
21
73
21
75
21
73
Request ID
20
16
20
16
20
16
20
16


ts 

es 

es 
 
ered 
ent 
 
een 

 
ered 
ent 

your 
o
m
o
e reall
o
m
you 
nsid
your 
your 
 reques
ailable 
ver
nsid
with th
on 
of 
t wish
of 
av
of 
t wish
 Th
es 
sen t
co
 
wer
u e
co
 
t.
sen t
o
sen t
t.
ns 
erit 
erit 
t but fundin
erit 
 that had b
ount of
ount 
es y
 
e m
e m
e m
h
ion cho
e Trust 
ronger align
. The Trus
h
ion cho
e Trust 
es
am
ish
h
ion cho
e Trust 
ronger align
. The Trus
est alig
g criteria.
 contributi
ect.
 t
h
h
 am
h
 st
 t
m
rojec

w
 t
 st
in
 a
 Trust wish
oj
the projec
o
 P
tal
t. 
the projec
d
 see
occas
on. T
o
th 
 see
occas
on. T
 see
occas
on. T
outc
er th
Trust 
th 
t. The
Karioi
ov
ojec
 make
o
the pr

 this 
licati
ts had a
f the fund
s wi
 this 
licati
the t
pr
 this 
licati
ts had a
f the fund
s wi
 your requ
in
 could
n
 o
 could
n
ojec
the 
The 
 could
n
 o
en t
rd
s o
ojec
s o
th the 
 with 
 with 
s o
ojec
ties and fun
os
ur app
rities
ur app
ificantly 
on.   
ur app
rities
 Wo
 Trust
o
o
 Trust
o
 with 
 Trust
o
o
ted that
cess
n
ed wi
o
t, it ha
cati
s your pr
o
t, it ha
sio
ct, it ha
mited,
je
ard
y suc
 the pri
 the pri
w
er
Deci
While the
projec
decline y
that other pr
to
you every succes
 
While the
pro
decline y
impress
achieved
was li
being sign
for all
success with the 
While the
projec
decline y
that other pr
to
you every succes
It was n
Trust's priori
Trust has ch
to
ev
 
 
 
 


$0
$0
$0
17
9
ended
8,
4,2
$6
$1
mm
ount 
o
Am
Rec
 
 
 
 
 
8
6
0
9
2
54
9
2
60
9,8
,8
 
8,8
9,3
ted 
$6,
$1
14
$3
$2
$6
ount 
eques
Am
R
 
 
 

0

0

0
13
90
60
49
0,0
,6
rojec
84,
$6,
54,
$3
55
NEW ZEALAND
 
$9
$6
$4
st
Total P
Co

 
gi 
 
-

vatged 
sistanc

h
ogram
e Puran
 Pr
ojec
 
Mauri 
t Name
lture Re

ricu
Projec
Rural Disad
Women As
Through T
Ag
Growing
Karioi Pr
Te Oh
Wananga
Experienc

 
 
oa Ne
 
ear
el Gage
 Trust
 
ent
er
 Aot
 
anaki 
m
m
d
 Samu
sto
Cu

Zonah United
A Rocha
Zealan
Deane
East Tar
Environ
 
 
 
 
 
-
03
-
32
-
18
-
33
21
72
21
56
21
70
21
63
Request ID
20
16
 
 
20
16
20
16
20
16



es 
es 
es 
ered 
ered 

ered 

ent 
ent 
ent 
you 
 
 
 
o
m
o
m

you 
you
o
m
with th
your 
your 
 Th
on 
es 
nsid
nsid
with th
on 
nsid
of 
t wish
of 
t wish
 Th
es 
of 
t wish
ns 
sen t
co
 
co
 
co
 
t.
sen t
t.
ns 
sen t
t.
 
erit 
erit 
 
erit 
est alig
g criteria.
 contributi
ect.
e m
ion cho
e Trust 
ronger align
. The Trus
e m
ion cho
e Trust 
ronger align
. The Trus
est alig
g criteria.
 contributi
ect.
e m
ion cho
e Trust 
ronger align
. The Trus
in
 Trust wish
h
h
h
h
in
 Trust wish
h
h
d
 a
oj
 t
 st
 t
 st
 a
oj
 t
 st
the projec
the projec
d
the projec
 see
occas
on. T
 see
occas
on. T
 pr
 see
occas
on. T
 make
t. The
th 
th 
 make
t. The
th 
o
the pr
o
the

 your requ
 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
 your requ
 this 
licati
ts had a
f the fund
s wi
in
ojec
n
 o
n
 o
ojec
n
 o
en t
 could
 could
en t
 could
rd
ties and fun
 with 
 with 
os
s o
ojec
s o
ojec
ties and fun
os
s o
ojec
ur app
rities
ur app
rities
ur app
rities
 Wo
ted that
cess
 Trust
o
o
 Trust
o
o
ted that
cess
 Trust
o
o
n
o
s your pr
o
t, it ha
t, it ha
s your pr
t, it ha
sio
ard
y suc
ard
y suc
w
er
 the pri
 the pri
w
er
 the pri
Deci
It was n
Trust's priori
Trust has ch
to
ev
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
you every succes
It was n
Trust's priori
Trust has ch
to
ev
While the
projec
decline y
that other pr
to
you every succes
 
 
 
 


$0
$0
$0
50
91
ended
$6,
$2,
mm
ount 
o
Am
Rec
 
 
 
 
 
4
0
0
0
0
0
0
0
50
91
2,0
0,0
5,0
ted 
$6,
$2,
$2
$5
$1
ount 
eques
Am
R
 
 
 
 

9
8

0
0
0
0
0
00
59
7,1
0,8
0,0
rojec
45,
$3,
$5
$5
$2
 
$2
st
Total P
Co
 

h-
ird
ut
 
-yo
of 
 
 
tenance
 bellb
aditional 
a - 
gs 
od, 
 uses
cal 
on 
o
orical, 
y tr

 main
g lo
vin
 
 
on, and
ter 
t Name
of the
enzshed 
g
 M
ition Fak
ve: Pacific
agement
kelau
logical, f
rmwa
Projec
Return 
Teachin
communit
harakeke
and wea
New
Buildin
Exhib
To
Captain Sprin
Reser
led integrati
eco
cultural, hist
recreati
sto
man

 
 
 
enzshed 

ety
ject
 
 Distric
ci
 
d
mt Trust
 
 
o
ted
y M
er
ra
ville 
rate
 Athlet
m
unit
ātiki Pro
rpo
m
rpo
are
ageme
sto
 
-P
hn Craig
co
c.
Cu
Jo
Kaip
In
Morrins
Com
In
Papakura and
Historical S
Inco
Pro
Man
 
 
 
 
 
 
-
17
-
83
-
53
-
74
-
59
21
52
21
43
21
68
21
65
21
36
Request ID
20
16
20
16
20
16
20
16
20
15


-
 
 
es 
es 
o
 
ered 
ent 
 
ered 
ent 
 t

 
 
 one

ay 
your 
o
m
o
m
o
gnises 
d
nsid
your 
nsid
your 
ongoin

of 
t wish
of 
tee
 are
t wish
of 
eco
 fun
sen t
co
 
co
 
e but 
aikat
at m
t.
sen t
r the 
t.
sen t
 an 
o
h
erit 
erit 
 o
erit 
m
n
g nature. The
with th
e m
e m
g through the 
ent
e m
 like W
aritable Trust
h
ion cho
e Trust 
ronger align
. The Trus
h
ion cho
e Trust 
ronger align
. The Trus
her there
in
m
. The Trus
h
ion cho
e Trust r
this o
h
nding t
goin
 t
h
h
h
ogram
n
cess 
 st
 t
 st
et
d
 t
Trust is t
uld
o
the projec
the projec
Pr
o
f fu
 suc
 see
occas
on. T
 w
o
th 
 see
occas
on. T
 wh
oples
th 
 see
occas
on. T
f the 
ting C
to
of fun
Pe
ot fund 
 o
es 
of an 

 Develop
 this 
licati
ts had a
f the fund
s wi
 this 
ts had a
f the fund
es 
s wi
 this 
licati
asifika 
 Trust
urc
ts 
every
in
 could
n
 o
 could
n
 o
k in
n
 P
o
cific 
 could
tent
oadcas
o
rd
s o
ojec
s o
ojec
o
urc
o
s o
y cann
ojec
you 
ur app
rities
ur applicati
rities
u l
r Social
r Pa
ur app
e in
s. The
y Br
es 
 Wo
 Trust
o
o
 Trust
o
o
o
 Trust
o
of the
atel
n
ve s
 fo
 fo

t, it ha
t, it ha
t, it ha
 suit pr
t. 
sio
alu
oject
re other s
gest y
istry
istry
 the pri
 the pri
mmunit
plo
Deci
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
sug
alternati
Min
Min
you every succes
While the
projec
decline y
the v
unfortun
basis, as th
off pr
Co
ex
better
Trust wish
projec
 
 
 
 
$0
$0
$0
ended
mm
ount 
o
Am
Rec
 
 
 
0
0
0
0
0
16
5,0
1,0
ted 
$4,
$3
$1
ount 
eques
Am
R
 
 
 

8
0
0
3
0
16
4,6
5,0
rojec
$4,
$7
$1
 
st

Total P
Co

 
k; 
ko 
unity 
mmin
 
m
Par
ka
ō
on
rogra
t Name
2 k
 
 P
 the 
vati
/2
ect
21
nser
Projec
Ark in
20
co
Oranga Com
Proj
Pasifika
 
Of 
 

ty 
 
ject
unit
 t
cie
m
o
Pro
m
 

est And Bird
 S
o
ting 
er
aland Inc
 C
o
m
 For
tion
 
sto
tec
Cu
Royal
Pro
New Ze
The Synerg
Trust
Waikat
Broadcas
Charitable Trus
 
 
 
 
-
67
-
14
-
49
21
72
21
72
21
66
Request ID
20
16
20
16
20
16




es 
 
ered 

ver

 
ent 
uld
you 
o
m
with th
your 
 Th
on 
o

u e
with th
 Th
on 
es 
nsid
of 
t wish
ns 
s w
wards 
yo
ns 
sen t
co
 
to
wer
t.
 
erit 
est alig
g criteria.
 contributi
these 
 wishes 
est alig
g criteria.
 contributi
ect.
e m
ion cho
e Trust 
ronger align
. The Trus
in
 Trustee
t used 
in
 Trust wish
h
h
d
 a
o
d
 a
oj
 t
 st
n
elt 
Trust
t. 
the projec
 see
occas
on. T
 make
t. The
s it f
 make
t. The
th 
o
ojec
o
the pr

 your requ
t was 
. The 
pr
 your requ
 this 
licati
ts had a
f the fund
s wi
in
ojec
ojec
n
 o
en t
sts a
h
en t
 could
rd
o
ties and fun
 with 
os
gran
 c
ties and fun
os
s o
ojec
ur app
rities
 Wo
ted that
ted that
cess
 Trust
o
o
n
o
s your pr
if this 
o
media
s your pr
t, it ha
sio
ard
ard
y suc
w
w
er
 the pri
Deci
It was n
Trust's priori
Trust has ch
to
prefer 
social 
significantly hig
success with the 
It was n
Trust's priori
Trust has ch
to
ev
 
While the
projec
decline y
that other pr
to
you every succes
 
 



$0
96
0
67
ended
$2,
0,0
6,
$2
$4
mm
ount 
o
Am
Rec
 
 
 
 
0
0
0
4
39
0
00
0,1
,5
0,0
ted 
$4,
$4
65
$9
$2
ount 
eques
Am
R
NESIA 
 
 
Y
 

9
7

0
6
6
0
23
3,3
9,5
POL
0,0
rojec
$2
$9
39,
7

$9
 
st

$1,
Total P
Co
 
 
ys
on
 
 

ga
f the 
erwa
ilitati
fo
n
o
s o
 T
ehab
wer 
t Name
 in
ian
o R
ools
Projec
Guard
Waitaki Wat
Hoih
Solar Po
Sch
 
unity 
 
m
 
m
er
yed Penguin 
E Pacific Trust
m
-e
ens Trust
 
AR
sto
C
Cu
Waitaki Co
Gard
Yellow
Trust
Eco
 
 
 
 
-
90
-
17
-
26
21
60
21
68
21
73
Request ID
20
16
20
16
 
 
20
16

 
 
o

 
es 
es 
 
ered 
ent 
ve 
ered 
ered 
s als
th the
Trust 
t.
 
ent 
 
ent 

your 
o
m
m
o
m
you 
nsid
your 
to
nsid
your 
nsid
with th
on 
of 
tee
t wish
t wish
 Th
ernati
ojec
of 
of 
ti
es 
sen t
co
on wi
pr
sen 
co
 
co
t.
sen t
t. 
ns 
erit 
 alt
erit 
erit 
njucti
the 
 
e m
e m
e m
h
ion cho
e Trust 
ronger align
. The Trus
 lifespan. The 
ith 
h
ion cho
e Trust 
ronger align
. The Trus
h
ion cho
e Trust 
ronger align
. The Trus
est alig
g criteria.
 contribu
ect.
 t
h
 co
h
h
 st
in
 Trust wish
ked into
 t
 st
 t
 st
d
 a
oj
o
the projec
the projec
 see
occas
on. T
o
ess w
 see
occas
on. T
th 
 see
occas
on. T
th 
had a
 used in
 longer
 make
t. The
o
the pr

 this 
licati
ts 
f the fund
e a
 succ
 this 
licati
ts had a
f the fund
s wi
 this 
licati
ts had a
f the fund
s wi
 your requ
in
 could
n
 o
u had l
 be
 could
n
 o
 could
n
 o
ojec
en t
rd
s o
ojec
uld
 with 
y hav
s o
ojec
s o
ojec
ties and fun
os
ur app
rities
co
ur app
rities
ur app
rities
 Wo
 Trust
o
o
 Trust
o
o
 Trust
o
o
ted that
cess
n
ed if yo
 ma
o
t, it ha
t, it ha
t, it ha
s your pr
sio
ard
y suc
 the pri
nder
 the pri
 the pri
w
er
Deci
While the
projec
decline y
that other pr
to
wo
traps that 
A24 and
wishes you every
While the
projec
decline y
that other pr
to
you every succes
While the
projec
decline y
that other pr
to
you every succes
It was n
Trust's priori
Trust has ch
to
ev
 
 
 
 
 


$0
$0
$0
51
1
5

ended
$7,
$7,
mm
ount 
o
Am
Rec
 
 
 
 
 
4
3
7
9
4
80
34
51
9,1
8,3
8,6
,7
ted 
$7,
$1
$3
$1
73
$1

ount 
eques
Am
R
 
 
 
 
 

2
3
0
2
4
4
8
17
45
9,5
8,3
8,6
,0
rojec
$9,
$2
$3
$1
86
 
$1
st
Total P
Co

 e
ject 
 trap
an 
 
ond 
 
o
ro
 
Organic 
ues
ping a 

 
 resp
se 
owcas
n P
y
ild 
la’ 
h
ment in
ered 
tion to 
o
 and
a Village 
atio
t Name
 Marq
unit
m
ng c
eat
-lay
 Ola
ers Sh
rest
 help
di
nga: develo
lti
terven
 child abu
stainable Tar
Projec
NZ Good nature
to
com
En
maltr
To
mu
in
prevent
to
‘Lima
Grow
Sapunao
Su
Farming and 
Refo
 
 
ologie
of 
 
 

 
sie
ods
 

er
ersit
o
rifo
m
é d'Ornith
lyné
m
sto
ckland
Cu
Sociét
de Po
The Univ
Au
TV5 Sa
USO Ag
 
 
 
 
 
 
-
72
-
09
-
24
-
48
21
71
21
65
21
64
21
63
Request ID
20
16
20
16
20
16
20
16
 
 
 
 

 
 
 
 
 
 
 
 
 

Document Outline