This is an HTML version of an attachment to the Official Information request 'Operational Reviews - Vegetation Fires'.





         Created by:  
Himatangi Beach Rural Fire 
  Operational Efficiency 
                  
& Readiness 
3rd Alarm Rural Fire Debrief 
   Fire and Emergency NZ NHQ 
under the Official Information Act 1982
Released Debrief conducted at Foxton Fire Station 25 October 2018 
Incident number: F2626104 
Incident Date: 8 October 2018 


 
Operational Efficiency and Readiness 
The purpose of Operational Efficiency and Readiness (OER) is to support the National Commander Urban and 
National  Manager  Rural  to  achieve  their  responsibilities  for  the  "Operational  Efficiency  and  Operational 
Readiness” of Fire and Emergency New Zealand. 
Operational  Efficiency  &  Readiness  is  independent,  objective  and  provides  quality  assurance  advice  to 
management  to  support  continuous  improvement  in  regard  to  the  operational  efficiency  and  operational 
readiness of Fire and Emergency New Zealand.  
The National Operational Efficiency Manager reports to the Fire and Emergency NZ Audit and Risk Committee 
to provide an impartial and unbiased ethos across all operational auditing activities. 
1982
 
Purpose of Debrief 

Act 
OER approached the Area Commander, Whanganui, and requested to conduct a command debrief 
with Officers of Urban, Rural, and Defense personnel in relation to a rural fire that occurred on 6 
October 2018. This was an opportunity to assess the integrated urban, rural and Defense response 
and subsequent management of a rural incident in the Fire and Emergency New Zealand 
environment. 
The Manager, OER attended and facilitated the command debrief allowing unconstrained 
conversation to occur and to allow all participants to speak freely.  
 
Information 
Methodology 
The Manager of OER met with al  the personnel who assumed a command role except for the first OIC. 
It was a facilitated discussion to ensure al  command decisions were discussed.  
 
Official 
Discussion 
At 14:58 hours Central Communications Centre (Comcen) received a 111 call to a scrub fire 
due to a controlled burn out of control at 615A Himatangi Beach Road, Himatangi Beach. The 
the 
first alarm response was for Himatangi 381 (HIMA381). 
 
A 2nd alarm and a request for a tanker was made en route.  
 
under 
On arrival there were two fires in pine slash, one was about 200m2 and endangering pine 
trees. The other was some distance away and likely to burn more scrub. HIMA381 completed a 
size up on the fire on the eastern side which was threatening the pine trees and established a 
compressed air foam (CAF) delivery on a flank to cut the fire off and prevent it travelling up the 
hill to the trees. Before the second alarm appliances arrived, the water was exhausted. 
 
A sitrep indicating the above was transmitted at 15:16 hours and a 3rd alarm was transmitted. 
 
Released 
Foxton 477 (FOXT477) and Foxton Beach 421 (FOXT421) arrived at the incident at about 
15:25 hours. A road cone left at the entrance to the incident assisted both appliances in 
 


locating HIMA381. FOXT421 supplied water to HIMA381 while FOXT477 was directed to 
contain the western scrub fire. FOXT421 with one driver would ferry water for the duration of 
the incident while the crew would assist in containing the eastern fire. 
 
FOXT477 was redirected to the paddock with access to the western fire  and established a 
hose to the rear of the eastern fire as well as a hose to the western fire. They ran out of water 
for about 15 minutes prior to the arrival of the tankers. 
 
A safety officer was established and eventually there would be another appointed, enabling 
both fires to have their own safety officer. 
 
1982
WANGANUI1 was advised of the incident at 2nd alarm and due to the day being windy 
immediately responded. En route he heard the 3rd alarm being transmitted. On arrival at 15:29 
Act 
hours he saw three pumps in attendance. He approached the OIC HIMA381, received a 
briefing and assumed command. The outgoing OIC was put in charge of operations. An 
incident ground sitrep was broadcast and an ICP was communicated with a sitrep to Comcen. 
 
Rongatea 251 (RONG251) arrived at 15:41 hours and supplied HIMA381 with water. They 
refilled from a village hydrant and proceeded to assist at the western fire with FOXT477. 
 
Two rural fire officers (RFOMANAWA1(PRFO), RFOMANAWA2(DPRFO) were also 
responding. En route two helicopters were put on standby, and at 15:40 hours a sitrep 
Information 
indicated two helicopters were responding. At about 15:46 hours both rural fire officers arrived. 
 
The PRFO and DPRFO were briefed by the IC and the incident was sectorised. The command 
structure was: 
  Incident Commander (WANGANUI1) 
  Operations                 (PRFO)  Official 
  Air Operations            (DPRFO) 
  Eastern Fire                (HIMA381 OIC) 

the 
  Western fire                (RFO) 
  Safety Officers            one per sector. The reason this structure was chosen was there 
was an agreed need to have a good command structure and personnel were used 
where their strength and expertise lay. 
 
under 
A communications plan was established with a separate operations channel for each sector, a 
command channel and an air ops channel. 
 
The DPRFO identified a helicopter landing site about 2km east of the fire. He went for a quick 
recce in the helicopter to ascertain the status of the incident and to identify water supplies. It 
was decided to use the treated clean water at the sewage treatment plant until the second 
helicopter arrived. The DPRFO assisted with setting up the bucket and foam and the helicopter 
was sent to work on the western pile and to wet down the slash piles near the village. All 
Released 
personnel working in this sector received notifications that air operations were to begin and 
moved crews to safety zones. A total of four buckets were initially dropped into this sector using 
 


treatment plant water before  the helicopter was redeployed to the eastern pile to prevent 
escalation to the pine trees. The DPRFO decided to use an alternative water supply for the 
helicopters from a lake near the fire. There would eventually be two helicopters working in 
separate areas for about 40 minutes 
 
At 16:30 hours the Command Unit (HCU) arrived and a sitrep indicating a command point had 
been established was transmitted two minutes later. A sitrep at this time indicated there was a 
fire involving forestry slash and toi toi approximately 500mx250m. Two sectors were 
established and multiple deliveries put in place. One helicopter in use and in offensive mode. 
 
At 17:07 hours a phone call was made to mobilise the Palmerston North OSU with hot and cold 
1982
food for 45 persons. 
 
Act 
Linton arrived with three demountable 2000l ultra high pressure (UHP) pods. These pods 
operate at 11000kPa and, with A Class foam, are specialist rural firefighting equipment. On 
arrival they reported to the ICP and were assigned the western fire to relieve FOXT477 to 
enable them to recommission and provide pump rescue response. VRFF volunteers arriving on 
tankers also assisted in the western sector with establishing dams and firefighting. Two of the 
UHP pods were set up at the southern and northern sides of the large western sector. The 
UHP equipment was reported to be extremely effective in extinguishing the fire. 
 
There was concern raised by the IC at about 18:00 hours of the impact on the village due to 
Information 
drawing water from the Himatangi Beach village reservoir.  
 
At 19:27 hours a sitrep indicated the rural fire force were taking over the incident from urban 
and a K45 was transmitted indicating the DPRFO was in command. 
 
During the evening the fire continued to be dampened down, an excavator was used to assist by 
Official 
breaking down the piles and at 23:54 hours a stop message was transmitted 
 
the 
Findings 
The fol owing is a list of findings: 
 
under 
1.  Additional tankers were requested en route. Due to three rural tankers failing to meet legal 
weight restrictions and being unable to respond there is concern there will be a critical gap 
for larger incidents in this area. 
2.  The first arriving officer used one of his crew to conduct an initial size up. It was identified 
there were two distinct fires with one having the potential to escalate into a small pine 
plantation. The western fire was not assessed. The local knowledge of the area assisted the 
Released 
OIC to decide to attack the fire near the plantation knowing the other wouldn’t be posing the 
same escalation risk. 
 


3.  Initial tactics were to work from the flank with a CAF delivery to prevent the eastern fire from 
reaching the pine plantation. The western fire was sectorised and delegated to later arriving 
appliances. Subsequent commanders implemented air operations to extinguish the fire 
fol owed by ground operations to mop up. 
4.  Helicopters and additional tankers were requested by the RFO en route. 
5.  The incident management team was very ef ective with personnel assigned to roles where their 
expertise lay, rather than assume roles based on rural/urban principle and firefighters whether 
urban or rural worked together seamlessly. 
1982
The command structure was: 
Incident Commander (WANGANUI1) 
Act 
Operations                 (PRFO) 
Air Operations            (DPRFO) 
Eastern Fire                (HIMA381 OIC) 
Western fire                (RFO) 
Safety Of icers            one per sector 
This structure was reported to have been ef ective with the personnel with rural knowledge and 
Information 
experience managing Operations, Air Operations, and Sector Commander, and urban of icers as 
Incident Commander, Safety, and Sector Commanders. 
6.  Army rural fire pods were requested by the RFO. These are not on a predetermined response 
and there is no MOU governing their use. The Ultra-High Pressure (UHP) pods from defense 
Official 
were extremely ef ective. 
7.  An ICP was established at the entrance to the eastern fire. The Command Unit provided a 
the 
place to brief personnel, al owed for everyone at the incident to be accounted for, and 
produced an eIAP for incident management. 
8.  A four-channel communication plan was implemented. Command, Sector east, Sector west, air 
operations. 
under 
9.  Two safety of icers were appointed, one per sector. They managed al  of the hazards within 
their respective sectors including ensuring ground personnel were in a safe area when air 
operations were conducted. 
10.  Although posing no health risk, concern was expressed by some ground crews regarding the 
use of treated ef luent by air operations initial y. Subsequently water was located from a more 
Released 
distant water source. 
 


11.  Thermal Imaging Cameras were ef ective in locating hot spots during mop up phase. 
12.  The new L1 RFF PPE was reported to be comfortable to wear al owing air to circulate, being 
two-piece, light and sturdy with ample pockets. 
13.  Rural PDAs had recently been amended and removed RFO from being notified of MIN first 
alarm vegetation fires. RFOs are resisting this change and feel if they were notified earlier there 
would be an earlier response of appropriate resource. 
14.  During work hours it is dif icult to get an urban volunteer response in this area. 
15.  Although crew welfare regarding refreshments was considered after about two hours into the 
1982
incident, the Operational Support Unit had to stop to buy the food, and then when served the 
hot food was stil  frozen. There needs to be a strategy in place to organise quick and ef ective 
Act 
meals to be delivered to an incident. 
16.  The replenishment of equipment used by volunteer stations at the incident requires more 
urgency. Consideration could be given to responding a VSO with hose and equipment on a 
trailer to enable pumps to be ful y recommissioned equipment wise on leaving the incident. 
17.  Carcinogen management. The removal and bagging of PPE prior to leaving the incident was 
not ful y understood. Rural firefighters have no paper overal s and have had no training 
regarding the carcinogen management programme. 
Information 
18.  Rural personnel are not supplied APR’s, rather they have a vented P2 dust mask. This may 
stop particulates however might not be so ef icient when working in smoky conditions. 
 
Conclusion 
Official 
Although not a large fire crews from Fire and Emergency rural and urban, as well as NZ Defence personnel 
attended this incident. These crews operated in a fully integrated and cooperative manner. Personnel were 
the 
assigned to roles that best suited their attributes which resulted in the urban commander retaining control 
while rural personnel addressed the operational requirements. 
The incident was well managed and the fire was extinguished quickly without causing unavoidable property 
damage to infrastructure or forest. 
under 
TICs were effectively used and NZ Defence provided state of the art UHP equipment which proved to be very 
effective in supporting strategy and tactics. 
Although there were no injuries it was raised during the debrief that carcinogen management in the rural 
environment  needs  to  be  more  actively  managed,  particularly  breathing  protection  and  post  incident 
decontamination. 
Commanders at this incident are to be commended for managing this incident with seamless integration that 
contributed to a good outcome. 