Workshop objectives
Our objectives for today are to:
• provide the most up-to-date perspective on the MRT and SHI packages
• highlight outstanding questions to be answered, including in particular areas of further investigation required to prove 
up the best value combination of investments.
• Get GRG input on implications and next steps, including:
- getting wider partner and political input on the findings to date
- implications for stakeholder and community engagement.
under the Official Information Act 1982
3 August 2020 Governance Reference Group
2
Confidential
Released 


Programme Context
Timeline of activities to date

Late 2018 - prepared a Programme Business Case (PBC): a multimodal package of transport investments called the 
Recommended Programme of Investment (RPI)

May 2019 - the government announced an Indicative Package (which contained most but not al  the elements of the 
RPI). 
The Indicative Package modelled required capital investment at $3.7B delivered over 20 years, with a total 
funding requirement over 30 years $6.4B (including net operating costs & financing payments, al  P95 
inflated).

2020-21 - the Programme, through the IBCs, is seeking to ful y evaluate the benefits and costs of the Indicative 
Package, and what combination of projects wil  deliver the greatest overall benefits for a given level of investment
under the Official Information Act 1982
3 August 2020 Governance Reference Group
3
Confidential
Released 


Changes/updates to assumptions since PBC
Work undertaken by partners and consultants has resulted in some revisions to key assumptions

Planning for Growth work now suggests growth preferred in south, west and north
– Kilbirnie and parts of Miramar less preferred due to resilience concerns.

Volume of trips to the airport reduced – future growth less certain post COVID

Benchmarking offshore MRT routes has shown that the assumed average speed of the PBC Baseline MRT route may 
be optimistic.

Bus Priority Action Plan has confirmed dual spine required to meet bus/MRT capacity targets

Importance of integrating a new MRT with existing rail as part of the regional mass rapid transit system has become 
increasingly apparent

Draft update to Regional Rail Plan shows that mode shift targets require significant investment in rail to reduce 
network constraints, and enable service frequencies of 10 min by about 2030
– This will require more trains to provide the capacity and significant improvements in customer amenities to 
improve the customer experience and access to the rail mass transit system

More detailed understanding of constraints around physical constructability and implementability.
under the Official Information Act 1982
3 August 2020
Governance Reference Group
4
Confidential
Released 


Our Vision for Mass Rapid Transit for Wellington 
Deliver a step change 
in public transport capacity, quality and performance 
to drive mode shift 
and support urban intensification.
Noting that the draft Government Policy Statement for Land Transport 2021 defines Rapid Transit as:
“A fast, frequent, reliable, and high capacity form of urban public transport that can move a large number of people. Rapid 
transit vehicles run on permanent routes, and are largely separated from other traffic to avoid being delayed by congestion. 
Examples include rail, light rail, and bus rapid transit systems.”
under the Official Information Act 1982
3 August 2020
Governance Reference Group
5
Confidential
Released 


Scope of the Mass Rapid Transit IBC

Develop an MRT system that contributes to the wider objectives of the LGWM programme
– Review the PBC Baseline route as a starting point for business case options development
– Develop route options and confirm a recommended route(s)
– Recommend an MRT mode or modes compatible with the recommended routes.

Demonstrate the viability of MRT with respect to cost, consentability, implementability and risk.

Demonstrate the interface with the wider transport system and Wel ington urban fabric.

Present a scope and management case for the next steps in the investigation, delivery and 
staging.

Provide Project Partners with information needed to inform LTP, RLTP and NLTP processes. 
under the Official Information Act 1982
3 August 2020
Governance Reference Group
6
Confidential
Released 


under the Official Information Act 1982
Released 


under the Official Information Act 1982
Released 


MRT System Options Development and Assessment
• Mass Rapid Transit is being planned as a system for the whole city.
• Current planning is focused on regional y important destinations as recognised in the 
Baseline route, in three sections:

Section 1 - Wel ington Railway Station to the Hospital & Newtown

Section 2 - Route extension to the Airport and eastern suburbs

Section 3 - Route extensions, including future options, beyond Newtown to the 
southern suburbs
• The design of the MRT system wil  be future-proofed, to enable future extension to the 
south, west (Karori) and/or to the northern suburbs if desired at some future date.
under the Official Information Act 1982
3 August 2020
Governance Reference Group
9
Confidential
Released 




Route Options: Section 1
• Section 1 of the Baseline route is general y wel  supported.
• It provides a logical and relatively direct connection between the 
city centre and Newtown, including Wel ington Hospital. 
• Three options were shortlisted, plus a sub-option to completely 
avoid the Basin Reserve.
• Section 1 to Newtown was assessed to determine if it could 
operate as a standalone service. It was found to:
• be too short to be effective in attracting customers, and 
• would stil  require most of the bus network to continue to 
operate, meaning the operational cost to run the service would 
be additional to the existing cost rather than in place of, but
• would make sense as a first phase of construction of an MRT 
system
under the Official Information Act 1982
3 August 2020
Governance Reference Group
10
Confidential
Released 


under the Official Information Act 1982
Released 


under the Official Information Act 1982
Released 












Route option summary
The route options recommended for investigation 
as part of the IBC are:
• Option 1: the Baseline route, via a Mt Albert 
tunnel to the airport
• Option 2: to Miramar North, Seatoun and the 
airport, via the Mt Victoria tunnel
• Possible future route extension option south: to 
Island Bay via Newtown and Berhampore
• Note: Both Option 1 and 2 could be combined 
with a southern route extension
• Evaluating al  of the options above wil  provide 
under the Official Information Act 1982
us with a rich picture of costs and benefits
3 August 2020
Governance Reference Group
13
Confidential
Released 


under the Official Information Act 1982
Released 



SHI Scope – Draft Vision
People and goods are moved local y and regional y to, from, and through Wel ington using an 
efficient strategic corridor that enables a city of attractive streets and places.
under the Official Information Act 1982
3 August 2020
Governance Reference Group
15
Confidential
Released 


under the Official Information Act 1982
Released 


Basin Reserve – Grade Separated
Grade Separated Arras Tunnel Extension options:
1. Effectively one road network solution.
2. Provides variable amenity, landscaping, and development opportunities.
3. Flexible to accommodate MRT options.
4. Flexible to interface with existing (Vivian St and Kent Tce) and potential future (Te Aro) southbound State Highway 
alignments.
5. Similar to PBC option.
under the Official Information Act 1982
3 August 2020
Governance Reference Group
17
Confidential
Released 

9(2)(b)(ii), 9(2)(j)
under the Official Information Act 1982
Released 

9(2)(b)(ii), 9(2)(j)
under the Official Information Act 1982
Released 

9(2)(b)(ii), 9(2)(j)
under the Official Information Act 1982
Released 

9(2)(b)(ii), 9(2)(j)
under the Official Information Act 1982
Released 


under the Official Information Act 1982
Released 


Summary of findings to date
Overall
• Stronger than forecast growth in the north (already the highest volume corridor).
• Airport (at least in the short-medium term) less of a demand driver.
• Planning for Growth has noted there are a number of hazard issues for Kilbirnie and Lyal  Bay relating to sea level 
rise, flooding, ground shaking, liquefaction and tsunami.  These may mean the 6-storey minimum building height 
required by the NPS-UD is not appropriate across these areas. 
Mass Rapid Transit
• Further design work underway to enable faster MRT speeds.
• Investigating ways to minimise requirements to transfer from local feeder buses to the MRT service.
• Significant intensification would need to be assumed to deliver required level of economic benefits.
• Options emerging:

railway station to Airport – route from PBC, or variation along Kent/Cambridge, with significant intensification 
along the route

route that splits at/around Basin – one through Newtown, one to airport with variations potential y extending 
coverage to wider Miramar Peninsula
under the Official Information Act 1982

potential future extension from Newtown through Berhampore to Island Bay.
3 August 2020
Governance Reference Group
23
Confidential
Released 


Summarising the findings to date
Strategic Highways
• There are physical workable options for the Basin Reserve and additional Mt Victoria Tunnel, and 
these can be physically integrated with different MRT options, however the performance of each of 
these options is stil  required to be assessed to confirm if they achieve the LGWM outcomes sought, 
and detailed model ing is now underway.
• The options are ‘future-proofed’ to respond to possible future upgrades (particularly through Te Aro).
• Improvements at the Basin and Mt Victoria Tunnel wil  primarily benefit those travel ing to/from the 
South and East
• City Streets is an important Programme component – to encourage sufficient mode shift to reduce the 
number of local trips on the state highways in combination with MRT
• Retaining the existing SH1 alignment on Vivian Street and Kent Terrace means that only minimal 
improvements to PT or active mode safety and efficiency outcomes can be made for the high number 
of north and south conflicts trips across SH1.
under the Official Information Act 1982
3 August 2020
Governance Reference Group
24
Confidential
Released 


under the Official Information Act 1982
Released 


Next steps: Transport performance evaluation
In the next phase of evaluation, outputs from the Wel ington transport/traffic model wil  be used to understand how well the 
physical options perform from a transport view. Broader evaluation of benefits and costs to fol ow.  Some of the questions 
we are seeking to answer are:
1. How do we best configure a new MRT system, together with investments into City Streets, such that sufficient trips are 
taken out of the network to counteract the loss of lane capacity along the Quays?
2. How many trips are removed from the city network due to the investments proposed in the Strategic Highways IBC?
3. Do key regional trips see a reduction in total travel time?
4. How effective might a Parking Levy be as a tool on top of other measures to induce mode shift?
5. How effective are the options in reducing conflicts between modes, or between traffic travel ing north to south (the 
dominant direction of travel in Wel ington) versus traffic travelling west to east?
6. What is the optimal usage of capacity through a new Mt Victoria tunnel?
7. What is the impact of changes to key assumptions, in particular impact of Covid, population growth changes and other 
matters relating to the current or future network operation
under the Official Information Act 1982
3 August 2020
Governance Reference Group
26
Confidential
Released 


Questions / Discussion
General level of comfort with the shortlist options identified?
Guidance for how we engage with wider Councils?
Particular further information that you would like to see?
under the Official Information Act 1982
3 August 2020
Governance Reference Group
27
Confidential
Released