Property ID: 3354000
Section A – Advice Notes
Planning Advice Notes
1. Accessible car parking spaces shall have clear ground marking in accordance with the
international symbol of access.
2. If during the course of undertaking the site works there is a discovery made of any
archaeological find, or suspected find, the work on that portion of the site should cease
immediately and Heritage NZ and a representative of the relevant local Iwi contacted. It is
unlawful to modify, damage or destroy an archaeological site without prior authority from
1982
the trust under the Historic Places Act 1993. Please contact Heritage New Zealand to
obtain the Accidental Discovery Protocol Guidelines. A point of contact is Bill Edwards via
09 407 0470 or 09 407 0471 or [email address]
3. It is recommended that you contact Heritage New Zealand to discuss your proposal
Act
because Heritage New Zealand may require an archaeologist undertake an archaeological
survey before works commence.
4. You must comply with the conditions of Resource Consent 2190517 Granted 18/04/19.
5. Before issue of Code Compliance Certificate, please ensure that a Vehicle Crossing
application has been applied for and granted (application form). Vehicle crossing to be
constructed in accordance with Council’s Engineering Standards for Vehicle Crossings and
all Bylaws of the Council in force at the time of such construction. Any queries regarding
this please on the Monitoring Team on 0800 920029.
6. Whilst the building consent has now been issued, we note that some aspects of the work
Information
involving Council-owned land will not be able to proceed until an encroachment license has
been issued by the Council in its role as landowner. Please apply for a License to Occupy a
Portion of Road in relation to the proposed Retaining Walls being constructed within Legal
Road.
7. Assessment of your consent has highlighted the need for an Earthworks Permit under the
Control of Earthworks Bylaw. Please note that this Earthworks Permit must be granted prior
Official
to any Earthworks commencing. If you require any assistance in this matter, please contact
the Duty Planner on 0800 920 029 or [email address]
the
Documentation
Please read all documentation associated with this building consent in detail, documentation
includes:
the building consent, which lists building consent conditions and any attachments, if applicable
a schedule of the inspection requirements for this project; and
under
advice on any documentation that maybe required for example, producer statements and
certificates
Booking inspections
Please make sure that you call for the inspections identified in section B of this documentation. It
is advisable that you plan your inspections well ahead of time and book these inspections with as
much notice as possible. If insufficient notice is given, Council may not be able to schedule the
inspection at your preferred time and this may cause construction delays.
Released
Consent documents on site
Please ensure that a complete set of the approved building consent documents is on site at all
times. Plans must be printed to the original scale submitted for building consent and be collated
into a set.
Property ID: 3354000
Changes during construction
If you wish to make changes during construction, you will either have to apply for an amendment
or a minor variation.
An amendment is something that materially affects compliance (e.g. structural changes) whereas
a minor variation is a small change (e.g. changing the brand of insulation).
Amendments must be applied for in the same manner as if it were a building consent. Minor
variations can be approved on site.
1982
Water meter; waste water and storm water connections
If you require a water meter or connection to Council services, you must seek approval from
Act
Councils Infrastructure Department. Application forms are available on our website at:
https://www.fndc.govt.nz/services/forms-and-pamphlets-index/water-wastewater-and-refuse
Information
Official
the
under
Released
Property ID: 3354000
Section B - Schedule of Inspections
The following inspections have been identified as required for this building
project:
209A
Strip Footing Foundation
To check soil conditions and the size and depth of footings prior to the
placement of concrete. All reinforcing steel must be in place and be tied and
supported on chairs. Reinforcing steel appropriate grade and size.
1982
Note: If you are unable to locate survey pegs a Registered Land Surveyor’s
certificate will be required and must be provided at time of inspection.
Act
209E
Pole Retaining Wall Foundation
To check; location to boundary, size and depth of holes, size and treatment
level of poles, mPa of concrete to be used.
212
Under Slab Plumbing
To check all under slab drainage and plumbing; all pipes to be under test and
exposed for inspection. As-built plan and Plumber to be on site for inspection.
Information
213B
Concrete Slab on-Grade
To check that hard fill has been compacted; DPM placed; reinforcement is
tied and supported in chairs; and starter bars fitted. A string-line must be in
place to check slab thickness.
Note: A PS4 is required where hard fill exceeds 600mm.
If you are unable to locate survey pegs a Registered Land Surveyor’s
certificate will be required and must be provided at time of inspection.
Official
222A
Wall and Roof Framing
the
To check; hold down straps, bolts, wall and roof framing members; truss
fixings, wall and roof bracing tie downs; wall framing; beams and lintels;
plywood substrates for membranes including falls and outlets.
Note: This inspection is carried out prior to building wrap being fitted.
under
223
Cavity Wrap
To check the cavity has been formed; cavity battens; cavity closers and
flashings are all in place; windows to be fitted.
226A
Cladding
To check the installation of the cladding system; junctions between different
claddings, flashings, etc., to ensure that the exterior of the building is
Released
weathertight.
Property ID: 3354000
229A
Preline Building
To check the building is weathertight, proprietary connections for bracing
elements installed and moisture content below 18%, prior to fixing any internal
linings and to check the installation of all wall, ceiling and mid-floor insulation
(thermal and acoustic) prior to installing interior linings.
Note: Cladding must be completed; windows installed and building
completely weathertight. All services (electrical and plumbing) complete.
1982
229B
Preline Plumbing
To check pipe work is under test (water supply and soil wastes); pressure test
to be on at time of inspection.
Act
Note: This inspection may be included with the Preline Building inspection.
229C
Insulation
To check that all insulation has been friction fitted and is the correct R-value.
237B
Post Line (fire ratings)
To check fire rated linings; materials, collars, wraps and other passive fire
protection measures including suspended ceilings (if applicable) prior to any
stopping.
Information
241A
Drainage (conventional)
To check that all stormwater and sewer drains have been laid to the correct
fall and are under test prior to backfilling trenches.
Note: An as-built plan is required for all work at time of inspection.
Official
241C
Stormwater Detention or Retention Tank
To check the location and installation of any stormwater detention or retention
the
tanks.
241D
Effluent Disposal System, Septic Tank, Effluent Field
To check the correct system installed, location, filters, dripper lines, surface
water interception drains in place and field correct size for design.
under
306B
Final Inspection - Commercial
To check all construction associated with the building consent has been
completed; this includes painting and decorating; floor coverings; fixtures;
fittings; electrical work; heating appliances; etc. Ground levels established;
driveways and car parking areas formed and landscaping completed. All
signage (accessibility and egress) in place. All specified systems installed,
tested and commissioned.
Released
Note: Electricity must be connected at time of inspection.
Property ID: 3354000
Section C – Documentation required
The following producer statements, testing certificates and warrantees are
required to confirm compliance during construction:
Energy Works Certificate - Electrical
The electrician is required to submit an energy works certificate certifying that all electrical
installations meet the requirements of Clause G9 (Electricity) of the New Zealand Building Code
and the Electrical Regulations.
1982
Fire Alarm System Certification
The installer and an accredited inspection body are required to provide a Certificate of Completion
Act
for Fire Alarm System confirming that it has been installed, tested and commissioned in
accordance with the nominated performance standard.
The installer must also provide an as-built plan showing the location of each of the specified
systems that they have installed.
Other Specified Systems – Installation, Testing and Commissioning Certificates
The installer must provide a certificate confirming that any other specified systems have been
installed, tested and commissioned in accordance with the nominated performance standard.
Information
Certificates are required for each of the following systems:
Emergency lighting
Emergency power supply
Interfaced/mechanical ventilation systems
The installer must also provide an as-built plan showing the location of each of the specified
Official
systems that they have installed.
Wastewater (PS4)
the
Producer statement construction review (PS4) is to be submitted by the engineer for the
observation and construction of the on-site wastewater treatment and disposal system.
Confirmation is also required that the work complies with the design approved by this building
consent.
under
Water Tank
Install water storage tank with minimum capacity 45,000 litres for fire-fighting purposes complete
with an outlet compatible with Fire and Emergency NZ requirements.
PS4 – Other
Construction monitoring and PS4 from Wilton Joubert Ltd for: Site cut, fill compaction, footings
Released
pre-pour, beam connections/portal frame and retaining wall holes and poles.