Thank you for contacting us requesting walking and cycling comments made during review of the Royal Oak 
roundabout upgrade. 
Consultation was undertaken twice over the project lifetime with relevant experts representing cycling and 
walking modes. This resulted in further discussion and optioneering to ensure this interim safety measure is 
aligned with the upcoming Connected Communities programme which is a longer-term integrated corridor 
initiative with the aim to improve people moving capacity, safety and support transport choices. The 
engagement with various internal active modes subject matter experts can be summarised as follows: 
1.  Early 2018: 
In summary, the team was in support of this interim safety measures at the roundabout with some 
queries and minor design comments regarding the raised crossings and placement. These were 
considered and incorporated into the design where possible (refer to attachment ‘Active modes 
Responses from internal stakeholders - Engineers response 2018’).     
2.  Early 2019: 
In summary, further minor design concerns were raised, which were considered and as 
incorporated into the design where possible (refer to attachment ‘Active modes Responses from 
internal stakeholders - Engineers response 20190805’). There were also discussions on whether 
further cycle infrastructure should be provided now, leading into the intersection and at the 
intersection. Given that this intersection is likely to be part of the proposed Auckland Cycle 
Network, it was agreed that it is best to proceed with the interim safety measures to deal with the 
immediate safety risk at this intersection. The longer-term solutions proposed through the future 
Connected Communities programme would provide the wider cycling solutions that integrate along 
the corridor and align with the outcomes of the Auckland Cycle Network. It is noted that these 
interim works will improve the safety of the existing zebra crossings as well as slowing vehicle 
speed approaching the intersection, which will enhance the safety for vulnerable road users, when 
compared to the current situation.    
Please find copies of the relevant correspondence attached along with the roundabout’s design scheme. 
We trust this information has addressed the matters raised however you have the right in accordance with 
section 27(3) of the Local Government Official Information and Meetings Act 1987 (LGOIMA) to make a 
complaint to the Office of the Ombudsman if you are not satisfied with our response. 
Ngā mihi 
 
 
 



 
 
 
 
 
 
Randhir Karma 
Group Manager – Network Management 
 
Enc: 
Email Correspondence - LGOIMA - CAS-1168474-Z7R4Z6.pdf 
MIP1718-235 drawing.pdf 
Active modes Responses from internal stakeholders - Engineers response 2018 
Active modes Responses from internal stakeholders - Engineers response 20190805 
 
Page 2 of 2